MERVE ATALAY
Supplier Technical Assurance Specialist at TCI Aircraft Interiors- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Turkish Native or bilingual proficiency
-
English Professional working proficiency
-
German Elementary proficiency
Topline Score
Bio
Credentials
-
AS9100 Rev.:D - Aviation, Space and Defense Industry Basic Information and Internal Auditor Training
KiwaFeb, 2023- Nov, 2024 -
Geometrical Dimensioning And Tolerancing Training
7 Eksen DanışmanlıkAug, 2022- Nov, 2024 -
AS 13000_ Problem Solving Requirements for Suppliers
Destek Mühendislik Ltd.Jul, 2021- Nov, 2024 -
5S Training
KiwaFeb, 2018- Nov, 2024 -
IRIS ( INTERNATIONAL RAILWAY INDUSTRY STANDARD )
Bureau VeritasMar, 2017- Nov, 2024 -
IRIS ( INTERNATIONAL RAILWAY INDUSTRY STANDARD INTERNAL AUDITOR )
Bureau VeritasMar, 2017- Nov, 2024 -
6 SİGMA
İTÜDec, 2016- Nov, 2024 -
Üretim Parçası Onay Prosesi (PPAP) Eğitimi
Kariyer.netSep, 2016- Nov, 2024 -
İleri Ürün Kalite Planlaması (APQP) Eğitimi
Kariyer.netJun, 2016- Nov, 2024 -
Global 8D Problem Solving Method
Kariyer.netMar, 2016- Nov, 2024 -
Occupational Health and Safety
Ministry Of Labor And Social SecurityDec, 2015- Nov, 2024 -
Solidworks
BiladımSep, 2014- Nov, 2024 -
OHSAS-18001 : 2008 OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEMS FOUNDATION TRAINING
VİZYON 2071Mar, 2013- Nov, 2024 -
TS-EN-ISO 14001 : 2004 ENVIRONMENTAL MANAGEMENT SYSTEMS FOUNDATION TRAINING
VİZYON 2071Mar, 2013- Nov, 2024 -
TS-EN-ISO 19011 : 2004 AUDIT FOUNDATION TRAINING
VİZYON 2071Mar, 2013- Nov, 2024 -
TS-EN-ISO 22000 : 2005 FOOD SAFETY MANAGEMENT SYSTEMS FOUNDATION TRAINING
VİZYON 2071Mar, 2013- Nov, 2024 -
TS-EN-ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEMS FOUNDATION TRAINING
VİZYON 2071Mar, 2013- Nov, 2024
Experience
-
TCI Aircraft Interiors
-
Türkiye
-
Aviation and Aerospace Component Manufacturing
-
200 - 300 Employee
-
Supplier Technical Assurance Specialist
-
Sep 2023 - Present
-
-
-
Unimetal Investment Casting & Precision Machining
-
Türkiye
-
Mining
-
1 - 100 Employee
-
Quality Assurance Manager
-
Mar 2018 - Aug 2023
-
-
Quality Assurance Engineer
-
Nov 2015 - Mar 2018
-
-
-
-
Research and Development Engineer
-
Dec 2014 - Dec 2015
-Production Monitoring -Preparing to operational technical drawing for the manufacturing with Solidworks program. -Calculating of the CNC machine efficiency. -Doing daily stock follow-up. -Searching new ideas or applications to increase labor productivity. -Preparing the production plan according to order. -Production Monitoring -Preparing to operational technical drawing for the manufacturing with Solidworks program. -Calculating of the CNC machine efficiency. -Doing daily stock follow-up. -Searching new ideas or applications to increase labor productivity. -Preparing the production plan according to order.
-
-
-
-
Mechanical Engineer
-
Sep 2013 - Jan 2014
Drawing of a sanitary installations systems and heating and cooling systems according to project and perfoming their controls.Doing operations of repair and maintenance and tenders. Drawing of a sanitary installations systems and heating and cooling systems according to project and perfoming their controls.Doing operations of repair and maintenance and tenders.
-
-
-
-
Mechanical Engineer
-
Aug 2012 - Sep 2012
My intern experiences are given as follows; a. Plant organisation and management (type of organisation, production planning and control techniques,accounting, sale and purchasing departments, plant layout, etc.) b. Factors taken into account for plant location (staff, energy, raw material, sale and delivery, etc.) c. Improvements in production/assembly lines and production capacity d. Storage and stock layout, quality control applications e. Other auxiliary facilities (power plant, heating unit, etc.) f. Safety, boss-worker relations Show less
-
-
-
-
Mechanical Engineer
-
Jul 2011 - Aug 2011
My intern experiences are given as folllows; a. Foundry work b. Welding and heat treatment c. Chip removal processes such as turning, milling, drilling, grinding, etc. d. Press work and hot/cold working processes e. Special purpose machines and processes My intern experiences are given as folllows; a. Foundry work b. Welding and heat treatment c. Chip removal processes such as turning, milling, drilling, grinding, etc. d. Press work and hot/cold working processes e. Special purpose machines and processes
-
-
-
-
Mechanical Engineer
-
Aug 2010 - Sep 2010
Laboratory intern a.Operations of Turning machine b.Operations of Milling machine c.Operations of Welding d.Operations of Engine Laboratory intern a.Operations of Turning machine b.Operations of Milling machine c.Operations of Welding d.Operations of Engine
-
-
Education
-
Gaziantep Üniversitesi
Mechanical Engineering -
TED Karadeniz Ereğli Koleji Vakfı
Mathematics