Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • SIS DCS DeltaV Maintenance
    EMERSON
    Jul, 2012
    - Sep, 2024
  • Micromotion & RFD
    Control Systems
    May, 2012
    - Sep, 2024
  • Wireless Transmiter
    EMERSON
    Jan, 2012
    - Sep, 2024
  • T-BOSIET
    Samson Tiara
    Sep, 2012
    - Sep, 2024

Experience

    • Indonesia
    • Building Materials
    • 1 - 100 Employee
    • GM
      • Dec 2018 - Present

    • Italy
    • Engineering Services
    • 700 & Above Employee
    • instrument and automation engineer or Superintendent Tie-In LNG Train 1&2 and Train 3
      • Nov 2016 - Dec 2018

      British Petroleum Tangguh LNG Train 3 Expansion Project British Petroleum Tangguh LNG Train 3 Expansion Project

    • Indonesia
    • Oil and Gas
    • 1 - 100 Employee
    • Instrument and Systems Control Engineer
      • Feb 2015 - Nov 2016

      Pipe Line Project:1. Pekanbaru Pipe Line Project ( Offtake Station )2. Duri-Dumai Pipe line Project (Offtake Station)3. WNTS Tie-in for ORF Pemping4. Gas Compressor Pagardewa5. Tie-In modification at JOB Pertamina Jambi Merang and Pipe Line Pekan barujob discription :• Be a part of the instrument design team working on onshore feasibility, conceptual, basic engineering, FEED, detailed design • Perform instrument engineering activities and review all activities carried out by Engineers, Designers from EPC• Liaise with other departments, clients, vendor, subcontractors, third parties and approving• Participate in all design review such as HAZOP, SIL, P&ID review and 3D model review meetings• Prepare and aprroved any work procedures for manufacturing, handling, assembling of the equipment according to client requirement. 1.Prepare instrument design basis;control and shutdown philosophy and control narrative.2.Review/Approve specifications for all field Instrumentation, Control valves, Metering systems and Analyzers, On-off valves, Safety relief valves, DCS, ESD and FGS system and perform vendor offer review & technical bid evaluation, carryout vendor drawings/documents review and vendor data incorporation for the above instrument.3.Review/Approve General specificatio data sheets, & requisition for all field Instrumentation, Control valves, Analyzers, On-off valves, Safety relief valves, DCS, ESD and FGS system and perform vendor offer review & technical bid evaluation etc.4.Review/check calculations for control valves, safety relieve valves, flow elements, restriction orifice; thermo well wake frequency and selection of the suitable valve.5.Prepare/check Instrument system architecture; cause and effect matrix; inter-lock logic diagram; wiring and block diagrams.6.Review/Approve fire & gas and telecom system7.Review/Approve all Instrument Document8.Participate in Factory acceptance test and site acceptance test,commissioning and start-up

    • Indonesia
    • Oil and Gas
    • 1 - 100 Employee
    • PMC Instrument Engineer at 1.PT.NUSANTARA REGAS 2.PGN (perusahaan Gas Negara)
      • Mar 2013 - Mar 2015

      FSRU and Pipe Line Project:1.Nusantara Regas FSRU and ORF PHE ONWJ2.Offtake station from FSRU lampung (PGN)job discription :• Be a part of the instrument design team working on onshore feasibility, conceptual, basic engineering, FEED, detailed design and EPC/ EPCM projects• Perform instrument engineering activities and review activities carried out by Engineers, Designers• Liaise with other departments, clients, vendor, subcontractors, third parties and approving• Participate in all design review such as HAZOP, SIL, P&ID review and 3D model review meetings• Prepare and aprroved any work procedures for manufacturing, handling, assembling of the equipment according to client requirement. 1.Prepare instrument design basis;control and shutdown philosophy and control narrative.2.Review/Approve specifications for all field Instrumentation, Control valves, Metering systems and Analyzers, On-off valves, Safety relief valves, DCS, ESD and FGS system and perform vendor offer review & technical bid evaluation, carryout vendor drawings/documents review and vendor data incorporation for the above instrument.3.Review/Approve General specificatio data sheets, & requisition for all field Instrumentation, Control valves, Analyzers, On-off valves, Safety relief valves, DCS, ESD and FGS system and perform vendor offer review & technical bid evaluation etc.4.Review/check calculations for control valves, safety relieve valves, flow elements, restriction orifice; thermo well wake frequency and selection of the suitable valve.5.Prepare/check Instrument system architecture; cause and effect matrix; inter-lock logic diagram; wiring and block diagrams.6.Review/Approve fire & gas and telecom layout; and E&I and control room layout.7.Review/Approve Instrument cable tray layout,cable layout,cable schedule,tubing schedule, Installation detail, hook up drawings and bulk material take off.8.Participate in Factory acceptance test and site acceptance test,commissioning and start-up

