Mikołaj Belter

Projektant Układów Torowych at Multiconsult Polska
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Gdańsk, Pomorskie, Poland, PL
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Poland
    • Business Consulting and Services
    • 100 - 200 Employee
    • Projektant Układów Torowych
      • Mar 2020 - Present

      - CPK Studium Techniczno-Ekonomiczno-Środowiskowe dla budowy linii kolejowej nr 85 na odcinku Łódź Sieradz Północny i linii kolejowej nr 86 na odcinku Sieradz Północny – Kępno – Czernica Wrocławska – Wrocław Główny - Projekt Budowlany i Techniczny "Rewitalizacja linii kolejowej nr 207 na odcinku Grudziądz - granica województwa" - Studium Wykonalności: "Włączenie Północnych Dzielnic Miasta Gdyni i Gminy Kosakowo w System Kolei Aglomeracyjnej na Obszarze Pomorskiej Metropolii" - CPK Studium Techniczno-Ekonomiczno-Środowiskowe dla budowy linii kolejowej nr 85 na odcinku Łódź Sieradz Północny i linii kolejowej nr 86 na odcinku Sieradz Północny – Kępno – Czernica Wrocławska – Wrocław Główny - Projekt Budowlany i Techniczny "Rewitalizacja linii kolejowej nr 207 na odcinku Grudziądz - granica województwa" - Studium Wykonalności: "Włączenie Północnych Dzielnic Miasta Gdyni i Gminy Kosakowo w System Kolei Aglomeracyjnej na Obszarze Pomorskiej Metropolii"

    • United Kingdom
    • Civil Engineering
    • 700 & Above Employee
    • Permanent Way Design Engineer
      • Mar 2015 - Mar 2020

      High Speed 2 - responsible for P-Way works: - designing horizontal and vertical alignments on High Speed 2 from Birmingham to Leeds and on junctions with existing Network Rail tracks - analysis of existing track conditions, - creating earthworks - designing S&Cs layouts Inland Rail Project in Australia - responsible for P-Way works: - designing horizontal and vertical alignments on Main Line from Parkes to Narromine with crossing loops and sidings - creating 3D model with drainage system - creating Plans, Long Sections and Cross Sections Show less

    • United States
    • Civil Engineering
    • 700 & Above Employee
    • Permanent Way Design Engineer’s Assistant
      • Feb 2012 - Feb 2015

      Responsible for: - preparation of tender documentation, - preparing horizontal and vertical alignments, - analysis of existing track conditions, - conceptual track design, - preparing cross sections, - preparing drainage. Designed horizontal and vertical alignments at six Polish Railway's Project and two English Railway's Project (Crossrail in London, UK). Responsible for: - preparation of tender documentation, - preparing horizontal and vertical alignments, - analysis of existing track conditions, - conceptual track design, - preparing cross sections, - preparing drainage. Designed horizontal and vertical alignments at six Polish Railway's Project and two English Railway's Project (Crossrail in London, UK).

    • Intern-Assistant Site Manager
      • Jul 2011 - Aug 2011

      Assisting Site Manager on building site - Blocks of flats. Responsible for coordination of labourer’s work. Assisting Site Manager on building site - Blocks of flats. Responsible for coordination of labourer’s work.

Education

  • Politechnika Gdańska
    Master's degree, Railway engineering
    2007 - 2012

Community

You need to have a working account to view this content. Click here to join now