Michael Pritchard

Construction Manager at Shadforths Civil Engineering Contractors
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Brisbane Area, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Warren Crowther

Michael is a very capable engineer and was a hard working and valuable member of the CoalConnect team.

David Nixon

I have worked closely with Michael on several proposals & projects and more recently when he moved into the Project Supervisor role. Michael is a dedicated, hard working young engineer who is easy to work with and delivers at or above expectation every time. Michael’s work ethic and performance is above his years and I expect he will continue to be an above average performer for the remainder of his career. It would be my pleasure to work with Michael again in the future and or recommend him for any role.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Construction
    • 200 - 300 Employee
    • Construction Manager
      • Aug 2018 - Present

    • Project Manager
      • 2013 - Aug 2018

      Manage multiple projects including subdivisions, roadworks, trunk infrastructure. Projects include:Rochedale Estates stages 1D1, 1D2, 1D2A, 2A, 2B, 2C, 3A, 3B, 3B terraces, 3C, 3C terraces, 5A, 5B100 Prebble StreetGardner Road ReconstructionGardner Road Widening and intersectionFord Road ConstructionRochedale Road Trunk water mainRipley Road UpgradeMontego Hills External RoadMontego Hills Stage 2A/ 2B / 3 / 4Harvest Rise (Greenbank) External RoadHarvest Rise External Trunk SewerHarvest Rise Stage 1 / 2 / 3 / 4 / 4APark Ridge Stage 1 / 2 / 3 and Trunk SewerChambers Ridge Stages 1 and 2Hydeberry Estate - Rochedale - Stages 1 and 2The Views at Holmview

    • Australia
    • Construction
    • 700 & Above Employee
    • Site / Project Engineer
      • Feb 2012 - Feb 2013

      I was employed as the concrete site/ project engineer for the project. In this role I was tasked with subcontractor and supplier management, procurement, quality control, scheduling, site inspections, safety, and cost control/ forecasting. With the site foremen, I managed slab pours, footing pours, installation of bored piles and shotcrete. The pours generally ranged from 5m³ to 570m³ of 40MPa concrete and occurred daily. The pours were conducted in both Greenfield and Brownfield areas with 28 piles installed inside the coal terminal which was heavily populated with live underground services.

    • United States
    • IT Services and IT Consulting
    • 700 & Above Employee
    • Project Supervisor
      • Oct 2011 - Feb 2012

      I was responsible for the oversight of numerous multi-discipline design projects in the role of Project Supervisor. This role requires me to ensure that the project deadlines and deliverables are met, ensuring client satisfaction as well as managing KBR’s safety and costs. The projects under my watch range from flood modelling and hydrology to environmental projects. I was responsible for the oversight of numerous multi-discipline design projects in the role of Project Supervisor. This role requires me to ensure that the project deadlines and deliverables are met, ensuring client satisfaction as well as managing KBR’s safety and costs. The projects under my watch range from flood modelling and hydrology to environmental projects.

    • Civil Engineering
    • 1 - 100 Employee
    • Site Engineer
      • Apr 2010 - Aug 2011

      I was seconded to the Leighton Contactors construction team as an Earthworks Site Engineer. In this role I was comprehensively involved in the delivery of 40km of the rail alignment and 2km of DTMR road. From clearing and grubbing through to handover, I gained experience on all aspects of rail and road embankment civil construction as well as project engineering. Responsibilities in this role involved managing daily on-site construction activities with the general foreman, monitoring and controlling safety in line with Leighton Safety Essentials, as well as controlling quality, program and costs associated with my area of construction works. I was also responsible for subcontractor management from procurement and scoping of works to delivery and demobilisation. Project engineering duties I was frequently tasked with include end of month forecasting and reporting to the area manager, procurement as well as training new site engineers who joined the project. I was often also involved in trouble-shooting sessions with the client and senior managers over issues associated with the project including QR’s quarry management and naturally sourced material deficiencies. Through this secondment I gained multiple skills associated with civil contracting and built strong relationships which were recognised by the Alliance Manager.

    • Manager
      • 2002 - 2008

Education

  • Griffith University
    Masters, Business Administration and Management, General
    2018 - 2020
  • Griffith University
    Bachelor of Engineering, Construction
    2004 - 2009
  • Palm Beach Currumbin State High School
    1998 - 2004

Community

You need to have a working account to view this content. Click here to join now