Mirza Iddin

GEES at PETRONAS RESEARCH SDN. BHD.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Cyberjaya, Selangor, Malaysia, MY

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Bengkel OSH Coordinator (OSH-C) JKKP IKS/SBK 127/491/2 (02)
    XP Technic Solutio
    Feb, 2021
    - Oct, 2024
  • Aerospace Engineering Specialization Certificate (AESC)
    Faculty of Mechanical Engineering UiTM Shah Alam

Experience

    • Malaysia
    • Consumer Services
    • 100 - 200 Employee
    • GEES
      • Apr 2021 - Present

    • Malaysia
    • Plastics Manufacturing
    • 1 - 100 Employee
    • Business and Development Intern
      • Jul 2019 - Sep 2019

      a) Demonstrated my knowledge in Catia by performing tasks such as providing bill of material (BOM), 2D drafting and 3D drawing adjustments which allows the organizations of documents for future reference.b) Involved in a team of staffs to successfully prepared 32 files of documents to be reviewed by clients from Toyota in a major meeting.c) Completed the testing of a new assembly jigs of a 2019 Perodua Bezza dash frame for its workability within 2 weeks of given time and 44% lesser plastic waste.d) Teamed up with co-worker for small projects of developing a cooling jig and managed to communicated with vendors for affordable and reasonable quotation.e) Inspected over 300 gear shifts in 2019 Proton Saga for defected gear knob button for repair or replacement in Proton Shah Alam manufacturing complex.Achievementsa) Converted a 3D drawing of 2019 Perodua Axia bumper into 2D drawing to be included in an official blueprint for client’s review.b) Successfully made sure the 100% workability of the new assembly jigs which will improved the ergonomic of assembly’s staffs working procedure.

    • Malaysia
    • Plastics Manufacturing
    • 1 - 100 Employee
    • Production Intern
      • Dec 2016 - May 2017

      a) Tasked by the technician to monitor the workability of injection moulding machine everyday which reduced the machine’s parameter uncalibrated mistaked by 40%.b) Performed inspection on all the machines’ product output by monitoring the common defects on plastic products which detected 3 out of 10 types of plastic injection defects.c) Calibrating the machine’s by running the plastic injections output until the plastic products has no defects. Achievementsa) Increased the production target weekly by 7% by ensuring the products has less to no defects.b) Decreased the wastage of plastic grain supplies by reducing the need of more testing and running of plastic injection machine by increased productivity and less defects.

Education

  • Universiti Teknologi MARA
    Bachelor's degree, Mechanical Engineering
    2017 - 2020
  • Universiti Teknologi MARA
    Diploma, Mechanical Engineering
    2014 - 2017
  • Sekolah Menengah Sains Tuanku Ja'afar
    SPM, 8A, 2B
    2012 - 2013

Community

You need to have a working account to view this content. Click here to join now