Michael Alvarez
Director of Project Management at Legacy Platform, LLC- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
Topline Score
Bio
Credentials
-
A Leader's Thoughts on Strategy
360trainingAug, 2022- Nov, 2024 -
Accelerate Goal Achievement
360trainingAug, 2022- Nov, 2024 -
Accelerate the Acceptance of Organization Change
360trainingAug, 2022- Nov, 2024 -
Acting with Appropriate Speed to Problems
360trainingAug, 2022- Nov, 2024 -
Align Resources to Strategic Priorities
360trainingAug, 2022- Nov, 2024 -
An Ethics and Integrity Discussion
360trainingAug, 2022- Nov, 2024 -
OSHA 10 Hour Construction Industry
360trainingAug, 2022- Nov, 2024 -
OSHA 10 Hour General Industry
360trainingAug, 2022- Nov, 2024 -
Internal Audit for ISO- Based Systems 14 Hours
MRA - The Management AssociationSep, 2019- Nov, 2024 -
Project Managment Fundementals
MiTek IncAug, 2019- Nov, 2024 -
FEMA ICS-100 Incident Command System
FEMASep, 2016- Nov, 2024 -
IS-700.a National Incident Management System (NIMS)
FEMASep, 2016- Nov, 2024
Experience
-
Legacy Platform, LLC
-
United States
-
Transportation, Logistics and Storage
-
1 - 100 Employee
-
Director of Project Management
-
Nov 2022 - Present
-Continual growth and development of project management team-Manage production between project management and engineering -Quality Control and Continuous Improvement -Research, development and implementation for business necessities-Operations generalist -Validate “ready-for-engineering” documents to provide details for engineering-Coordinate communication and document changes-Collaborate with teams to solve customer/installation questions and problems
-
-
Operations Manager
-
Aug 2022 - Nov 2022
-Manage production between project management and engineering -Quality Control and Continuous Improvement -Research, development and implementation for business necessities-Operations generalist -Validate “ready-for-engineering” documents to provide details for engineering-Coordinate communication and document changes-Collaborate with teams to solve customer/installation questions and problems
-
-
-
MiTek Mezzanine Systems
-
United States
-
Wholesale Building Materials
-
1 - 100 Employee
-
Integrator Project Coordinator
-
May 2019 - Aug 2021
-Enter orders in business management software and communicate project information and customer requirements to internal stakeholders. Validate data entered for assigned projects. -Validate “design-ready” documents to provide additional feedback for the engineering group. -Validate customer notes on the approval drawing. -Coordinate communication and document changes. -Collaborate with others to solve customer/installation problems. Defining problems, gathering information, root cause analysis, developing corrective actions, and win-win scenarios. -Communicate lead times, approval documents, permit documents, install documents, and estimated ship dates to the appropriate integrator personnel. -Create and enter parts orders when necessary. -Create “production-ready” sketches and BOM’s as needed. Send out CDI stock parts, as needed. -Visit integrator/install sites. -Collaborate with Regional Manager and other Project Managers to solve integrator problems. -Manage any assigned internal improvement projects with oversight from the quality manager.
-
-
-
Pointe Precision, Inc.
-
United States
-
Aviation & Aerospace
-
1 - 100 Employee
-
Continuous Improvement Engineering Intern
-
Dec 2018 - Apr 2019
-Examine manufacturing or assembly processes and make suggestions that will improve product output -Kanban Systems -Quality Control -PPAP Prep work (creating and maintaining FAI, Control Plans & PFMEAs) -Creating and Maintaining Frequency Guides -Creating and Maintaining Gage R&Rs -Continuous Improvement Projects as needed -CAPA training -SPC Techniques and Protocol -Management of Q101 Operations -Other continuous improvement projects
-
-
-
Pointe Precision, Inc.
-
United States
-
Aviation & Aerospace
-
1 - 100 Employee
-
Quality/Continuous Improvment Engineering Co-op
-
Jan 2018 - Aug 2018
-PPAP Prep work (creating and maintaining FAI, Control Plans & PFMEAs) -Creating and Maintaining Frequency Guides -Creating and Maintaining Gage R&Rs -Continuous Improvement Projects as needed -CAPA training -SPC Techniques and Protocol -Management of Q101 Operations -Other continuous improvement projects -PPAP Prep work (creating and maintaining FAI, Control Plans & PFMEAs) -Creating and Maintaining Frequency Guides -Creating and Maintaining Gage R&Rs -Continuous Improvement Projects as needed -CAPA training -SPC Techniques and Protocol -Management of Q101 Operations -Other continuous improvement projects
-
-
-
Sherwin-Williams
-
United States
-
Chemical Manufacturing
-
700 & Above Employee
-
Sales Associate
-
Apr 2016 - Dec 2017
-Key Holder -Customer service -Point of sale and transaction experience -Chemical transport -Store maintenance -Disposal of hazardous waste -Time management skills -Power industrial truck training -Key Holder -Customer service -Point of sale and transaction experience -Chemical transport -Store maintenance -Disposal of hazardous waste -Time management skills -Power industrial truck training
-
-
-
PPG
-
United States
-
Paint, Coating, and Adhesive Manufacturing
-
700 & Above Employee
-
Processor
-
Jun 2015 - Aug 2015
Large scale production of industrial coating Power Industrial truck training, experience, and certification Hazmat Employee Consistency skills Hazardous material maintenance PPE knowledge and experience Large scale production of industrial coating Power Industrial truck training, experience, and certification Hazmat Employee Consistency skills Hazardous material maintenance PPE knowledge and experience
-
-
Education
-
University of Wisconsin-Platteville
Bachelor of Science - BS, Industrial Technology Managment/ Product development and Drafting -
Oak Creek High School
General Education