Mike Doonan
Senior Superintendent at Walbridge- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Storm Water Management Operator - Construction Site
Michigan Department of Environmental QualityFeb, 2018- Nov, 2024 -
Licensed Residential Builder
State of MichiganOct, 2003- Nov, 2024
Experience
-
Walbridge
-
United States
-
Construction
-
700 & Above Employee
-
Senior Superintendent
-
Feb 2008 - Present
- Lead Superintendent on projects ranging from $20 to $300 million dollars.- Use of Visual Planning to aid in overall scheduling and coordination of project- Conduct daily field huddles with foremen to review overall coordination- Maintain a safe and clean project site- Develop, Sequence and Maintain the overall Project Schedule - Direct contractor coordination meetings and field issue resolution.- Facilitate the Last Planner System daily and weekly work planning sessions- Promoted to Senior Superintendent in Dec 2018
-
-
-
CRB
-
United States
-
Construction
-
700 & Above Employee
-
Superintendent / Construction Manager
-
2006 - 2008
- Managed all Civil, Structural & Architectural aspects of project - Assisted with the Mechanical & Electrical field coordination- Created & maintained project schedules using Primavera SureTrakEmergent BioSolutions - AVA Expansion ProjectLansing, MichiganA fast track design / build project for a 63,000 square foot, ground up 3 story pharmaceutical vaccine manufacturing facility. It was complete with a 16,000 sq. ft. clean room process space. It was a $52 million guaranteed maximum price project.
-
-
-
Sorensen Gross
-
United States
-
Construction
-
1 - 100 Employee
-
Senior Supervisor
-
2005 - 2006
Managed a UAW Skilled Trades workforce of 25 menCoordinated construction work with plant production schedules & personnel.Worked with Plant Engineering & Process Engineers to resolve issuesGeneral Motors - Willow Run Powertrain Plant Ypsilanti, MichiganAn existing operating transmission assembly plant – approximately 4.5 million sq. ft. located on a 335-acre site. A contract position within the General Motors Worldwide Facilities Group’s plant construction department where we utilized the UAW Skilled Trades (Millwrights, Welders, Electricians, Pipe Fitters, Painters, & Tinsmiths, etc.) to complete GM’s capital projects – such as machine relocation, & installation, demo of old equipment, safety & ergonomic projects.
-
-
-
Clayco
-
United States
-
Construction
-
700 & Above Employee
-
Assistant Project Superintendent
-
2004 - 2004
Managed all interior construction (MEP & Arch.) aspects of the project. Worked with city officials to obtain building inspectionsMonitored work daily for conformance, quality and schedule Jordan’s Furniture - Taunton, MassachusettsNew Distribution Center & WarehouseA $57 million dollar project consisted of 810,000 sq. ft fast track design /build ground up facility complete with 158 loading docks; 38 foot clear height storage rack system and a 50,000 sq. ft office space complete with high end architectural details. This warehouse was constructed using cast on site Tilt-Up exterior concrete walls to help expedite the construction schedule
-
-
-
Turner Construction Company
-
United States
-
Construction
-
700 & Above Employee
-
Superintendent
-
1998 - 2003
Project Experience with Turner Construction Company: Pfizer Pharmaceuticals – Global Research & Development CampusConnector Tunnel Project - Ann Arbor, MIA $10 million dollar, 450-foot long, 9,000 sq. ft. combination personnel, material and utility connector tunnel that connected the main Pfizer campus across a public 4-lane road with the new R&D facility (see Pfizer project below).Pfizer Pharmaceuticals – Global Research & Development CampusTechnical Development Facility - Ann Arbor, MIA $170 million dollar, two building complex consisting of both Office/Laboratory space and Drug Development and Manufacturing space. This new building complex totaled 415,000 square feet in size as was joined by a Center atrium and a connector tunnel to the existing research campus located across the street.The New Stadium for the Detroit Tigers Baseball TeamComerica Park - Detroit, MIA $300 million dollar new stadium construction project located over six city blocks in downtown Detroit. This structure consisted of the seating bowl (42,000 seats & 108 luxury suites) and was encompassed by seven support “outbuildings”. General Motors Global Headquarters at the Renaissance Center Office Towers Renovation - Detroit, MIMulti-phase $120 million dollar, 1.7 million square feet renovation project that consists of complete demolition and then reconstruction of 104 office floors located within four different high-rise towers. This project was part of a $500 million dollar renovation of the whole complex.Henry Ford Wyandotte HospitalMajor Modernization Project - Wyandotte, MIA four-story $27 million dollar addition that comprised of a new emergency room, maternity ward, surgical suite (with ten new operating rooms), and an equipment sterilization area that serviced the whole hospital.
-
-
-
Professional Service Industries, Inc. (PSI)
-
United States
-
Civil Engineering
-
700 & Above Employee
-
Engineering Technician
-
1997 - 1998
-
-
Education
-
Lawrence Technological University
Bachelor of Science, Architecture -
Brother Rice High School