MAX STREICHER S.p.A.
-
Italy
-
Oil and Gas
-
100 - 200 Employee
-
Chief Operating Officer
-
Jan 2023 - Present
-
-
-
MAX STREICHER GmbH & Co. KG aA
-
Germany
-
Oil and Gas
-
200 - 300 Employee
-
Overseas Operations Manager
-
Dec 2015 - Jan 2023
Project Manager Nawara Pipeline 370 km of 24"- OMV -Tunisia Project Director OPLI 36"- TAP- Italy Project Director Compression Stations TAG Eggendorf and Grafendorf- Austria Project Manager Nawara Pipeline 370 km of 24"- OMV -Tunisia Project Director OPLI 36"- TAP- Italy Project Director Compression Stations TAG Eggendorf and Grafendorf- Austria
-
-
-
Sicim
-
Italy
-
Oil and Gas
-
700 & Above Employee
-
Project Manager
-
Jun 2012 - Nov 2015
Zubair Oil Field Project (400 M USD) ENI Iraq BV- Basra- Iraq Sasabe-El Oro 830 km 36" Project - IENOVA/SEMPRA- Sonora- Mexico Los Ramones II - 220 km 42" Project- ICA/FLUOR -San Luis Potosi-Mexico Zubair Oil Field Project (400 M USD) ENI Iraq BV- Basra- Iraq Sasabe-El Oro 830 km 36" Project - IENOVA/SEMPRA- Sonora- Mexico Los Ramones II - 220 km 42" Project- ICA/FLUOR -San Luis Potosi-Mexico
-
-
-
Enereco S.p.A.
-
Italy
-
Industrial Machinery Manufacturing
-
200 - 300 Employee
-
“Direttore dei Lavori/Responsabile dei Lavori” in accordance with the Legislative Decree 81/08
-
Sep 2009 - Dec 2012
Snam Rete Gas S.p.A. Methane Pipeline “Caltignaga – Borgomanero DN 10” P = 75 bar, length 15 km (Year 2009 – 2010); Snam Rete Gas S.p.A. Methane Pipeline “Desana – Vercelli DN 16” P = 75 bar, length 12 km (Year 2009 – 2011); Snam Rete Gas S.p.A. HPRS 50 (High Pressure Reduction Station) BRA (Cuneo) P = 75 bar (Year 2011 – 2012); Snam Rete Gas S.p.A. HPRS 50 (High Pressure Reduction Station) Serravalle Sesia (Vercelli) P = 75 bar (Year 2011 – 2012); Snam Rete Gas S.p.A. Methane Pipeline “Mortara – Alessandria (HDD Po’)” DN 20” P = 75 bar (Year 2011 – 2012); Snam Rete Gas S.p.A. Methane Pipeline “Mornico al Serio – Chiari” DN 20” P = 75 bar (Year 2011 – 2012). Show less
-
-
-
Euroservice Impianti s.r.l
-
Oil and Gas
-
1 - 100 Employee
-
Technical Director-Projects Director
-
Jun 2003 - Jun 2012
1.Project “SONATRACH GK3”, Algeria. Year: 2012 Contractor: Saipem S.p.A. 2. Methane Pipeline “NEL Pipeline” DN 56” (1400 mm) – PN 100 bar – Lot 6, Lot 7, Germany - Mecklemburg - Years: 2011 – 2012 - Contractor: WINGAS GmbH & Co. KG - Client: Bonatti S.p.A. 3. Execution of Piping prefabrication and Installation Works related to BERNEAU Natural Gas Compression Station – Belgium Year: 2010 – 2011 - 2012 Contractor: Fluxys Client: RENCO S.p.A. 4. Construction of the Methane Pipeline Cremona - Sergnano (DN 48”) P = 75 BAR, length 49 km (JV Max Streicher S.p.A. – Euroservice Impianti S.r.l.) Year: 2010 - 2012 Contractor: Snam Rete Gas S.p.A. 5. Execution of Piping prefabrication and Installation Works related to WEELDE Natural Gas Compression Station – Belgium (pipes and pipelines equal and greater than 12”). Year: 2009 - Contractor: Fluxys - Client: RENCO S.p.A. 6. Civil works concerning the realization of the Methane Pipeline Tarvisio – Malborghetto DN 48”, P = 75 bar, L = about 19.750 m. - Year: 2008 - 2009 - Contractor: Snam Rete Gas S.p.A. - Client: Nacap BV 7. Execution of Piping prefabrication and Installation Works related to the new ZELZATE Natural Gas Compression Station – Belgium (pipes and pipelines equal and greater than 12”). - Year: 2007 - 2008 - Contractor: Fluxis - Client: RENCO S.p.A. Show less
-
-
Education
-
Politecnico di Bari
Ingegneria civile