Mike Doonan

Senior Superintendent at Walbridge
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Detroit Metropolitan Area, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Storm Water Management Operator - Construction Site
    Michigan Department of Environmental Quality
    Feb, 2018
    - Nov, 2024
  • Licensed Residential Builder
    State of Michigan
    Oct, 2003
    - Nov, 2024

Experience

    • United States
    • Construction
    • 700 & Above Employee
    • Senior Superintendent
      • Feb 2008 - Present

      - Lead Superintendent on projects ranging from $20 to $300 million dollars.- Use of Visual Planning to aid in overall scheduling and coordination of project- Conduct daily field huddles with foremen to review overall coordination- Maintain a safe and clean project site- Develop, Sequence and Maintain the overall Project Schedule - Direct contractor coordination meetings and field issue resolution.- Facilitate the Last Planner System daily and weekly work planning sessions- Promoted to Senior Superintendent in Dec 2018

    • United States
    • Construction
    • 700 & Above Employee
    • Superintendent / Construction Manager
      • 2006 - 2008

      - Managed all Civil, Structural & Architectural aspects of project - Assisted with the Mechanical & Electrical field coordination- Created & maintained project schedules using Primavera SureTrakEmergent BioSolutions - AVA Expansion ProjectLansing, MichiganA fast track design / build project for a 63,000 square foot, ground up 3 story pharmaceutical vaccine manufacturing facility. It was complete with a 16,000 sq. ft. clean room process space. It was a $52 million guaranteed maximum price project.

    • United States
    • Construction
    • 1 - 100 Employee
    • Senior Supervisor
      • 2005 - 2006

      Managed a UAW Skilled Trades workforce of 25 menCoordinated construction work with plant production schedules & personnel.Worked with Plant Engineering & Process Engineers to resolve issuesGeneral Motors - Willow Run Powertrain Plant Ypsilanti, MichiganAn existing operating transmission assembly plant – approximately 4.5 million sq. ft. located on a 335-acre site. A contract position within the General Motors Worldwide Facilities Group’s plant construction department where we utilized the UAW Skilled Trades (Millwrights, Welders, Electricians, Pipe Fitters, Painters, & Tinsmiths, etc.) to complete GM’s capital projects – such as machine relocation, & installation, demo of old equipment, safety & ergonomic projects.

    • United States
    • Construction
    • 700 & Above Employee
    • Assistant Project Superintendent
      • 2004 - 2004

      Managed all interior construction (MEP & Arch.) aspects of the project. Worked with city officials to obtain building inspectionsMonitored work daily for conformance, quality and schedule Jordan’s Furniture - Taunton, MassachusettsNew Distribution Center & WarehouseA $57 million dollar project consisted of 810,000 sq. ft fast track design /build ground up facility complete with 158 loading docks; 38 foot clear height storage rack system and a 50,000 sq. ft office space complete with high end architectural details. This warehouse was constructed using cast on site Tilt-Up exterior concrete walls to help expedite the construction schedule

    • United States
    • Construction
    • 700 & Above Employee
    • Superintendent
      • 1998 - 2003

      Project Experience with Turner Construction Company: Pfizer Pharmaceuticals – Global Research & Development CampusConnector Tunnel Project - Ann Arbor, MIA $10 million dollar, 450-foot long, 9,000 sq. ft. combination personnel, material and utility connector tunnel that connected the main Pfizer campus across a public 4-lane road with the new R&D facility (see Pfizer project below).Pfizer Pharmaceuticals – Global Research & Development CampusTechnical Development Facility - Ann Arbor, MIA $170 million dollar, two building complex consisting of both Office/Laboratory space and Drug Development and Manufacturing space. This new building complex totaled 415,000 square feet in size as was joined by a Center atrium and a connector tunnel to the existing research campus located across the street.The New Stadium for the Detroit Tigers Baseball TeamComerica Park - Detroit, MIA $300 million dollar new stadium construction project located over six city blocks in downtown Detroit. This structure consisted of the seating bowl (42,000 seats & 108 luxury suites) and was encompassed by seven support “outbuildings”. General Motors Global Headquarters at the Renaissance Center Office Towers Renovation - Detroit, MIMulti-phase $120 million dollar, 1.7 million square feet renovation project that consists of complete demolition and then reconstruction of 104 office floors located within four different high-rise towers. This project was part of a $500 million dollar renovation of the whole complex.Henry Ford Wyandotte HospitalMajor Modernization Project - Wyandotte, MIA four-story $27 million dollar addition that comprised of a new emergency room, maternity ward, surgical suite (with ten new operating rooms), and an equipment sterilization area that serviced the whole hospital.

    • United States
    • Civil Engineering
    • 700 & Above Employee
    • Engineering Technician
      • 1997 - 1998

Education

  • Lawrence Technological University
    Bachelor of Science, Architecture
    1993 - 1998
  • Brother Rice High School
    1989 - 1993

Community

You need to have a working account to view this content. Click here to join now