Mobeen Ashraf
Assistant Manager Production Engineering at Changan Pakistan- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
Changan Pakistan
-
Motor Vehicle Manufacturing
-
200 - 300 Employee
-
Assistant Manager Production Engineering
-
Sep 2020 - Present
• Successful implementation of locally designed locators for Trim and Chassis carrier common For New SUV, Alsvin, Karvan and M9. • Eliminated the changeover of lifting arms at Trim to Chassis “Loading lift” by designing a common arm, which is compatible with all models thus saving 2 manpower. • Installed two ADAS Calibration Equipment to calibrate Adaptive cruise control and 360° camera at VPI line. • Cost Reduction of about 5.4 million annually by replacing windshield sealer cartridges with barrel and installed Dual barrel sealer dispenser to save time as well. • Installed manipulators for Skylight, IP, Seat, Door, Spare Tire and Fuel tank. • Achieved takt time of 9 minutes, increasing capacity from 30 units/shift to 40 units/shift. • Conducted SVP of Alsvin in Assembly Shop. • Achieving takt time of 5 min with process improvement projects. • Planning, Budgeting & controlling of the Projects Timelines of Assembly Projects. Show less
-
-
-
Galaxy Polymer Engineering Pvt Ltd
-
Pakistan
-
Motor Vehicle Manufacturing
-
1 - 100 Employee
-
Production And Inventory Control Manager
-
Aug 2020 - Sep 2020
• Daily Inventory Checking Reconciliation of GR & INVOICE. • Received & Issue stores supplies, equipment and compiles records of supply transactions • 5S implementation and audits in the material kitting area and production floor. • Verifies that supplies received as per Requisition. • Monitoring and control of Production against the Master Schedule. • Daily Inventory Checking Reconciliation of GR & INVOICE. • Received & Issue stores supplies, equipment and compiles records of supply transactions • 5S implementation and audits in the material kitting area and production floor. • Verifies that supplies received as per Requisition. • Monitoring and control of Production against the Master Schedule.
-
-
-
Pak Elektron Limited
-
Pakistan
-
Appliances, Electrical, and Electronics Manufacturing
-
700 & Above Employee
-
Intern
-
Aug 2020 - Sep 2020
• Observed and analyzed the current process. • Identified the wastages and suggested recommendation. • Audited and calculated the efficiencies and idle time of workers. • Completed a course named Bloom which was designed to increase soft skills and part of internship. • Observed and analyzed the current process. • Identified the wastages and suggested recommendation. • Audited and calculated the efficiencies and idle time of workers. • Completed a course named Bloom which was designed to increase soft skills and part of internship.
-
-
-
Book Store
-
Bangladesh
-
Book Publishing
-
Intern
-
Jul 2020 - Aug 2020
• Implemented 5S in the Workplace. • Managed the ERP and ensured optimum level of inventory. • Analyzed and identified bottle in the process. • Developed strategies to assist Logistics team which increased their efficiency. • Effectively managed and Led multiple people at a time. • Implemented 5S in the Workplace. • Managed the ERP and ensured optimum level of inventory. • Analyzed and identified bottle in the process. • Developed strategies to assist Logistics team which increased their efficiency. • Effectively managed and Led multiple people at a time.
-
-
-
Pak Suzuki Motor Company Limited
-
Pakistan
-
Motor Vehicle Manufacturing
-
700 & Above Employee
-
Project Trainee
-
Sep 2019 - Jun 2020
• Optimized the process with application of Lean Manufacturing Tools by identifying and eliminating wastages at their critical station. • Improved Production efficiency by reducing Cycle time by 7.6 %. Verified through Witness Simulation Software. • Designed assembly floor layout station which led to reduction in Non-Value Adding activities by 5.98 %. • Improved Workflow by modeling Gravity Feed Conveyor on Pro E to reduce transportation and work in process inventory 6.5 %. Show less
-
-
-
Atlas Engineering Ltd.
-
Pakistan
-
Automotive
-
1 - 100 Employee
-
Intern
-
Jul 2019 - Aug 2019
• Conducted Time study to calculate Cycle Times of Aluminum and Cast-iron foundries. • Improved Production efficiency by 9% by reducing Cycle Time. • Planned and Calculated material consumption for the process through Bills of Material. • Conducted Motion study to improve the Workflow. • Implemented Kaizen which led to reduction in Workforce by 2.5 %. • Conducted Time study to calculate Cycle Times of Aluminum and Cast-iron foundries. • Improved Production efficiency by 9% by reducing Cycle Time. • Planned and Calculated material consumption for the process through Bills of Material. • Conducted Motion study to improve the Workflow. • Implemented Kaizen which led to reduction in Workforce by 2.5 %.
-
-
-
Karachi Tools, Dies & Moulds Centre
-
Automation Machinery Manufacturing
-
1 - 100 Employee
-
Intern
-
Jul 2018 - Aug 2018
• Learned about designing and manufacturing of Die and Molds. • Learned how to position a part on Computer Numeric Control machines. • Designed a part on PTC Creo and manufactured it on a milling machine. • Learned about designing and manufacturing of Die and Molds. • Learned how to position a part on Computer Numeric Control machines. • Designed a part on PTC Creo and manufactured it on a milling machine.
-
-
Education
-
National University of Sciences and Technology (NUST)
Bachelor's degree, Industrial and Manufacturing Engineering -
Adam Jee Government Science College
Intermediate, Pre-Engineering