Michael Namje Kim, P.Eng

Electrical Engineer at Advanced Cyclotron Systems Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
CA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Medical Device
    • 1 - 100 Employee
    • Electrical Engineer
      • Aug 2022 - Present

      • Design, upgrade, modify and document new and existing cyclotron systems including HV and LV electrical systems such as main magnet power supply(60Vdc, 600A), ion source high voltage(30kV, 10kV, 5kV), diverse DC power supplies • Supervise manufacturing and assembly of system components • Performing repair and complex troubleshooting of cyclotrons • Identify applicable standard and collateral standards for the different cyclotron sites • Review current cyclotron systems designs for standards compliance • Work within the engineering team to recommend/lead any design changes required to ensure standards compliance • Work with the third-party test lab to ensure device certification • Conduct/facilitate risk analysis activities as required • Prepare and/or revise existing technical documentation to meet regulatory requirements

    • Canada
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Electrical Engineer
      • Aug 2021 - Jul 2022

      • Developing 208Vac to 600Vac electrical panel and plant design, as well as 24 VDC control panel design. • Generating electrical and control system design drawings and other documentation including single line diagrams, electrical schematics, panel layouts, load calculations, cable schedules and other related documentation. • Specify, size and select electrical components for use in electrical design including power distribution panels • Project manage assigned electrical engineering scope for water treatment projects of varying sizes • Work with Mechanical Engineering team to ensure fit and integration of electrical components • Support our on-site production team with the installation and testing of panels and equipment • Hands-on commissioning and troubleshooting of electrical systems • Occasional travel to plant installations in customer-facing environments for start-up and commissioning

    • Canada
    • Paper and Forest Product Manufacturing
    • 100 - 200 Employee
    • Electrical Engineer
      • Apr 2021 - Jul 2021

      • Design, design modification in electrical circuits and integrated projects using AutoCAD • Maintenance planning on power distribution system and troubleshooting • Provide high quality, low cost and timely industrial electrical services to design new or repair existing facilities for the site to minimize required investment and provide, reliable, efficient and low operating cost solutions while meeting quality, health and safety and environmental standards • Assist in troubleshooting with the operating departments in terms of electrical system issues • Provide high quality and timely technical assistance for the commissioning and start-up of new facilities and initiate timely and proper corrective action as required to meet the project objectives • Assist process engineers as well as the electrical trades to help improve mill processes through implementation of advanced control and optimization of current practices • Prepare engineering packages with BOM and assist for planning, spares management

    • Canada
    • Oil and Gas
    • 1 - 100 Employee
    • Project Engineer
      • Jan 2019 - Mar 2021

      Suncor Business Unit Project at Base Plant ; Mine Wireless Data Network Project, Mine 2-Way Radio Improvement Project, Long term solution of Diesel Exhaust Fluid Project • Work as an owner project engineer for the Suncor base plant business unit project • Execute day to day activities in alignment with Suncor 4.0 values and objectives • Support an integrated effort in the development, and execution of projects per asset development execution model (ADEM) guidelines • Engage partners, contractors, and multi-functional teams to ensure a clear scope for all standards, scheduling, job specifications packages, and deliverables • Act proactively to mitigate potential risks and gather data from previous projects to identify and avoid historical errors • Manage project variables, including safety, scope, cost, quality, schedule in active consultation with the project lead • Provide technical support to construction management team and coordinators by visiting Fort Hills site during key construction periods • Help develop timely and accurate cost estimates, schedule baselines, staffing plans, and risk identification support for assigned scopes

    • Commissioning Electrical Lead, KNPC(Kuwait National Petroleum Co.) MAB-2 CFP Refinery Project
      • Jan 2017 - Dec 2018

       Develop system/subsystem electrical markup drawing and assign electrical tag to subsystem for MCPlus(Fluor Mechanical Completion System)  Coordinate final walk-down with construction/client and punch list management  Review substation energization procedure and coordinate Site Acceptance Test of HSWG(High Voltage Switch Gear), LSWG(Low Voltage Switch Gear), UPS, MCC, Generator  Coordinate with permit office complying LOTO(LockOut TagOut) procedure and approve LOTO request and LOTO clearance request as an primary authorized employee  Review, approve and turnover package SMCB(System Mechanical Completion Book), PTOCB(Provisional Turn Over Completion Book ), FPRB(Final Project Record Book)

  • Sunlake Co. Ltd
    • Fort McMurray, AB
    • Electrical Coordinator, Suncor Fort Hills Secondary Extraction Mining Oil Sand Project
      • Apr 2015 - Aug 2016

       Plan and schedule, estimate time and material, coordinate biz-partners, maintain records and files and prepare reports  Review electrical engineering drawings and refer issues requiring changes  Schedule, assign, plan and coordinate electrical scope of work on different electrical work package to different biz-partners  Coordinate with the biz-partners to achieve the target and schedule set by the planning  Review construction progress, L4 schedule and green sheet report with material readiness  Attend daily permit coordination meeting and review / sign-off the work permits ensuring EH&S requirements as an Area Authority and liaised with other disciplines for safe work  Coordinate with permit office complying LOTO(LockOut TagOut) procedure and approve LOTO request and LOTO clearance request as an electrical area authority  Coordinate 5kV/600V temporary power system construction/commissioning/operation and field walk-down for 600V initial energization

