Metehan YUKSELEN

General Manager at ACCOMAR
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Turkey, TR
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Shipbuilding
    • 1 - 100 Employee
    • General Manager
      • Jun 2017 - Present

      Founding Partner & Member of the Board.Marine Interior Expert.Business Development & Marketing.Interior Budget Estimator & Planner.Engineering, Procurement and Installation Coordination.Turnkey Interior Project References @ ACCOMAR AS btw 2017-2020:* Ship Owner: Havila Kystruten, Ship Type: Coastal Passenger Cruisers ( 2 projects) - New Building - for Norway* Ship Owner: Stena Line, Ship Type: Ropax Ferries "Stena Europe-Stena Mersey- Stena Lagan" - Refit & Refurbishment - for Sweden* Ship Owner: Fjord 1 , Ship Type: Car and Passenger Ferries (3 projects) - New Building - for Norway* Ship Owner: Seaspan , Ship Type: Trailer Ferries at DAMEN Romania (2 projects) - New Building - for Canada* Ship Owner: ArcticService JSC , Ship Type: Crab Catcher and Processor Vessels (6 projects) - New Building - for Russia* Ship Owner: Boskalis SKline , Ship Type: Geophysical Research Vessel (1 Project) - Refit & Refurbishment - for Netherlands* Ship Owner: Basto Fosen , Ship Type: Passenger and Car Ferries (4 projects) - New Building - for Norway* Ship Owner: Havbor AS , Ship Type: Danish Seine Fishing (1 Project) - New Building - for Norway* Ship Owner: Torghatten Traffikkelskapp , Ship Type: Car & Passenger Ferry (1 Project) - New Building - for Norway* Ship Owner: Nye Radek AS , Ship Type: Purse Seiner (1 Project) - New Building - for Norway* Ship Owner: VEA AS , Ship Type: Fishing Trawler (1 Project) - New Building - for Norway* Ship Owner: Star Clipper , Ship Type: Cruiser Sail Ship (1 Project - New Building - for Croatia* Ship Type: FiFi Boat (1 Project) - New Building - for Türkmenistan* Ship Type: 65m Catamaran Fast Ferry - - New Building - for Middle East

    • Türkiye
    • Shipbuilding
    • 400 - 500 Employee
    • Project Manager
      • Dec 2009 - Jun 2017

      - NB26&27 (150PCU FERRY ) Car&Passenger Ferry; Managing the Project from contract to delivery.- NC01 (IZMIT BAY BRIDGE PROJECT) South Approach Viaduct; Managing the Steel workshop production, from contract to delivery to Assembling Site.- NB01&02 (13.000 DWT) General Cargo Vessel; Managing the Project from keellaying to the delivery. Dealing with the Shipyard Guarrantee issues.- NB03&04&05&06 (86PCU FERRY) Car&Passenger Ferry; Consulting to the production, from design preparation until the Launching.- NB07&08 (ALU. FRB) Aluminum Fast Rescue Boat; Consulting to the Aluminum Hull production, from design preparation until the Launching.- NB15&17 (150 DWT ) Fish Farming Barges; Managing the Projects from steel cutting to the delivery.- NB16 (16.500 DWT ) General Cargo Vessel; Managing the Project from contract to delivery.- NB18 (45T BP AHT ) 49,5m Anchor Handling Tug; Managing the production, from design preparation till Launching.- NB10&11 (26.000 DWT ) General Cargo Vessel; Managing the production, from design preparation till Launching.- NB13 (60T BP TUG) 30m Tructor Tug; Managing the production, from design preparation until the Launching.- NB14 (200T BP ERV TUG) 90m PSV type Rescue Vessel; Managing the production, from design preparation until the Launching.- NB21 (70PCU FERRY ) Car&Passenger Ferry; Managing the production, from design preparation until the Launching.- NB22 (25PCU FERRY ) Car&Passenger Ferry; Managing the production, from design preparation until the Launching.- NB23 (3000 m3 FISHING ) 78m Live Fish Carrier; Managing the production, from design preparation until the Launching.- NB24 (38PCU FERRY ) Car&Passenger Ferry; Managing the production, from design preparation until the Launching.- NB25 (40PCU FERRY ) Car&Passenger Ferry; Managing the production, from design preparation until the Launching.- NB28&29 (200PCU FERRY ) Car&Passenger Ferry; Consulting to the Project from contract to delivery.

    • Project Manager
      • Oct 2007 - Oct 2009

      - NB14 (10.500 DWT) Chemical Tanker; Managing the Project starting from steel cutting to the delivery. - NB10&11 (20.000 DWT) Chemical Tanker; Managing the Project starting from keellaying to the delivery.- Additionally Coordinating the Transportation team and consulting to the transportation Works. - NB14 (10.500 DWT) Chemical Tanker; Managing the Project starting from steel cutting to the delivery. - NB10&11 (20.000 DWT) Chemical Tanker; Managing the Project starting from keellaying to the delivery.- Additionally Coordinating the Transportation team and consulting to the transportation Works.

    • Planning & Project Manager
      • Jan 2005 - Aug 2007

      - Establishing the Job Preperation Department and adapting all departments to IFS (Erp software).- NY01 42 m Motor YACHT; Consulting to the Hull production& Finalizing the machinery, Piping, outfitting works and delivery.- NB04 and NB05 Split barges; Finalizing the machinery, Piping, outfitting works and delivery. - NB30 and NB31 (12000DWT) Chemical Tankers; Preparing the detailed Budget and Building plan. Managing the Subcontractors. Directing the hull construction and painting onsite.- NB32-33-34-35 (900 TEU) Container Ships; Preparing the detailed Budget and Building plan. Managing the Subcontractors. Directing the hull construction,outfitting, machinery and painting onsite.

    • Steel Construction and Outfitting Chief
      • Dec 2003 - Apr 2004

      - Production of ship outfitting equipments, mounting and installation on the vessel. - Portal Cranes (Various tonnages) design, production and onsite installation. - Production of ship outfitting equipments, mounting and installation on the vessel. - Portal Cranes (Various tonnages) design, production and onsite installation.

    • Construction Engineer
      • Feb 2002 - Nov 2003

      -Steel Construction of Yacht Blocks-Aluminum Construction of Yacht Blocks -Steel Construction of Yacht Blocks-Aluminum Construction of Yacht Blocks

    • Autocad, Tribon M2, Rhino Designer
      • Jan 2001 - Jun 2003

      - AutoCAD & Tribon M2 Hull design- Preparing the nesting and construction drawings of various projects. - AutoCAD & Tribon M2 Hull design- Preparing the nesting and construction drawings of various projects.

Education

  • Istanbul Technical University
    Bachelor of Science (BS), Naval Architecture and Marine Engineering
    1997 - 2002
  • Kdz. Ereğli Anatolian High School
    4,9/5, Mathematics
    1990 - 1997

Community

You need to have a working account to view this content. Click here to join now