Mervyn Day

Construction Manager at MWH Treatment
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Kingsnorth, England, United Kingdom, GB

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Construction
    • 500 - 600 Employee
    • Construction Manager
      • Feb 2016 - Present

    • Project Manager / Senior Site Manager
      • Jul 2012 - Sep 2015

      Project Manager / Senior Site Manager on the following:Affinity Water SEMD works to upgrade Pumping Station, Reservoir and Bore Hole Safety and Security from initial scoping through to installation, asset integration and commissioning, having overall responsibility for Health and Safety, effectively managing the plant, labour and equipment to achieve maximum efficiency and ensuring the projects were completed safely, on time and within budget. Thames Water Alliance Crossness STW Inlet Pumping Station Upgrade which consisted of the major refurbishment of this strategically important pumping station to increase capacity to 13,685 l/s by replacing 12 drywell shaft driven pumps with 13 drywell submersibles whilst maintaining a minimum flow capability at all times to eliminate overflow in the network. Work involved the management of client expectations as well as managing the supply chain in the face of significant engineering, construction, health, safety and welfare, cost and programme challenges.

    • India
    • Freight and Package Transportation
    • Senior Site Manager
      • Oct 2011 - Jul 2012

      Senior Site Manager with Mechanical and Civil responsibility for the the upgrading of various Southern Water Treatment works, including the installation of Ferric Dosing, Ammonia monitoring and balance tanks. Senior Site Manager with Mechanical and Civil responsibility for the the upgrading of various Southern Water Treatment works, including the installation of Ferric Dosing, Ammonia monitoring and balance tanks.

    • Senior Site Manager
      • Feb 2010 - Oct 2011

      Senior Site Manager on the refurbishment and modification of various Reservoir and Pumping station sites for Veolia Water South East to enable them to remove a strategic Reservoir Site from service. Including Civils’ construction, boreholes, 300mm and 450mm pipework modifications, Piping Specials and Flowmeter installations. Senior Site Manager on the refurbishment and modification of various Reservoir and Pumping station sites for Veolia Water South East to enable them to remove a strategic Reservoir Site from service. Including Civils’ construction, boreholes, 300mm and 450mm pipework modifications, Piping Specials and Flowmeter installations.

    • Construction Manager
      • 2007 - 2010

      Construction Manager with Mechanical and Civil responsibility on the Thames Water AMP4 framework contract on the following within the M25: A 1000mm diameter steel water main diversion and replacement including the laying of a 800dia MDPE temporary pipeline and two under pressure connections between Catford and Lewisham to allow National Grid to carry out repairs to their 275kva cables  A Sewage pumping station and wet well refurbishment in Crayford, involving complex over pumping, demolition and the laying of a new main on a busy highway The installation of a 600mm and 1800 mm diameter flood alleviation Tunnel scheme under Sidcup involving 5meter deep open cut, Auger Bore and Pipe Jacked methods of installation

    • Project Engineer
      • 2006 - 2007

    • Construction
    • 300 - 400 Employee
    • Mechanical Site Manager
      • 2005 - 2006

    • Mechanical & Civil Supervisor
      • 2005 - 2005

    • Mechanical Supervisor
      • 2003 - 2005

    • Events Services
    • 1 - 100 Employee
    • Mechanical Refurbishment Manager
      • 2003 - 2003

Education

  • Rochester
    1960 - 1971
  • Medway Technical College
    HND/OND Welding & Fabrication
    -

Community

You need to have a working account to view this content. Click here to join now