MILIND JAGE

Resident Engineer at Worley
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Masqaţ, Oman, OM
Languages
  • English -
  • Marathi -
  • Hindi -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Post Graduate Diploma in Construction Management
    NICMAR
    Dec, 1996
    - Oct, 2024

Experience

    • Brazil
    • Business Consulting and Services
    • 700 & Above Employee
    • Resident Engineer
      • Jan 2021 - Present

      Development of Port with Multipurpose Berths at Dibba Musandam, Oman - Quay wall berths (6 Nos.) of various lengths and depths each for Shiplift, Tourism, Coast Guard, Ferry, Public/ Material Transport & Fishery. - Concrete floating pontoons, gangways, etc. - Two rubble mound breakwaters 1.5km and 0.6km protected with Concrete Armour Units (Coreloc) to create a harbour basin - Dredging the port basin, navigation channel, and quay wall trenches - Reclamation to create land for bldg & infrastructures, and marina facilities - Design, supply, and installation of navigation aids - Construction of multiple buildings (17 Nos.) including utility network, for Administration, Fish auction, Facilities 2 Nos., Ferry terminal, Prayer Hall, Ice plant, Net repair shed, Workshop, Fisherman stores 3 Nos., MAF, Guard House 3 Nos., Tourism 2 Nos. - Bulk Earthworks, Roads & pavement, and Utility corridors RESPONSIBILITIES & DUTIES: • Liaise/ coordinate with stakeholders, contractors, clients, and local authorities • Lead and manage the site engineering, supervision team • Coordinate with the design team for any modifications • Coordinate with the client for any amendments/ variation/ change orders to the contract • Ensure compliance with the conditions of the contract, specifications, and drawings • Keep a close check on the progress of the work and, where delays appear to happen, advise the Contractor to submit a recovery schedule and ensure progress meets the program • Arrange risk workshop, and planning workshop for review of project schedule • Correspondences with all parties, prepare contractual letters • Arrange meetings for coordination/ progress of work and prepare/ circulate MOM • Check contractors’ payment applications, issue payment certificates, evaluate claims • Prepare and submit progress reports • Review/ respond to Contractor technical submittals, ensure it conforms with the contract requirements • Evaluate/ approve SC Show less

    • China
    • Construction
    • 700 & Above Employee
    • Construction Manager/ Technical Team Leader
      • Mar 2017 - Dec 2020

      Port Development for Hassyan Coal Power Plant (4 x 600MW)-Phase 1 (EPC Contract) that includes; Quay wall (300m at -7.8m DMD dredge level) berthing facility each for Coal, Ash, and Tugboat vessel that includes utility service gallery, utility/ anchor pits, crane rail system, foundations (for ship loader, ash loader, ground anchors, lighting), drainage network, quay wall furniture Dredging (2.3 million cum up to -14m DMD) for quay wall berthing trench, harbour basin, navigation channel 1.4km long, 180m wide, intake/ outfall pipeline submarine trench 7km long, 36m wide. Reclamation of land on coastline, ground improvement, gravel piling Breakwaters 2Nos, 0.5km long and revetment 1.0km long. GRP pipeline 4m dia. onshore and offshore. For seawater Intake 5.0km long, each pipe 18m, 1711 pipes up to -13m DMD and Outfall 3.3km long, each pipe 12m, 1627 pipes up to -12m DMD, connection to 6Nos. RCC sea water Intake Riser structures (-16m DMD), aeration discharge basin, and pump station. HDPE Chlorination dosing pipeline, 0.25m dia. 5km long. Buildings for substation, administration, workshop, warehouse, underground sewerage treatment plant, parking, port infrastructure & utility network. road Duties: • Prepare work plan and construction methodology and assign the task to the construction team • NOC liaison/ management - Prepare and submit the technical dossier to authorities to obtain construction NOC/approvals. Follow up with the consultant to obtain design NOC. • Coordination with multidisciplinary teams in the preparation of drawings and other technical submittals • Prepare and submit technical documents to the consultant and client • Resolve technical issues and provide technical advice to the execution team in consultation with the design/ consultant/ client office • Prepare and submit monthly project reports to the client and consultant • Monitor sections of work, and ensure that activities are completed as per the schedule and quality requirements Show less

    • United Arab Emirates
    • Construction
    • 300 - 400 Employee
    • Resident Engineer
      • Sep 2014 - Feb 2017

