Ming Zhou

Sr. Drilling & Completions Engineer at Osum Oil Sands Corp
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
CA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Canada
    • Oil and Gas
    • 1 - 100 Employee
    • Sr. Drilling & Completions Engineer
      • Sep 2011 - Present

      Planned and drilled SAGD wells, water/disposal wells, well abandonment and winter drilling projects; Thermal well workover, include PCP/ESP change, tubing/FCD reconfiguration, gas lift conversion; Specially designed and completed water/disposal dual-function well completion. Planned and drilled SAGD wells, water/disposal wells, well abandonment and winter drilling projects; Thermal well workover, include PCP/ESP change, tubing/FCD reconfiguration, gas lift conversion; Specially designed and completed water/disposal dual-function well completion.

    • Canada
    • Oil and Gas
    • 700 & Above Employee
    • Sr. Staff Drilling Engineer
      • Aug 2008 - Sep 2011

      Successfully drilled Husky’s Tucker Pad B Re-drill infill wells, on time and under budget; Sunrise drilling project evaluation, detailed project execution plan, executed the projects; In charge of new technology evaluation, management of change, cost and performance evaluation. Successfully drilled Husky’s Tucker Pad B Re-drill infill wells, on time and under budget; Sunrise drilling project evaluation, detailed project execution plan, executed the projects; In charge of new technology evaluation, management of change, cost and performance evaluation.

    • Canada
    • Oil and Gas
    • 700 & Above Employee
    • Sr. Drilling Engineer
      • Jan 2005 - Aug 2008

      Successfully drilled Suncor’s 1st SAGD well through steam chamber, detailed plan with all possible scenarios; Review and analyze new technologies that may be applied to the operation; Technically review and evaluate all service companies before and during using them; Develop / role out well control manual for Firebag SAGD wells. Successfully drilled Suncor’s 1st SAGD well through steam chamber, detailed plan with all possible scenarios; Review and analyze new technologies that may be applied to the operation; Technically review and evaluate all service companies before and during using them; Develop / role out well control manual for Firebag SAGD wells.

    • Qatar
    • Oil and Gas
    • 700 & Above Employee
    • Senior Drilling Engineer
      • 2000 - 2005

      Drilling Engineer and Drilling Superintendent for Dukhan on shore drilling project, all HPHT wells. Drilling Engineer and Drilling Superintendent for Dukhan on shore drilling project, all HPHT wells.

  • Various Oil Companies
    • South East Asia, Middle East
    • Roughneck, DD and Drilling Engineer
      • Jan 1991 - Dec 2000

      Worked for various oil companies as rig hand and DD; Drilling Engineer in field and office. Worked for various oil companies as rig hand and DD; Drilling Engineer in field and office.

Education

  • China University of Petroleum, Beijing
    Master of Science - MS, Engineering
    1988 - 1991

Community

You need to have a working account to view this content. Click here to join now