MERKOURIOS MARAS
Civil engineer, Welding Engineer at THALIS P.C- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
THALIS P.C
-
Greece
-
Business Consulting and Services
-
1 - 100 Employee
-
Civil engineer, Welding Engineer
-
Feb 2015 - Present
-
-
Concrete pipeline Inspector
-
Feb 2017 - May 2017
Project: Leviathan Oil Field DevelopmentClient: Noble EnergyVendor: Corinth pipeworks S.AScope: Manufacturing of 15km LSAW offshore pipes externally coated (PE, PP +CWC) & internally epoxy lined.Position: Assistant Lead Inspector
-
-
-
TÜV Rheinland Group
-
Germany
-
Public Safety
-
700 & Above Employee
-
Quality Control Inspector
-
Jul 2021 - Aug 2021
Project: Installation of New Desalter Train at GC-09, GC-10, GC-19, GC-21Client: Kuwait Oil CompanyVendor: MTUPackager: SeawayScope: Functionality acceptance test of Diesel Generator Packages.Position: Inspector Project: Installation of New Desalter Train at GC-09, GC-10, GC-19, GC-21Client: Kuwait Oil CompanyVendor: MTUPackager: SeawayScope: Functionality acceptance test of Diesel Generator Packages.Position: Inspector
-
-
-
OCA GLOBAL
-
Spain
-
Business Consulting and Services
-
700 & Above Employee
-
Inspector
-
May 2021 - Aug 2021
Project: NPC CONDENSATE DISTILLATION UNIT (CDU-4)Client: PetrojetVendor: Metron S.AScope: Inspection of Chemical injection package.Position: Inspector Project: NPC CONDENSATE DISTILLATION UNIT (CDU-4)Client: PetrojetVendor: Metron S.AScope: Inspection of Chemical injection package.Position: Inspector
-
-
-
Applus+
-
Spain
-
Business Consulting and Services
-
700 & Above Employee
-
Pipeline Inspector
-
Apr 2021 - May 2021
Project: KGD6-MJ FIELD DEVELOPMENTClient: TFMC FRANCEVendor: Corinth pipeworks S.AScope: Manufacturing of 8,5km LSAW pipes & 3LPE coatingPosition: Inspector Project: KGD6-MJ FIELD DEVELOPMENTClient: TFMC FRANCEVendor: Corinth pipeworks S.AScope: Manufacturing of 8,5km LSAW pipes & 3LPE coatingPosition: Inspector
-
-
-
-
Pipeline Inspector
-
Jan 2021 - Feb 2021
Project: MURFY KING's QUAY SUBSEA7Client: SUBSEA7Vendor: Corinth pipeworks S.AScope: Manufacturing of 30Km (approx.) HFW pipes with externally FBE coated. Project: MURFY KING's QUAY SUBSEA7Client: SUBSEA7Vendor: Corinth pipeworks S.AScope: Manufacturing of 30Km (approx.) HFW pipes with externally FBE coated.
-
-
-
ABS Group
-
Furniture and Home Furnishings Manufacturing
-
Pipeline Inspector
-
Oct 2020 - Jan 2021
Project: Baltic onshore Project (Lot 3)Client: EnerginetVendor: Corinth pipeworksScope: Manufacturing of 140km (approx) HSAW+LSAW onshore pipes externally PE coated & internally epoxy lined. Project: Baltic onshore Project (Lot 3)Client: EnerginetVendor: Corinth pipeworksScope: Manufacturing of 140km (approx) HSAW+LSAW onshore pipes externally PE coated & internally epoxy lined.
-
-
-
TÜV AUSTRIA HELLAS Inspection and Certification Body
-
Greece
-
Industrial Machinery Manufacturing
-
100 - 200 Employee
-
Welding Inspector
-
Mar 2020 - Dec 2020
Project: TEMPORARY (PORTABLE) MR FOR MEGALOPOLI - DESFA Client: DESFAVendor: MetronScope: Fabrication (Bevel preparation fit up & alignment), production surveillance, Visual check of welded joints, Branch and piping spools, Hydrostatic test of piping spools and vessels. PT, UT, MT inspection, Documentation review.Position: Inspector
-
-
Welding Inspector
-
Feb 2020 - Oct 2020
Project: Detailed engineering, procurement, and construction for the interconnection between tap and NNGS pipeline at the area of Νea Μessimvria -Thessaloniki.Client: DESFAVendor: MetronScope: Fabrication (Bevel preparation fit up & alignment), production surveillance, Visual check of welded joints, Branch and piping spools, Hydrostatic test of piping spools and vessels. PT, UT, MT inspection, Documentation review.
-
-
Tank Inspector
-
Jan 2020 - Feb 2020
Project: Underground Jet-Fuel Tank InspectionClient: E.K.O
-
-
-
-
Pipeline Inspector
-
Mar 2020 - Sep 2020
Project: EPII Baltic Pipe (Lot 1 Offshore)Client: EnerginetVendor: Corinth Pipeworks S.AScope: Manufacturing of approx. 67km LSAW offshore pipes externally 3LPP & CWC coated (incl. Anode installation) Position: Inspector Project: EPII Baltic Pipe (Lot 1 Offshore)Client: EnerginetVendor: Corinth Pipeworks S.AScope: Manufacturing of approx. 67km LSAW offshore pipes externally 3LPP & CWC coated (incl. Anode installation) Position: Inspector
-
-
-
-
Pipeline Inspector
-
Oct 2019 - Dec 2019
Project: ENI LSAW Sour service QualificationVendor: Corinth Pipeworks S.AScope: 3.2 Certification for ENI LSAW sour service QualificationPosition: Inspector Project: ENI LSAW Sour service QualificationVendor: Corinth Pipeworks S.AScope: 3.2 Certification for ENI LSAW sour service QualificationPosition: Inspector
-
-
-
-
Lead Inspector
-
Jan 2019 - Sep 2019
Project: BP MANUEL offshore projectVendor: Tennaris S.p.a Dalmine ItalyScope: Manufacturing of Risers & Inner & Outer seamless pipes.Position: Lead Inspector Project: BP MANUEL offshore projectVendor: Tennaris S.p.a Dalmine ItalyScope: Manufacturing of Risers & Inner & Outer seamless pipes.Position: Lead Inspector
-
-
-
-
Pipeline Inspector
-
Jun 2018 - Oct 2018
Project: MITE SONATRACHClient: M.I.T.EVendor: Corinth Pipeworks S.AScope: Manufacturing of 145Km offshore pipes externally PE coated & internally epoxy lined.Position: Inspector Project: MITE SONATRACHClient: M.I.T.EVendor: Corinth Pipeworks S.AScope: Manufacturing of 145Km offshore pipes externally PE coated & internally epoxy lined.Position: Inspector
-
-
-
MARAS
-
Belgium
-
1 - 100 Employee
-
Inspector
-
Jan 2014 - Dec 2015
-
-
Education
-
WELDING GREEK INSTITUTE
International welding Engineer, Welding Engineering Technology/Technician -
Technological Educational Institute of Central Macedonia
Civil Engineering Direction, Civil Engineering