      Associated projects are shown below; Design & Supervision Project 1: Development of RAK Fisherman’s Port & Marina Corniche Client/Contractor: Crown Prince Court/CHEC Value: AED 250 Million • Fisherman’s harbour includes reclamation of land, dredging up to (-) 3.00 ACD, and coastal protection, construction of Quay wall up to (-) 3.0 ACD, accommodation and storage facility buildings G+1 including asphalt road network. • Marina Corniche 1.8 Km long that includes seabed excavation up to (-) 4.0 ACD, rock revetment works, Sea wall 1.7m x 1.2m, construction of road including parking lots, storm water drainage system, paved sidewalks including car parks, handrail, concrete floating pontoons 60m long/4m wide, slipways, relocation of existing FRP pontoons. Project 2: Causeway Sealink 2.2km for transportation between Al Aryam & Ghezlan Islands Client/Contractor: Crown Prince Court/CHEC/ Orascom/Al Negm Foundations Value: AED 120 Million • The project entailed the construction of a causeway, bridge and road works with total length of 6.0 Km to provide a connection between Al Aryam & Ghezlan Islands. • Skew Bridges 2 numbers for navigation channels, 120m long triple span and 40m long single span having precast pre-stressed I-girders. • Rotary bored cast in-situ piles, 44 Nos. maximum up to 1300 mm diameter and up to -22m ACD, • Reclamation for causeway includes embankment fill from -3.5m ACD up to +10.5m ACD. • Soil improvement works (by dynamic & vibro compaction) for embankment fill. • Rock revetment works for embankment slopes. • Cross drainage works (RCP culverts 2m dia. & 1m dia. at 4 locations each with multiple rows) • Asphalt and footpath work. Project 3: Al Salama Yatch Marina Client/Contractor: Crown Prince Court/NMDC Value: AED 130 Million • Construction of sheltered mooring facility for a vessel that includes dredging of approx. 0.2 million cum for access channel and berthing basin, breakwater, quay wall and berth. Show less

    • France
    • Engineering Services
    • 700 & Above Employee
    • Assistant Resident Engineer
      • Mar 2012 - Aug 2014

      Project 4: Coast Guard Base & Lusail Reclaimed Islands - Design & Supervision Client/Contractor: Private Engineering Office/UCC/Great Lakes/Boskalis Value: AED 800 Million • Quay wall (blockwork) 300m long • Bridge 22 spans, 440m long with 20m precast prestressed I-girder typically 0.9m deep & 0.65m wide for access from the mainland to the Island and construction of berthing facility for Yacht. • Dredging of approx. 7.0 million cum for 32Km long, 86m wide navigation channels, Coast guard base and deep up to (-) 8.8m chart datum using CSD and TSHD. • Reclamation by using the dredged material for construction of 4 offshore Islands including shore rock protection works. • Excavation of 1.5 million cum using drilling & blasting techniques and reclamation works to configure the existing Island’s shape, Island and shoreline rock revetment and groynes, RCC Sea wall, artificial beaches along shoreline. • Permanent protection works for Lusail Islands that includes 4Km long rock revetment works along shoreline, groynes, sea wall and artificial beaches. Duties and responsibilities include; • Supervise the works and ensure that it is carried out in accordance with the contract documents, approved drawings, MSRA, standards, codes and specifications. • Review/ comment and approve contractor’s technical submittals such as method statements, quality control plan, request for information, ITP, HSE Plan, materials, vendors, etc. • Review of shop drawings • Resolve contractor’s technical issues in consultation with seniors • Evaluate and approve subcontractors, vendors, and suppliers • Close-out of work Inspection Request, non-conformances, site instructions • Follow-up for the clearance of audit NCRs • Identify constraints and recommend corrective action • Coordinate with the design team for changes in the IFC drawings • Attend progress and coordination meetings with the Client and Contractor • Manage project to meet time constraints Show less

    • Australia
    • Mining
    • 700 & Above Employee
    • Senior Project Engineer
      • Feb 2009 - Dec 2011

