Micah Maples

Work Control Manager at Fluor Federal Services Inc.
  • Claim this Profile
Contact Information
Location
Baton Rouge Metropolitan Area

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • 1 - 100 Employee
    • Work Control Manager
      • Dec 2020 - Present
    • United States
    • Construction
    • 700 & Above Employee
    • Sr Construction Planner/Scheduler
      • Sep 2016 - Dec 2020

    • Lead Shutdown Scheduler
      • May 2015 - Sep 2016

      Lead Shutdown Scheduler for Exxon Mobil assets for their large 2016 multiple facility outage.

    • EPC Sr Planner/Scheduler
      • Feb 2014 - Oct 2015

      Exxon Mobil, - Managed, Created, Maintained all aspects of eng, procurement, fab, construction, & commissioning schedules for small caps projects group. Routinely participated in constructability review with engineering, all levels of gates reviews, and checkpoints. Developed manpower plans against construction schedules. Participated in daily construction meetings to monitor schedule and critical path as executed is ongoing in the field.

    • Sr Construction Planner/Scheduler
      • Dec 2012 - Feb 2014

      Exxon Mobil, Orlan Gas Platform, 3 Well Expansion Project, -- 1st of its kind project with Exxon to install 3 new wells on existing platform by coring through GBS of structure, including the installation of additional flowlines and related E&I. Assumed control of construction schedule as project as behind; rebaselined,and turned more focus to the critical path activities that were not well highlighted. Scheduling for multiple contractors, fab shop work and material deliverables.

    • France
    • Railroad Equipment Manufacturing
    • Sr Shutdown Planner/Scheduler
      • Jun 2010 - Nov 2012

      SEIC (Shell) Liquefied Natural Gas facility (LNG), – Built and maintained shutdown schedule for LTPI SD in 2010,and HGPI shutdown in 2011 & 2012 along with additional LTPI shutdowns for 5 GTGs onsite. Tracked emergent work and integrated into schedule for monitoring of effect on critical path. Planned work for all shutdowns and coordinated with numerous contractors during SD. Trained/mentored local Russian counterpart to take over my role as shutdown scheduler. SEIC (Shell) Liquefied Natural Gas facility (LNG), – Built and maintained shutdown schedule for LTPI SD in 2010,and HGPI shutdown in 2011 & 2012 along with additional LTPI shutdowns for 5 GTGs onsite. Tracked emergent work and integrated into schedule for monitoring of effect on critical path. Planned work for all shutdowns and coordinated with numerous contractors during SD. Trained/mentored local Russian counterpart to take over my role as shutdown scheduler.

    • Oil and Gas
    • 1 - 100 Employee
    • Project Controls, Planner/Scheduler
      • Oct 2009 - Jun 2010

      Adv LIGO Project, – Installation planning for revamp of existing interferometers in both Richland, WA and Livingston, LA. Creating new level 2 summary schedule, to detailed resource loaded level 4. Coordination with relevant team leads between both sites, CIT, and MIT. Development of staffing plans, and creation of organizational charts. Creation and management of cost/schedule change orders to baseline schedule. Adv LIGO Project, – Installation planning for revamp of existing interferometers in both Richland, WA and Livingston, LA. Creating new level 2 summary schedule, to detailed resource loaded level 4. Coordination with relevant team leads between both sites, CIT, and MIT. Development of staffing plans, and creation of organizational charts. Creation and management of cost/schedule change orders to baseline schedule.

    • Sr Construction Planner/Scheduler
      • Mar 2008 - May 2009

      TANECO, – $7.5 Billion grassroots 185,000 Barrel per day Oil Refinery – Responsible for planning out new construction work in various units to include Crude and Vacuum Distillation Units, SRUs, SWS, WWT, Flares, & other Utilities. Created and maintained various unit construction schedules. Worked to create & maintain master job schedule for site, including commissioning & startup activities. Lead and coordinated this schedule integration with construction & engineering schedulers. TANECO, – $7.5 Billion grassroots 185,000 Barrel per day Oil Refinery – Responsible for planning out new construction work in various units to include Crude and Vacuum Distillation Units, SRUs, SWS, WWT, Flares, & other Utilities. Created and maintained various unit construction schedules. Worked to create & maintain master job schedule for site, including commissioning & startup activities. Lead and coordinated this schedule integration with construction & engineering schedulers.

    • Construction Planner/Scheduler
      • Feb 2007 - Mar 2008

      HOVENSA, – NAWS is EPC company with the contract for construction of new Advanced Waste Water Treatment plant & revamp of existing plant. I maintained/modified master project schedule for the job, including creating recovery schedule. Coordinated with subcontractors on meeting schedule deadlines. Weekly and monthly schedule reports made to client. Maintained field progress monitoring system with S-curves. Worked with engineering on developing tie-in and startup plan. HOVENSA, – NAWS is EPC company with the contract for construction of new Advanced Waste Water Treatment plant & revamp of existing plant. I maintained/modified master project schedule for the job, including creating recovery schedule. Coordinated with subcontractors on meeting schedule deadlines. Weekly and monthly schedule reports made to client. Maintained field progress monitoring system with S-curves. Worked with engineering on developing tie-in and startup plan.

