Moody Metry, P.E.

Structural Engineer at DB Sterlin Consultants, Inc.
  • Claim this Profile
Contact Information
Languages
  • English Native or bilingual proficiency
  • Arabic Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Fracture Critical Inspection Techniques for Steel Bridges
    FHWA National Highway Institute
    Sep, 2022
    - Sep, 2024
  • NBIS Team Leader - Element
    Illinois Department of Transportation
    Aug, 2022
    - Sep, 2024
  • Project Leadership Training
    Illinois Institute of Technology
    Mar, 2022
    - Sep, 2024
  • Safety inspection of In-Service Bridges, FHWA 130055
    FHWA National Highway Institute
    Mar, 2022
    - Sep, 2024
  • Communication Foundations
    LinkedIn
    Feb, 2022
    - Sep, 2024
  • Interpersonal Communication
    LinkedIn
    Jan, 2022
    - Sep, 2024
  • Project Managment Foundations
    Lynda.com
    Dec, 2021
    - Sep, 2024
  • Introduction to element level bridge inspection
    Illinois Department of Transportation
    Sep, 2021
    - Sep, 2024
  • Learning Data Analytics
    Lynda.com
    Sep, 2021
    - Sep, 2024
  • PE Structural Exam (PASS)
    NCEES
    Oct, 2020
    - Sep, 2024
  • FE Exam (PASS)
    NCEES
    Nov, 2018
    - Sep, 2024
  • LICENSED PROFESSIONAL ENGINEER
    Illinois Department of Financial and Professional Regulation
    Jul, 2022
    - Sep, 2024

Experience

    • United States
    • Civil Engineering
    • 1 - 100 Employee
    • Structural Engineer
      • Oct 2019 - Present

      Grand Avenue from Ogden Avenue to Canal Street CHICAGO DEPARTMENT OF TRANSPORTATION Project Manager responsible for project oversight, coordination and deliverables including inspection, plans, reports, cost estimate, and quantities. Scope of work includes full survey, utility coordination and structural evaluation of existing vaulted sidewalks. Structural work includes the inspection and evaluation of existing vaulted sidewalks along Grand Avenue to determine the general structural condition of the existing sidewalks, steel or reinforced concrete framing and supporting columns, walls and retaining walls. In addition, assisted in recommending structural repairs as needed to address all structural concerns. Western Avenue Bridge Over the Sanitary and Ship Canal CHICAGO DEPARTMENT OF TRANSPORTATION Project Manager responsible for project oversight, coordination, BCR, pier analysis and pier condition survey for the rehabilitation of Western Avenue Bridge. The scope includes evaluation of existing piers to determine the structural integrity of the structure to hold the proposed loads. In addition, assisted in recommending structural repairs and maintenance needed to address all structural concerns to ensure proper life cycle for the bridge. Lake Street Bascule Bridge Rehabilitation CHICAGO DEPARTMENT OF TRANSPORTATION Structural Engineer assisted with the design of various structural Elements. Elements include upper-level CTA framing, bridge house steel framing, and fixed span portions. In addition, assisted with various structural inspections, quantity calculations, coordination, and complete structural drafting using MicroStation v8i. Chicago Bridge Inspection Team CHICAGO DEPARTMENT OF TRANSPORTATION Structural engineer responsible for bridge inspections for CDOT to ensure structural adequacy. Bridge inspections include routine, special, in-depth, element-level, and fracture critical according to CDOT, and NHI standards.

    • Design Engineer
      • Jun 2018 - Oct 2019

      Tollway - Pavement and Structural improvements @ I-90 from Mile Post 2.6 to Mile Post 18.3 ○ Conducted site visits to evaluate the Rockner bridge, median barriers, and sign structures along I-94 in Rockford ○ Drafted 60% plans for the following: Median barriers, retaining walls, and sign structures showing existing conditions and proposed improvements ○ Prepared cost estimates Civil: Prairie Bike Path - Aurora ○ Designed proposed alignment and profile according to IDOT's manuals and standards for Phase I ○ Drafted plan and profile sheets utilizing MircroStation SS4 and GeoPak ○ Coordinated utility conflicts throughout the project limits through JULIE and utility companies ○ Coordinated with bike organizations to inform them with proposed work ○ Developed various exhibits including: ESR and Wetlands ○ Calculated quantities according to IDOT standards for Phase I cost estimate Barrier Warrant Analysis (BWA) : ○ Evaluated numerous BWAs for IDOT as part of various-various contracts ○ Conducted various site visits to examine traffic operations, potential hazards and note traffic counts ○ Evaluated Barrier warrants based on IDOT's guidelines and examples included in the BDE Manual and produced a summary of findings, and recommendations Structural: ○ Developed structural plan sheets: bridges (superstructure and sub-structure), retaining walls and median barriers ○ Calculated quantities according to IDOT's standards IL-2 Corridor - Water Resources ○ Conducted design of ditches, roadway and driveway culverts, and storm sewers according to the latest IDOT drainage manual under the supervision of senior engineer ○ Delineated drainage to determine runoff coefficients, rainfall intensities, and flows ○ Completed hydraulic reports that included: written reports, photographs, calculations, exhibits to show design concepts utilizing MicroStation and Geopak

    • Canada
    • Education Management
    • 1 - 100 Employee
    • Math, Physics, and Chemistry Tutor
      • Aug 2015 - May 2016

      -Answered questions and gave tips to students that were struggling in Mathematics, and Science courses-Led small study groups-Encouraged students to use the resources available in our STEM centers-Connected students with special needs to the appropriate departments

    • International Student Ambassador
      • Aug 2014 - May 2016

      -Served as a peer mentor to a group of 5-10 new international students, and met them at least 3 times per semester.-Took initiative in being knowledgeable about Cañada’s programs of study and student services offices-Assisted with various activities and events including orientation,campus visits, campus tours for agents and prospective students, international student workshops-Gathered content and wrote for The Olive Branch: International Student Newsletter-Participated in the international education advisory board meetings

    • Student Government Senator
      • Aug 2014 - May 2015

      -Expressed student's struggles, needs and to give feedback on how to improve the student's life on campus-Collaborated with different teams, and organizations on campus to plan, and manage different campus events-Approved budget requests for various campus clubs and organizations-Gave presentations, and gave feedback to the Senate from conferences, and workshops

Education

  • University of Illinois at Chicago
    Bachelor’s Degree, Civil Engineering

Community

You need to have a working account to view this content. Click here to join now