    • Electrical Superintendent, Harvest Energy BlackGold SAGD Oil Sand Project
      • Apr 2013 - Mar 2015

       Prepare and issue CWP(Construction Work Package) including engineering documents for 4.16kV SWGR, MCC, ASD / 600V MCC, Distribution Panel, UPS, Transformer / Cable Tray etc.  Review, coordinate and answer RFI(Request for Information), MAR(Material Approval Request)  Prepare input of L3/L4 construction schedule between subcontractors and related disciplines  Check, evaluate and report weekly, monthly construction progress  Keep and track change order, SI(Site Instruction) and engineering documents history  Perform 600V MCC site modification with field engineer and vendor(Eaton)  Coordinate E-House energization with Fortis Alberta ensuring safe energization procedure and approve/supervise LOTO procedure  Lead SAT and Integrated SAT of E-House, Telecom system, UPS, Generator and mechanical package (GE water treatment, Rentech Boiler)  Review electrical construction completion turn-over package and sign-off the TCCC (Transfer of Care, Custody and Control)  Liaise with C&SU to support pre-commissioning and commissioning activities

    • Electrical Engineer, 2nd Major Plant Expansion Project
      • Jan 2010 - Apr 2012

      - Performed feasibility study for electrical area of manufacturing system, water treatment facilities and power distribution.- Reviewed and marked up load list, single line diagram, substation, control room layout, cable schedules, control philosophy, system architecture drawing, P&ID.- Prepared SOW(Scope Of Work), vendor list, RFQ/RFP, bid evaluation.- Reviewed vendor documents including control schematics, control logic diagrams, control loop diagram, control narratives and wiring diagrams.- Coordinated major package vendor schedule - glasstech(USA), AGC(Japan), Cugher(Italy), Bystronic(Switzerland), Benteler(Germany).- Organized Factory Acceptance Test(FAT), Site Acceptance Test(SAT) and coordinated training/turn-over for operating team.

    • Maintenance Engineer, 24-hour-Operating Plant (243 PLCs, 64 Robots, 3306 motors and substation)
      • Jan 2007 - Dec 2009

      - Planned and performed preventive maintenance activities for transformers, GIS(Gas Insulated Switchgear), SCADA, MCCs, PLCs, HMI, robots, motors.- Minimized unscheduled downtime and maintained high yield rate using strong knowlege of PLC logic diagram.- Supervised troubleshooting with strong analysis in Rockwell ControlLogix, PLC5, SLC500 and Mitsubishi A-PLC, Q-PLC.- Designed Vibration Monitoring System with RSView, RSMACC and Odyssey CBM System.

    • Electrical Engineer, New Manufacturing System Project
      • Jan 2005 - Dec 2006

      - Designed power distribution, control room, PLC/Servo cabinets and network diagram.- Specified and coordinated with suppliers of packaged systems; VFD(ABB, TMEC), UPS(GE).- Executed Factory Acceptance Test(FAT), Site Acceptance Test(SAT) and prepared training/turn-over for operating team.

    • Controls Engineer, MES(Manufacturing Executive System) Project
      • Jan 2003 - Dec 2004

      - Developed MES using RSsql/MSsql, RSlinx OPC server and Takebishi OPC server.- Collected and processed field data from PLC network(Rockwell/Mitsubish).- Prepared BOM(Bill Of Material) for FMS(Facility Management System), a part of MES.

    • Electrical Engineer, New Automotive Glass Manufacturing Plant Project
      • Jan 2001 - Dec 2002

      - Designed 6 manufacturing systems including LVSBs(Low Voltage Switch Board), MCCs, PLC cabinets and coordinated package systems(CNCs, robots, UV/IR dryers) - Wrote RFQ/RFP, reviewed and approved vendor's drawings, checked and reported construction progress. - Relocated existed 10 manufacturing systems from old plant and upgraed control systems(Rockwell PLC-2 to PLC-5) - Executed Factory Acceptance Test(FAT), Site Acceptance Test(SAT) and prepared training/turn-over for operating team - Designed 6 manufacturing systems including LVSBs(Low Voltage Switch Board), MCCs, PLC cabinets and coordinated package systems(CNCs, robots, UV/IR dryers) - Wrote RFQ/RFP, reviewed and approved vendor's drawings, checked and reported construction progress. - Relocated existed 10 manufacturing systems from old plant and upgraed control systems(Rockwell PLC-2 to PLC-5) - Executed Factory Acceptance Test(FAT), Site Acceptance Test(SAT) and prepared training/turn-over for operating team

    • Chemical Manufacturing
    • 700 & Above Employee
    • Electrical Engineer
      • Jan 1999 - Dec 2000

      - Calculated and analyzed electrical power consumption; 135,564Mwh and $7.1M/year - Planned and performed preventive maintenance activities for 154kV/22.9kV main substation, 22.9kV/440V local substations. - Calculated and analyzed electrical power consumption; 135,564Mwh and $7.1M/year - Planned and performed preventive maintenance activities for 154kV/22.9kV main substation, 22.9kV/440V local substations.

Education

  • Dankook University
    Bachelor of Applied Science (B.A.Sc.), Electrical Engineering
    1991 - 1998

Community

You need to have a working account to view this content. Click here to join now