      Project: Gladstone LNG Terminal, Curtis Island, Gladstone • Rock revetment works (along access road and shoreline) and berthing facility. • Road work (from Curtis Island shore to LNG site) & development of facility area for LNG terminal that includes; Bulk earthwork (cut to fill approx. 4 million cum), Cross drainage works (RCPC & RCBC-36 Nos.), Retaining structures, Batter slope protection, Sedimentation ponds (3 Nos.) and Hydro‐testing storage pond, Protective treatments, Chipping and Mulching 150ha and 4 Km of fencing works. Duties and responsibilities include: • Supervision of earthworks, revetment works and temporary berthing facility. • Notify promptly of in house and subcontractor variations, claims, or other contractual issues and maintain proper QA/QC records. • Forecast against cost codes and update monthly project program. Advise promptly of planning, programming and resourcing issues that require resolution. • Prepare, obtain approval and implement PQP, Inspection Test Plans and Work Method Statements. • Attend progress, coordination and quality control meetings with the clients and consultants. • Exchange of correspondences with the consultant, design team, suppliers. • Arrange for technical submittals to consultant. • Recommend solutions to closeout non-conformance's and prevent re-occurrence. • Prepare daily/ weekly/ monthly progress reports. • Prepare weekly look ahead schedules. • Monitor work progress and update schedule. • Prepare material, manpower, equipment schedule as per work program and arrange/procure as per the requirement. Show less

    • United Arab Emirates
    • Construction
    • 200 - 300 Employee
    • Construction Manager
      • May 2006 - Jan 2009

      Project 1: Submarine pipeline for water transmission under Sharjah creek • Installation of 2nos., 0.5Km long 800mm diameter HDPE pipelines across creek that includes dredging, trench excavation below existing creek bed level up to (‐)7m chart datum, bathymetric survey, construction of onshore sheet pile cofferdams, underwater concreting, backfilling trench with fill material, geotextile & rock cover for pipeline protection. Project 2: Foot Bridges 7 Nos. Dubai that includes all aspects from the initial architectural concept, overall design and construction. Steel piled foundations, in-situ concrete abutments, precast concrete stair, and structural steel girder of 35 to 48 m single span depending on location. Project 3: Palm Jebel Ali Water Homes 504 nos. • Driving of 2900 Nos. steel tubular piles, maximum up to 1120mm diameter and up to 24.8m long. Project 4: Construction of 600m long block work quay wall jetty for ADNEC • Dredging trench up to (-) 8m chart datum to form a foundation for block work quay wall jetty. Project 5: Chilled Water Distribution Network for District Cooling Project • Installation of underground pre-insulated CSl and GRP pipeline approximately 3Km using non-disruptive road crossing techniques such as micro-tunnelling, thrust boring, sheet pile cofferdam and trench shoring depending on the soil strata. Duties and responsibilities include; • Prepare and implement work plan and construction methodology • Arrange for technical submittals to the consultant • Coordination with the design team for technical matters • Supervise daily construction activities at the site • Liaise with subcontractors, consultants, clients, locals, government & other authorities (DM, DEWA, RTA, ETISALAT, DURL, ADM, TRANSCO) in order to manage work interfaces, obtain NOCs • Coordinate for the enhancement to project scope and site logistics control • Work out quantities and prepare cost estimates. Invite quotations and prepare comparison statements Show less

    • Civil Engineering
    • 1 - 100 Employee
    • Senior Marine Engineer
      • Jun 2005 - Apr 2006

      Project: Marine Works for North Bahrain New Town for Ministry of Works & Housing • 35 million cum dredging, 490ha of reclamation of new islands using dredged material. Rock protection works for shoreline and on‐shore channel lining for approximately 16Km. Creation of navigation channels and bays in and around islands and associated marine works. Duties and responsibilities include; • Review and approve document submittals (Method Statements, Quality Control Plan, Inspection and Test Plans, HSE Plan, and Materials) • Ensure site inspection, testing and reporting are in line with the approved Inspection and Testing Plan • Verify and approve test reports, survey data (land & marine) for setting-outs, construction tolerances • Conduct audits and ensure all the project procedures and documents are in line with project requirements • Assist the QS team to evaluate and assess the value of periodic work progress and claims • Attend site works inspections and recommends approval and/or rectification • Ensure performance of dredging operations (for navigation, potential borrow area, lost time, rated capacity, discharge, transportation, spreading, directing silt) and reclamation works (fill material suitability, compaction, settlement) are in conformance with project specifications, standards & design • Assist seniors to resolve contractual and construction issues and recommend solutions in consultation with the project management team Show less

    • France
    • Construction
    • 700 & Above Employee
    • Senior Project Engineer
      • Jun 2003 - May 2005

