Michael Brend CEng MIMechE

Director at Sirona Subsea
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Carl Jones

Michael is a competent and professional engineer with a friendly personality.

Matthew Shaw

I have known Mike now for several years, he is a highly experienced Engineer will extensive Knowledge of several CAD packages. Mike is hard working, a great team player and a asset to any team.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Engineering Services
    • 1 - 100 Employee
    • Director
      • Dec 2022 - Present

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Head of Projects
      • Apr 2021 - Dec 2022

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Project Manager
      • Feb 2015 - Apr 2021

      Marine Growth Removal Tool & Dynamic Bend Stiffeners - London ArrayProject manage the supply of bespoke solutions for London Array's wind-farm in the Southern North Sea. Phase 1 consisting of multiple proof of concepts with subsequent operational install & phase 2 consisting of higher-volume installation.Emergency Pipeline Repair Clamp - Subsea 7/CNOOCProject manage the supply of Pipeline Repair Clamp for the Telford Pipeline, U.K. North Sea. Emergency Pipeline Repair Clamps - Subsea 7/NexenProject manage the supply of Pipeline Repair Clamps for the Scott Field, U.K. North Sea. J-Tube Re-Installation Clamps - Tekmar/Iberdrola O&MDesign & Project manage the supply of Cable Re-installation Clamps. Riser Hang-Off & Sealing System - Aker SolutionsDesign & Project manage the supply of a Riser Hang-Off & Sealing System, for a tie-in between Utgard & Sleipner platforms. EPRS Project - Subsea 7/Chevron/INPEXProject manage the supply of 20, 30, 34, 42 & 44" Pipeline Repair Clamps for the Wheatstone, Gorgon, Jansz & Ichtys fields - off the Western coast of Australia. Martin Linge Project - ABB/TotalProject manage the supply of ROV Installed J-Tube Seal for FSO Cable. EPRS Project - RasGasDesign and project manage the supply of 16, 28, 32 & 38" Pipeline Repair Clamps & 16" Pipeline Connectors for wet sour gas pipelines. Mariner Fibre-Optic Cable Project - TampnetDesign and project manage the supply of Passive J-Tube Seal for a fibre-optic cable for the Mariner platform. NC3CP / E11R-C Fibre-Optic Cable Project - iFactors / PetronasDesign and project manage the supply of Dual and Single cable Passive J-Tube Seals.

    • Lead Project Engineer
      • Sep 2014 - Feb 2015

      EPRS Project - RasGasDesign and project managed the supply of 18, 28, 32 & 38" Pipeline Repair Clamps & 16" Pipeline Connectors for wet sour gas pipelines. Mariner Fibre-Optic Cable Project - TampnetDesign and project managed the supply of Passive J-Tube Seal for a fibre-optic cable for the Mariner platform. NC3CP / E11R-C Fibre-Optic Cable Project - iFactors / PetronasDesign and project managed the supply of Dual and Single cable Passive J-Tube Seals.

    • Project Engineer
      • Mar 2012 - Sep 2014

      Some projects include:LOGGER Platform - WintershallDesigned and project managed the supply of an 8"ns pipeline connector spool for a damaged section of line. Tordis flow line replacement project - Subsea 7Designed and project managed the supply of an ROV installed J-Tube seal for Gulfaks.Brynhild pipe-in-pipe waterstops - Technip/LundinDesigned and project managed the supply of 40-off pipe-in-pipe waterstop seals for a super duplex pipeline.Leighton III Project - Parker ScanropeDesigned and project managed the supply of passive J-Tube seals for umbilical.Valemon Project - Parker Scanrope / Statoil Designed, project managed and installed the supply of ROV installed J-Tube seals, for the Power cable between Kvitebjørn and Valemon platforms. BP Thunderhorse project - BP / TechnipDesigned, project managed and installed a 65Te hold back clamp, for a PLET end-fitting replacement, at a depth of 1850m.Caragali Sdn. Bhd. Project - Petronas /iFACTORSDesigned and project managed the supply of Passive J-Tube Seal for fibre-optic cable for the ANGSI Development Project.Lianzi Development Project - Nexans / Subsea 7 / ChevronDesigned and project managed the supply of Passive J-Tube Seal for power cable, for the Lianzi Development Project.Oseberg Delta S2 Project - Nexans Designed and project managed the supply of an ROV installed J-Tube seal. Shell F29 Project - NexansDesigned and project managed the supply of Passive J-Tube Seals. Cygnus Alpha - GDF SuezDesign and project managed the supply of 24" Pipeline Repair Clamps & Pipeline Connectors.Noble Gunflint Project - EMASDesign and project managed the supply of pipe-in-pipe waterstop seals, subjected to reeling-trials at radii of 8m and 58m at 121•c and 245 Bar. EPRS Project - RasGasDesign and project managed the supply of 16, 28, 32 & 38" Pipeline Repair Clamps & 16" Pipeline Connectors, for wet sour gas pipelines.

    • Design Engineer
      • Nov 2010 - Mar 2012

      Design Engineer.Projects as Design Engineer include:-Multi-purpose handling system for Technip. The project involved the design and manufacture of a vessel moon pool structure, for the Fugro Symphony Vessel, incorporating a number of client specified features. (Technip)Pipeline repair clamps of various sizes & associated installation tools & housings. (Wood Group)Subsea Pipeline Plugs. (Subsea 7)46" Riser Hang-off (BG / Technip)Other projects Include; - A frames for subsea7 & Sonsub- Hangar based LARS (launch & recovery for ROV's & TMS's)- J tube seals for Parker/Scanrope- Tether Management Systems (TMS)- Pigging Tools

    • United Kingdom
    • Public Safety
    • 100 - 200 Employee
    • Fire Fighter
      • Dec 2004 - Nov 2011

      Retained fire fighter. Retained fire fighter.

    • Oil and Gas
    • 100 - 200 Employee
    • Design engineer
      • Nov 2005 - Nov 2010

      Design Engineer of pipeline pigging tools - Mechanical Design - Project Management - Contract & Technical Review - Costing & Estimating - Material procurement - Interim Lead Engineer over 6 month period Advanced Solidworks 3D designer Opera User - Comprehensive understanding of multi-level BOMs Design Engineer of pipeline pigging tools - Mechanical Design - Project Management - Contract & Technical Review - Costing & Estimating - Material procurement - Interim Lead Engineer over 6 month period Advanced Solidworks 3D designer Opera User - Comprehensive understanding of multi-level BOMs

Education

  • TEESSIDE UNIVERSITY
    BEng (Hons), Mechanical Engineering
    2010 - 2012
  • Teesside University
    FdDeg, Engineering Design
    2009 - 2010
  • Jee Ltd.
    Upstream Oil & gas industry orientation
    2009 - 2009
  • Jee Ltd.
    Overview of Pipeline Engineering
    2009 - 2009
  • Teesside University
    HNC, Mechanical engineering
    2007 - 2009
  • PRINCE2®

Community

You need to have a working account to view this content. Click here to join now