Mehdi Shirazi

Control Systems Engineer at BRS Electrical
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Brisbane Area, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Distributed Control System SIMATIC PCS 7 - Siemens Global (II)
    Iran Technical & Vocational Training Organization
    Oct, 2017
    - Oct, 2024
  • SIEMENS PLC400 & Fail-Safe system
    Iran Technical & Vocational Training Organization
    May, 2017
    - Oct, 2024
  • Introduction to Measurement and Calibration
    Andazeh Negasht co.
    Jan, 2017
    - Oct, 2024
  • Pressure Measurement and Calibration
    Andezeh Negasht co.
    Jan, 2017
    - Oct, 2024
  • Distributed Control System SIMATIC PCS 7 - Siemens Global (I)
    Iran Technical & Vocational Training Organization
    Dec, 2016
    - Oct, 2024
  • Profibus network
    Iran Technical & Vocational Training Organization
    Nov, 2016
    - Oct, 2024
  • Introduction to SIMATIC WINCC
    ‎‏‎‏‎‏ KianControl Engineering Co.
    Jul, 2015
    - Oct, 2024
  • Intermediate Programming of PLCS - PLC222
    Festo
    Nov, 2011
    - Oct, 2024
  • basic Programming of PLCS - PLC211
    Festo
    Sep, 2011
    - Oct, 2024

Experience

    • Australia
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Control Systems Engineer
      • Jan 2023 - Present
    • Venezuela
    • Renewable Energy Semiconductor Manufacturing
    • Telecommunication Project Planner
      • Oct 2022 - Jan 2023

      FIBCO is an experienced Australian Telecommunications carrier specialising in designing, constructing, operating, and maintaining Fibre-to-the-Premises (FTTP) network solutions for new residential and business developments. http://fibco.com.au/ As a Project Planner, I am responsible for working on Carrier networks in particular within the Telstra and NBN Networks. My core responsibilities involved planning, reporting, and monitoring complex projects and portfolios by applying Microsoft Project, and Primavera (P6). My accountability:  Identifying, planning, and analysing project stakeholders' needs and expectations to effectively engage stakeholders in the project decisions and executions by using the power-interest matrix, salience model, and stakeholder cube.  Communicate/report on scheduled work changes or to Field Supervisor.  Planning for team daily work tasks.  Reading and understanding of plans and telecommunication drawings.  Completion of As-Builts. Show less

    • Iran
    • Oil and Gas
    • 700 & Above Employee
    • Electrical and Control Systems Engineer
      • Mar 2015 - Feb 2022

      Phase 4&5 (Third Refinery)As an Instrument and Control Engineer, I was assigned to work on various projects working closely with a large team of engineers, technicians, and traders reporting directly to the Director of Construction. I have Knowledge and experience in the design, construction, calibration, commissioning, and maintenance of PLCs, DCSs and instrumentation. I can read, understand and implement modifications based on technical documentation such as FDS, P&IDs, Single Line Diagrams, Schematics, Loop Diagrams, and signal lists.KEY RESPONSIBILITIES:1) Installing, configuration, commissioning, and fault finding using SIEMENS control systems (PLCs 300 & 400 series, Siemens Step7 and DCS).2) Medium to large projects’ FAT (Factory Acceptance Test) and SAT (Site Acceptance Test) for Petrochemical, Gas refinery, and Cement plants.3) Highly experience with HMI interface configuration using SIEMENS WinCC Software. 4) Advanced knowledge of programming languages based on IEC 61131 (Ladder, structured text and function block diagram).5) Delivered projects based on customer’s design input documents including functional design specifications (FDS), P&IDs, Single Line Diagrams, Schematics, Loop Diagrams, etc.6) Hands on experience with Instrumentation including calibration, testing, commissioning, and fault finding.7) Advanced computer skills with AutoCAD Electrical, MS Office (Outlook, Excel, PowerPoint & Word), Antivirus (AV), windows OS patching and MS Project.8) Managed and delivered plant life cycle tasks by performing on-demand, periodic and overhaul maintenance in a timely fashion.9) A team player with the attitude of knowledge sharing and mentoring less experienced engineers.10) Communicated positively and effectively with a vast range of stakeholders including subcontractors and customers. Show less

    • Instrumentation and Control System Engineer
      • Feb 2011 - Feb 2015

      Phase 6&7&8 ( Fourth Refinery)KEY RESPONSIBILITIES:1) Installed, tested, and commissioned the programmable logic controllers (SIEMENS PLCs).2) Performed management of change (MoC) and accurately logged modifications. 3) Providing schedules for preventative maintenance and delivering tasks to maintain critical systems controlled by Simatic PCS7, Step 7, and WinCC.inCC.4) Performed Siemens plc S7 programming, instrumentation installation and commissioning to add a new Ethanol loading arm to the plant-distributed control systems.5) Planned plant overhaul activities and delivered tasks including PLC/DCS modifications scheduled for the overhaul period, calibrating instrument devices and coordinating between different work disciplines.6) Prepare instrument and control system panel design specifications and evaluated vendors to ensure the quality of procurement.7) Worked in Hazardous areas and adhered to IP15 requirements through JSA/SWMS.8) Performed diagnostics and root cause analysis in the field of control systems and instrumentation to evaluate malfunctions.9) PLCs power supply and low voltage feeders’ troubleshooting and maintenance.10) Read and interpret technical manuals, drawings, Piping and Instrumentation Diagrams (P&ID), and schematics to make accurate repair decisions.11) Completed inspections and diagnostic procedures to identify problems and optimal resolutions.12) Solid experience with on-time projects delivery within the allocated budget and quality metrics resulting in high customer satisfaction Show less

    • Instrumentation and Control Engineer
      • Oct 2009 - Jan 2011

      1) Prepared, installed, and set up the electrical and Instrument equipment for the stone crushing unit. 2) Performed the launch of STACKER and RECLAIMER and Software bug fixing of their units 3) Raw material department Siemens PLC’s program test and commissioning. 4) Launching PLC panels for Kiln burner, calciner burner, Grate cooler, and HOT-GAS. 5) Performed troubleshooting using P&ID system diagrams and electrical schematics. 6) Prepared workshop daily technical report to support the Quality Control (QC) requirements. 7) Maintenance of electrical Instruments systems in the first three months of the plant's operation and troubleshooting. 8) Scheduled and oversaw preventive maintenance plans, verifying proper operational parameters. 9) Constructed and tested electronic circuits and installed point-to-point wire harnesses and connectors. 10) Collaborated with mechanical engineers to resolve product development and maintenance issues. Show less

Education

  • Azad University (IAU)
    Bachelor's degree, Electrical Engineering
    2001 - 2006

Community

You need to have a working account to view this content. Click here to join now