Michal Szczesny

Vice President at CSI Europe
  • Claim this Profile
Contact Information
Location
Warsaw, Mazowieckie, Poland, PL

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Poland
    • Construction
    • 1 - 100 Employee
    • Vice President
      • Apr 2023 - Present

    • Europe Mechanical Operations Manager
      • Feb 2022 - Present

    • Mechanical Department Manager
      • Jun 2020 - Apr 2023
    • Civil Engineering
    • 1 - 100 Employee
    • Mechanical Works Coordinator
      • Jan 2014 - Jun 2020

      Main responsibilities:- Contact with the Client regarding design and execution of mechanical installations (HVAC, Plumbing, Fire protection) and vertical transport equipment (escalators and elevators) including agreeing technical solutions- Provide compliance of the design with the Contract documents, national regulations, laws and codes- Verify and approve design solutions, including feasibility phase- Optimize the design solution- Manage and multidisciplinary coordination of design of mechanical installations and vertical transport equipment with other disciplines- Suppliers selection- Tendering and selection of subcontractors for mechanical works and vertical transport equipment- Collaborate with Contract department within preparation of Subcontracts in terms of technical input, including schedule, transport methodology, method statements, interface matrix etc.- Procurement of major mechanical equipment, including escalators and elevators - Manage mechanical subcontractors in three out of seven Metro stations- Hand over stations systems to the Contractor and authorities (PIS, PSP, WINB) Show less

    • Stations Mechanical Installations Supervisor
      • Sep 2011 - Jan 2014

    • Mechanical Installations Engineer
      • Apr 2011 - Sep 2011

    • Site engineer Civil installations/HVAC at CMI Medical Centre Gdansk
      • Aug 2008 - Dec 2010

      -Supervision over groups of workers assembling ventilation, heating and cooling, plumbing, gas installations. -On-site coordination -Preparation of material lists -Preparation of progress reports -Supervision over groups of workers assembling ventilation, heating and cooling, plumbing, gas installations. -On-site coordination -Preparation of material lists -Preparation of progress reports

    • Project engineer
      • Jan 2008 - Jun 2008

      -Preparation of as built documentation of heating and cooling installation of North Gate office buliding (100m), Warsaw Poland -Preparation of as built documentation of heating and cooling installation of North Gate office buliding (100m), Warsaw Poland

    • Sweden
    • Construction
    • 700 & Above Employee
    • Site engineer
      • Jul 2006 - Aug 2006

      -Students apprentice at M&E section at "Złote Tarasy Projekt", Warsaw Poland -Students apprentice at M&E section at "Złote Tarasy Projekt", Warsaw Poland

Education

  • Warsaw School of Economics
    Project Management Postgraduate Studies
    2011 - 2012
  • Polish Chamber of Civil Engineers
    Member
    2010 - 2010
  • Warsaw University of Technology
    MEng, Environmental engineering
    2003 - 2009

Community

You need to have a working account to view this content. Click here to join now