      Joint Venture NSCC & Soletanche Bachy Project: Palm Jumeirah ‐ Quay wall, Underpass and Chiller plant ‐ Design & Built • Reinforced concrete diaphragm cantilever quay wall, 18.0-25.0m deep, 1.0m wide and 15.0Km long that includes capping beam, decorative precast fascia size 7.5mx4.0m and handrail along the wall for sea water canal. • About 125 nos. rotary bored cast in-situ piling 600-800m diameter, related structural works for construction of an underpass and chiller plant. • Earthworks, Ground Improvement (by Vibro compaction) and Rock Revetment works. Duties & responsibilities include; • Supervise and monitor construction of diaphragm wall and bored piling activities. • Responsible for testing works such as inclinometer test, strain and stress gauge test, cross hole sonic (integrity) test for monitoring the performance for diaphragm wall and piles. • Supervise Soil improvement works using deep vibro‐compaction method, monitor settlement and responsible for post reclamation testing works such as CPT, SPT, CBR and other quality control related tests. • Responsible for quality control during precast works, and installation stages of pre‐cast fascia elements for diaphragm wall cladding works. • Responsible for waterproofing and protective coating works. Show less

    • Construction Manager
      • Jan 2001 - May 2003

      Project 1: Liquefied Natural Gas Port Terminal Construction • Rubble mound breakwaters 2 nos. to provide shelter for LNG port terminal, each approx.1.2Km and 0.9Km up to (-) 15m chart datum. About 1.5 million tons of rock varying from 1kg to 10ton in seven grades. Partly protected with 2.5, 4.0 & 6.3 cum of concrete armoring units (Accropodes). Underground sea water intake and 2Km long outfall structures. Duties and responsibilities include; • Supervising core dumping operations, rock armour placing and profiling, accropodes placing, rock quarry supply and testing. • Attends marine and civil site works inspections and recommends approval and/or rectification. • Organize project progress/coordination meetings with the contractor. • Supervision of Contractor’s work (marine and civil works) as a Project Management team. Project 2: Seabird: Syncrolift Ship lift & Ship Transfer System, Dry Docking Facility for Indian Navy • Marine tubular steel pile (maximum 860mm diameter and up to 35m long, 736 vertical and 30 raker piles driving using techniques such as Jack up platform, piling barge and gantry piling depending on the location and suitability for Jetty works. Casting and erection of precast units up to 70 Tons. In‐situ works for deck slab, grouting for precast units and related ancillary works. Duties and responsibilities include; • Monitor driving operations and maintaining piling records for marine and land piles. • Organize and monitor installation of various precast unit and related marine in‐situ works for the best possible utilization of resources. • Design and prepare shop drawings for formwork of various precast units, arrange submittals and obtain approval from consultant. • Supervise in‐house fabrication and erection of gantry cranes for precast yard. • Interact and coordinate with consultant, commercial department and execution teams for clarification, identification of special items and obtain approvals for their shop drawings. Show less

    • India
    • Construction
    • 700 & Above Employee
    • Site Manager
      • Mar 1994 - Dec 2000

      Project 1: Breakwater Construction for Ennore Coal Port Project; HCC & Van‐Oord ACZ JV • Breakwaters 2 nos. to construct harbour basin, each approximately 3.2 Km and 1.3 Km up to (‐) 12m chart datum. Responsibilities include; • Supervising core dumping operations, rock armour placing and profiling, accropode placing, rock quarry supply and testing. • Jointly record measurement with the consultant, prepare measurement books, verify subcontractor and piece rate workers bills. Project 2: Mumbai‐ Pune Expressway • Expressway having formation width of 40.5m with controlled access including viaduct and cross drainage works Responsibilities include; • Prepare mass haul, monitor cut fill operations, subgrade placing, sub base and base material placing, conduct field tests, quality control works and conduct geotechnical investigations to assess the possible extent and quality of on‐site sampled materials as an options to use for road works. Prepare traffic management plan. • Involved in casting of precast girders. Monitor progress for various activities in line with time cycle. Prepare bar bending schedules and supervise cutting/ bending operations. Project 3: Underground Segmental Lining Sewage Tunnel using TBM; HCC & McNally France JV • Excavation for 2.8Km long, 3.0m dia. bored tunnel with simultaneous erection of Pre‐cast tunnel lining segments having 2.5m finished diameter using single shielded Tunnel Boring Machine. Three concrete lined shafts having 15m diameter and up to 30m depth. • Modification of existing structures that includes sewer lines, shafts, manholes, screen chamber and riser shaft. Responsibilities include; • Involved in development of precast yard which includes steel frame structure, casting bays, steam and water curing bays, stacking bays, installation of EOT cranes and casting moulds. • Supervise precast segment production and grouting works for tunnel lining. • Supervise concreting work for shafts and shoring for installation of sewer lines. Show less

Education

  • College of Engineering Pune
    Bachelor of Civil Engineering, Civil Engineer
    1988 - 1993
  • Lourdes English High School

Community

You need to have a working account to view this content. Click here to join now