    • Oil and Gas
    • 1 - 100 Employee
    • Service Engineer
      • May 2011 - Feb 2013

      Responsible for any project and troubleshooting and maintenance for Oil & Gas project.,specialist for Automation, electrical and Instrumentation likes PLC (Omron, Allen-Bradley, modicon, sneider, Siemens, etc ), HMI (in touch Wonderware ,IAS), DCS and SCADA ( DELTA V, SIS (Safety Integration Sistem) or SIL ( Safety Intergration Level) ,Yokogawa, Cimplicity ), Metering System like product from (ROSEMOUNT, DANIEL, FISHER, MICROMOTION, ATG/TANK Radar, Wirelles for instrument transmitter, AMS system), maintenance,Troubleshooting, Wairless configuration, fieldbuss.etcExperience Project :Service Engineer& Instrument Engineer1 .Project PertagasLPG Plant and NGL Plant (DCS Delta V)- Configuration HMI- Configuration Logix and Modbuss- Configuration web systems for DCS- SAT, FAT for LPG and NGL2. Evonic Degusa (DCS DeltaV)- Migration systems from Siemens to DCS Delta V- Maintenance and troubleshooting3. Domba Mas ( Wireless)- Installation Wireless instrument (Flow transmitter and pressure transmitter )4. CONOCO (maintenance DCS and metering flowboss S 600)- Maintenance and troubleshooting DSC systems for Duyong and WNTS (ORF) from system VSAT- Upgrade Delta V systems from 8.2 to 11.25. Rohm and Haas (DCS and Field Device )- Engineering, installation, FAT, SAT, Commissioning for New project CIP, Caustic transfer, A420 use DCS Delta V.6. Chevron (DCS and Fieldbus)- Engineering Delta V for change process systems existing to new Philosophy include Logix and HMI- Installation Control Valve, Annubar, Flow transmitter, Level transmitter, fieldbuss instrument and Control valve.8. Upgrade DCS DeltaV and SIS engineering for Conoco Phillips 9.Upgrade DCS DeltaV Chevron SLN South Sumatera10. Suban condensate engineering DCS Conoco Phillips11. suban fire water and shipping Pumps engineering Conoco Phillips12. Polychemindo karawang Troubleshooting and configuration new plant13. Demo Mini Plant for PT. Kulu Bersaudara (Politeknik Aceh)

    • Plant Engineer
      • Feb 2010 - Apr 2011

      perform maintenance Power Plant (Combined Cycle Power Plant monitoring system, control system design, repair troubleshooting on electrical systems and instrumentation applications SCADA or DCS systems, mechanical systems, distribution systems, analysis of production systems in gas turbine generators and gas compressors for natural gas). installation and construction of substation distribution system repairs and troubleshooting on electrical power distribution system to customers, administrative and calculation of gas consumption needs as well as the sale of electric energy per month.

    • Automation Machinery Manufacturing
    • 1 - 100 Employee
    • ya
      • Dec 2008 - Feb 2010

      PLC programming and HMI or SCADA system for the project at Nestle Indonesia, Pakistan and the Philippines, service engineer (monitoring of production systems at the customer at Nestle, troubleshooting electrical systems, mechanical and instrument production system, the FAT project, project commissioning, repair and control system design SCADA or DCS system on the drawing PID and new programs, documentation and system analysis reports, etc.Experience Project :1. Nestle Indonesia FAT, SAT, Commissioning 2. maintenance contract with Nestle Indonesia

Education

  • University Muhammadiyah Malang
    Sarjana Elektro, System Control
    2004 - 2008
  • University Muhammadiyah Malang
    barchelor degree, Teknik Elektromekanis (Electromechanical Engineering)
    2004 - 2008
  • SMUN 2 Sidoarjo
    Student, IPA
    2001 - 2004

Community

You need to have a working account to view this content. Click here to join now