Mickaël Vernoux

Sub-foreman/ Windows and doors installer at Long Life Windows and Doors
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
CA
Languages
  • English Full professional proficiency
  • French Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Canada
    • Construction
    • 1 - 100 Employee
    • Sub-foreman/ Windows and doors installer
      • Mar 2021 - Present

    • Canada
    • Wholesale
    • 1 - 100 Employee
    • Windows and doors lead installer
      • Sep 2017 - Mar 2021

      Schedule/coordinate and communicate with clients, contractors and office Windows & doors installation on multi-million dollar construction projects Meet customer expectations while performing quality installations Working in teams to complete projects on-time and on-budget Methodogical storing & organizing finishing hardware & miscellanous parts in the warehouse Ability to drive 8 ton truck and responsible for loading and unloading trucks Schedule/coordinate and communicate with clients, contractors and office Windows & doors installation on multi-million dollar construction projects Meet customer expectations while performing quality installations Working in teams to complete projects on-time and on-budget Methodogical storing & organizing finishing hardware & miscellanous parts in the warehouse Ability to drive 8 ton truck and responsible for loading and unloading trucks

    • Canada
    • Wholesale
    • 1 - 100 Employee
    • Windows and doors installer
      • Sep 2015 - Oct 2016

    • Canada
    • Construction
    • 1 - 100 Employee
    • Roofer
      • Nov 2014 - Aug 2015

      • Roofing tear – off • Install slope package • Install vapor barrier, SBS base & cap sheet • Roofing tear – off • Install slope package • Install vapor barrier, SBS base & cap sheet

    • Canada
    • Construction
    • 1 - 100 Employee
    • Roofing crew leader
      • Aug 2013 - Nov 2014

      Supervised the work of up to 3 employees.Defined targets and objectives and communicated them to their work performance.Repaired, maintained, and removed roofs and the installed of new ones.Installed vapor barriers and layers of insulation.Inspected and determined materials requirements for roof repairs.Renovated or changed chimney flashings and repointed chimney.Cleaned and repaired or replaced gutters and down spouts

    • Roofer
      • Feb 2012 - Aug 2013

      Picked up and delivered materials.Found and replaced damaged joists and plywood.Scrape gravel or removed materials to locate leaks.Replaced broken tiles or shingles.Cut roofing paper to size and stapled or nailed to roof in overlapping strips to form base for roofing materials.Applied insulation board or other underlayment.

    • Roofer - Carpenter
      • 2009 - 2012

      Installed vapor barrier, insulation materials and screen under the roof Cut and installed rafters and laths,fascia boards Replaced tiles and roofing materials (tile, slate, zinc, copper) Installed skylights Repaired and renovated roofs using hand and power tools Assembled and dismantled scaffolding and safety systems Folded and soldered zinc or copper Evacuated rainwater (guttering, downspouts) Installed vapor barrier, insulation materials and screen under the roof Cut and installed rafters and laths,fascia boards Replaced tiles and roofing materials (tile, slate, zinc, copper) Installed skylights Repaired and renovated roofs using hand and power tools Assembled and dismantled scaffolding and safety systems Folded and soldered zinc or copper Evacuated rainwater (guttering, downspouts)

    • Mason
      • 2008 - 2009

      Cleaned and prepared work sites to prevent hazards Mix cement, sand and water to produce concrete, grout, or slurry. Adequately use hoes, trowels, tampers, scrappers and concrete mixing machines. Lay or installed brick, stone, tile or other related masonry material. Organized tools and kept them clean after the tasks are completed. Cleaned and prepared work sites to prevent hazards Mix cement, sand and water to produce concrete, grout, or slurry. Adequately use hoes, trowels, tampers, scrappers and concrete mixing machines. Lay or installed brick, stone, tile or other related masonry material. Organized tools and kept them clean after the tasks are completed.

Education

  • British Columbia Institute of Technology
    Construction operations, Building/Construction Site Management/Manager
    2023 - 2023
  • British Columbia Institute of Technology
    Red Seal, Carpentry/Carpenter
    2018 - 2023
  • A.F.P.A
    Diploma, Roofer
    2009 - 2011

Community

You need to have a working account to view this content. Click here to join now