Michael Chandra

Test & Commissioning (Cx) Engineer (Microsoft Data Centre Project) at PT Jaya Obayashi
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Bandung, West Java, Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • AutoCAD MEP Essential Training
    LinkedIn
    Jan, 2021
    - Nov, 2024
  • AutoCAD: Creating Sprinkler and Fire-Alarm Systems
    LinkedIn
    Jan, 2021
    - Nov, 2024
  • Construction Management: Reading Drawings & Specifications
    LinkedIn
    Jan, 2021
    - Nov, 2024
  • Electrical Systems: Reading Drawings and Schematics
    LinkedIn
    Jan, 2021
    - Nov, 2024

Experience

    • Indonesia
    • Construction
    • 100 - 200 Employee
    • Test & Commissioning (Cx) Engineer (Microsoft Data Centre Project)
      • Mar 2023 - Present

      Test & Commissioning (Cx) Engineer has monitoring approach on the following process:1. Procurement and Positioninga. Carrying out of weekly equipment delivery meetings with all vendorsb. Tracking of procurement activities thru Equipment Log (Original, Forecasted, Actual)o Equipment required on job (ROJ) dateso Submittals (technical catalogues, shop drawings)o Fabrication Progresso FAT (Cx Level 1) and Red Tag - Test scripts and Testing Scheduleo Authorization to shipo Delivered to Siteo Checking Material Complianceo Positioning Equipment for Red Tagc. Updating the FAT (Cx Level 1), Delivery status and Red Tagging in COMPASS.2. Installation and Terminationa. Carrying out of daily/weekly installation/coordination meetings with vendorsb. Tracking of installation activities thru M&E Installation Check Listo Equipment Yellow Tagging dateso Installation Check List Submittals (Check List, Shop Drawing)o Installation/Termination Progresso Installation/Termination (Cx Level 2) and Yellow Tag - Test scripts and Testing Scheduleo Authorization to Turn Onc. Updating the Cx Level 2 and Yellow Tag status in COMPASS.3. Power Turn On and Start Up Testinga. Carrying out of weekly Power Requirement/Turn On meetings with vendorsb. Tracking of Power Turn On/Start Up Testing activities thru Cx Level 3 Check Listo Equipment Green Tagging dateso Turn On/Testing Check List Submittals (Check List, Shop Drawing)o Turn On/Testing Progresso Turn On/Testing (Cx Level 3) and Green Tag - Test scripts and Testing Scheduleo Authorization to go for Cx Level 4 Functional Testc. Updating the Cx Level 3 Test Script and Green Tag status in COMPASS Show less

    • MEP QA/QC Engineer (Microsoft Data Centre Project)
      • Apr 2022 - Present

      MEP QA/QC Engineer has responsible to verify all QA/QC work for MEP equipment and coordination to structural and architectural division. There are few key points to handle by the QA/QC Engineer. 1. Material Inspection (Handling and receiving) - Do inspection of delivery for equipment and material at site project to indicate and comply with material approval sheet and supporting documents. - Do preparation and invitation for inspection. - Do documentation for inspection (Inspection board, photograph and sign must be intended, and document shall be keeping in good arrangement.) 2. Construction Inspection - Inspection with witness shall be held for critical & important item which have rule, value and target point to achieve. - Inspection item is complied with specification and schedule to construction condition and coordination with related site work is necessary to arranged. - Invitation for inspection must be confirmed by construction site supervisor and will invite client to joint inspection. Before, all item inspection must be scheduled and pointed out at weekly and monthly construction schedule's. - Inspection session shall be reported with photograph proof, checklist, and sign in the inspection document. - Inspection shall be complied and refer to ITP which pointed in the MOS document. 3. Punch List Inspection - Inspection is about to determine for Construction Quality, Safety, and progress - Inspection is competed with photograph with "Before" and "After" condition and competed with description of problem and solving related to captured photograph - Inspection form is following and comply with Jaya Obayashi standard form Show less

    • MEP Field Supervisor
      • May 2021 - Present

    • Mechanical Engineer
      • Nov 2020 - Present

    • Indonesia
    • Higher Education
    • 700 & Above Employee
    • Coordinator of Basic Mechatronics Lab Work
      • Jan 2020 - Apr 2020

      MS3202 Basics of Mechatronics Subject Course MS3202 Basics of Mechatronics Subject Course

    • Indonesia
    • Maritime Transportation
    • 500 - 600 Employee
    • Mechanical Engineer
      • Jul 2019 - Aug 2019

      At Department of Mechanical and Electrical Engineering in Main Office of Indonesia Port Corporation At Department of Mechanical and Electrical Engineering in Main Office of Indonesia Port Corporation

Education

  • Institut Teknologi Bandung
    Bachelor of Engineering - BE, Mechanical Engineering
    2016 - 2020
  • Saint Joseph College Senior High School
    IPA
    2013 - 2016

Community

You need to have a working account to view this content. Click here to join now