Michal Szczesny
Vice President at CSI Europe- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
CSI Europe
-
Poland
-
Construction
-
1 - 100 Employee
-
Vice President
-
Apr 2023 - Present
-
-
Europe Mechanical Operations Manager
-
Feb 2022 - Present
-
-
-
-
Mechanical Department Manager
-
Jun 2020 - Apr 2023
-
-
-
AGP Metro Polska
-
Civil Engineering
-
1 - 100 Employee
-
Mechanical Works Coordinator
-
Jan 2014 - Jun 2020
Main responsibilities:- Contact with the Client regarding design and execution of mechanical installations (HVAC, Plumbing, Fire protection) and vertical transport equipment (escalators and elevators) including agreeing technical solutions- Provide compliance of the design with the Contract documents, national regulations, laws and codes- Verify and approve design solutions, including feasibility phase- Optimize the design solution- Manage and multidisciplinary coordination of design of mechanical installations and vertical transport equipment with other disciplines- Suppliers selection- Tendering and selection of subcontractors for mechanical works and vertical transport equipment- Collaborate with Contract department within preparation of Subcontracts in terms of technical input, including schedule, transport methodology, method statements, interface matrix etc.- Procurement of major mechanical equipment, including escalators and elevators - Manage mechanical subcontractors in three out of seven Metro stations- Hand over stations systems to the Contractor and authorities (PIS, PSP, WINB) Show less
-
-
Stations Mechanical Installations Supervisor
-
Sep 2011 - Jan 2014
-
-
Mechanical Installations Engineer
-
Apr 2011 - Sep 2011
-
-
-
-
Site engineer Civil installations/HVAC at CMI Medical Centre Gdansk
-
Aug 2008 - Dec 2010
-Supervision over groups of workers assembling ventilation, heating and cooling, plumbing, gas installations. -On-site coordination -Preparation of material lists -Preparation of progress reports -Supervision over groups of workers assembling ventilation, heating and cooling, plumbing, gas installations. -On-site coordination -Preparation of material lists -Preparation of progress reports
-
-
-
-
Project engineer
-
Jan 2008 - Jun 2008
-Preparation of as built documentation of heating and cooling installation of North Gate office buliding (100m), Warsaw Poland -Preparation of as built documentation of heating and cooling installation of North Gate office buliding (100m), Warsaw Poland
-
-
-
Skanska
-
Sweden
-
Construction
-
700 & Above Employee
-
Site engineer
-
Jul 2006 - Aug 2006
-Students apprentice at M&E section at "Złote Tarasy Projekt", Warsaw Poland -Students apprentice at M&E section at "Złote Tarasy Projekt", Warsaw Poland
-
-
Education
-
Warsaw School of Economics
Project Management Postgraduate Studies -
Polish Chamber of Civil Engineers
Member -
Warsaw University of Technology
MEng, Environmental engineering