    • United States
    • Utilities
    • 1 - 100 Employee
    • Cost Control Engineer
      • Jul 2006 - Feb 2007

      MOTIVA Refinery, – Developing Budgets & cost projection for Low NOx Projects. Combined total cost of $55m. Establish/maintaining project cost reports and forecasts. Tracking of field change orders. Enter WOs, PRs, & POs as required. Approve, validate, and/or audit invoices. Prepare monthly CAPEX, and Cash flow forecast. As required, prepare accrual information. Perform high level validation of the original AFE estimate. Verify accuracy and completeness of proposal packages, & assist in bid tabulation. Prepare reports for project management. Show less

    • Oil and Gas
    • 1 - 100 Employee
    • Project Controls/Scheduler
      • Apr 2006 - Jul 2006

      VALERO Refinery, – Replacement Construction Planner/Scheduler for construction project of ULSD unit. CB&I general contractor on job. Maintained schedule, Pre-paired recovery schedule to recover from performance losses over job. Prepare variation analysis, including trends and changes. Maintained work scope tracking log, to track piping, equipment & subcontractor progress. Reports to client in weekly meetings on CB&I and subcontractor schedule attainment, progress and deliverables.

    • Project Controls Lead
      • Jul 2005 - Apr 2006

      MOTIVA Refinery,– Project Controls Lead for FCCU 140,000MH Turnaround, total cost $21m. CB&I general contractor on job. Cost controls, Developing cost projection for T/A and tracking cost throughout. Reporting to Client and CB&I on cost progress. Invoicing of client based off of contract. Tracking of field change orders and estimating costs of FCO’s and impact to T/A cost. Maintained planned vs. actual report and worked with scheduler on earned vs. actual report.

    • Virgin Islands, U.S.
    • Oil and Gas
    • 100 - 200 Employee
    • Maintenance Planner/Scheduler
      • Jul 2004 - Jul 2005

      HOVENSA (world class merchant refinery with Crude capacity of 495,000 barrels per day), – Went direct hire with Hovensa as Maintenance Planner/Scheduler - Responsible for 4 SRUs, 4 SWSs, 2 Beavon Units, Purge Treatment Unit, 3 API Separators, 2 Neshaps Strippers, Waste Water Treatment plant, and all flares on site. Duties in both Sulfur & Waste Water zones included, estimating of work, defining materials needed to perform work and building of scaffolds and insulation removed as needed. Material procurement (Ordering material from warehouse or off island purchases. Scheduling of jobs with operations on availability of material and maintenance manpower. Scheduling of rigs or other heavy equipment, and coordination with third party contractors in order to perform work in a timely manner as to not break schedule. Reading engineering drawings & performing take offs Show less

    • United States
    • Construction
    • 700 & Above Employee
    • Maintenance Planner/Scheduler
      • Aug 2002 - Jul 2004

      HOVENSA (world class merchant refinery with Crude capacity of 495,000 barrels per day), – In charge of planning work for new Delayed Coking unit put online August of 2002 (capable of 58,000 B/D output) and the planning of work in 4 SRUs, 4 SWSs, 2 Beavon Units, and all flares on site. Duties in both Coker and Sulfur zones included, estimating of work, defining materials needed to perform work and building of scaffolds and insulation removed as needed. Material procurement (Ordering material from warehouse or off island purchases. Scheduling of jobs with operations on availability of material and maintenance manpower. Scheduling of rigs or other heavy equipment, and coordination with third party contractors in order to perform work in a timely manner as to not break schedule Show less

    • Comminssioning/Maintenance Planner/Scheduler
      • Mar 2001 - Aug 2002

      BASF/FINA Ethylene Facility, – Assisted in commissioning planning and start-up scheduling of facility and eventual transition into maintenance including cost controls and project work. Assisted in the planning/scheduling of two turnarounds proceeding and following start-up due to the unforeseen problems the new facility experienced.

    • Foreman, Boilermaker, Pipe Fitter Helper
      • May 1997 - Mar 2001

      Arch Chemical Turnaround, Beaumont, TX – ForemanIneos Acrylics Turnaround, Beaumont, TX – BoilermakerDupont Sabine River Works Ethylene Unit Turnaround, Orange, TX ¬ – BoilermakerBeaumont Methanol Turnaround, Beaumont, TX – BoilermakerValero Refinery Turnaround, Texas City, TX – Expeditor US Intec Turnaround, Port Arthur, TX – Pipe Fitter HelperDupont Sabine River Works – Project Work, Orange TX – Pipe Fitter HelperAir Liquide Turnaround, Channel View, TX – Pipe Fitter HelperECI Carbon Black Turnaround, Orange, TX – Pipe Fitter HelperAir Liquide- New Construction, Nederland, TX – Pipe Fitter Helper Show less

Education

  • Nederland High School

Community

You need to have a working account to view this content. Click here to join now