mehdi safaeifar

Professional Freelancer in Water & Wastewater & Water Desalination Treatment (Process & Management) at Free Lance
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Iran, IR
Languages
  • English Full professional proficiency
  • Azerbaijani Native or bilingual proficiency
  • Farsi Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Photography
    • 700 & Above Employee
    • Professional Freelancer in Water & Wastewater & Water Desalination Treatment (Process & Management)
      • Apr 2018 - Present

    • Engineering Manager
      • Oct 2016 - Apr 2018

      As Engineering Manager, responsible for Detailed Design & Process Review, Supervision on Construction, Progress Control, Implementation of Integration Management & Coordination between Suppliers, Phasing and Planning of Project.Bardsir Roll Milling Steel Co. EPC Contract in Make-Up Water With RO Technology For cooling Tower (110 m3/hr) Bardsir Roll Milling Steel Co EPC Contract in Wastewater Reuse with Scale Pit & Sedimention & Auto Back wash Process ( 47000 m3/day) Sangan Reduction & Pelletizing Steel Plant. EPC Contract in Make-Up Water With RO Technology For cooling Tower (80 m3/hr) Shadegan Direct Reduction & Steel Making Factory ,EPC Contract in Wastewater & Blow Down Reuse With DAF, Softening, UF & ROTechnology ( 285 m3/hr) Sabzevar Direct Reduction Plant ,EPC Contract in Wastewater & Blow Down Reuse With DAF, Softening, UF & RO Technology ( 285 m3/hr)

    • Project Engineer/ Deputy of Project Manager
      • Mar 2014 - Oct 2016

      Modules No. 7 & No. 8 of Wastewater Treatment Plant of Tehran City Using D.B.F Method Project Capacity: 1,200,000 People (250,000 CMD)Zharf Kare Jam Scope of Work (As Contractor):Finance, Design, Supply, Manufacture,Installation, Testing and Commissioning, Operation in Guarantee Period, and Training Employers’ PersonnelMy main responsibility as project engineer is to coordinate so that engineering tasks arestrictly carried out in compliance with the company policies, contract requirements, recognizedengineering practices, project specs, standards and procedures and, in particular, to assist projectmanager in all respects and acts in his absence.Also, as engineer Manager responsible for Detailed Design & Process Review, Supervision on Construction, Progress Control, Implementation of Integration Management & Coordination between Suppliers, Finance Management, Phasing and Planning of Project. Project Description:Tehran Wastewater Treatment Project, Modules 7 & 8, Tehran- Iran- Construction of new wastewater & sewerage treatment plant in south of Tehran where, all sewerage collection networks meet. Tehran Treatment Plant consists of 8 parallel modules which provides services for a 9 million population. Modules 7 & 8 are in scope of Zharfkare Jam EC which, is engaged as EPC contractor.

    • Design Leader/ Resident Engineer
      • Mar 2010 - Mar 2014

      As Design Team Leader & Resident Engineer, for design & supervision on above Water & Wastewater Treatment Projects, responsible for Proposal preparation, Estimation, BOQ & Costs, Detailed Design of Process & Control documents & drawings and supervision on construction of Water & Wastewater Treatment plants.Project Description: Marivan Water Treatment Project, Marivan, Kurdistan Province, Iran- Construction of Water treatment plant in city of Marivan in far west of Iran. Conventional process technology was applied in the project to treat the drinking waters with a capacity of 98,000 m3/day.  Kamyaran Municipal Sewage Treatment Plant Project, Kamyaran, Kordestan Province, Iran- Construction of wastewater treatment plant in city of Kamyaran in west of Iran. The treatment process was based on Biological Nitrogen Removal method (MLE) with a capacity of 20,000 m3/day.  Minab Municipal Sewage Treatment Plant Project, Minab, Hormozgan Province, Iran- Construction of municipally wastewater treatment plant in city of Minab in south of Iran. The treatment process was based on Biological Nitrogen Removal method (MLE) with a capacity of 16,000 m3/day to apply on the municipal sewage & grey water collected by sewer network.

    • Design Engineer/ Resident Engineer
      • Nov 2008 - Mar 2010

      As a Design Engineer, responsible for detailed design of process documents & drawings (PFD, P&ID & Hydraulic Calc.) for wastewater disposal unit which, consisted on oily waste, sanitary and storm water. After start of construction, as a Resident Engineer, responsible for supervision on Construction of wastewater treatment plant unit in Bandar Abbas Gas Condensate Refinery Project.Project Description: Bandar Abbas Gas condensate refinery is located in Bandar Abbas, South of Iran, Persian Gulf Star Bandar Abbas Refinery is a Greenfield Condensate Splitter that is being constructed to utilize Iran's abundant natural gas condensates and produce much needed gasoline. The refinery will be operated with South Pars Stabilized Condensate to be received from Assaluyeh which is about 400 KM from the refinery.

    • Process Engineer/ Site Engineer
      • Jan 2003 - Oct 2008

      As a Design Engineer, responsible for detailed design of process documents & drawings and design of wastewater treatment unit. After start of construction, as a full time Site Engineer, responsible for Construction of wastewater treatment plant & relevant U/G pipelines networks.Projects Description: Altymor Wastewater Treatment Project, Mashad, Khorasan Province, Iran- Detail Design & Construction of wastewater treatment plant in Mashad, capital of Khorasan Province located in northeast of Iran. The treatment process was based on Biological Nitrogen & Phosphor Removal method (A2O) with a capacity of 87,000 m3/day.  Khin Arab Village Wastewater Treatment Project, Mashad, Khorasan Province, Iran- Detail Design & Construction of wastewater treatment plant in Mashad, capital of Khorasan Province located in northeast of Iran. The treatment plant was designed with Sequencing Batch Reactor (SBR) to provide services with a capacity of 97,000 m3/day.  Karadj Wastewater Treatment Project, Karadj, Alborz Province, Iran- Detail Design & Construction of wastewater treatment plant in two districts of Karadj, capital of Alborz Province located next to Tehran. The treatment process was based on Biological Nitrogen & Phosphor Removal method (A2O) with a capacity of 64,000 m3/day.

    • Process Engineer
      • Mar 2000 - Dec 2002

       As a part time Process Engineer, responsible for Hydraulic Design Calc. & Technical reports, PFD & P&ID drawings, Mass Balance Calculations and Quantity Surveying for design of wastewater treatment unit. Projects Description: Natanz Water Treatment Project, Phase II, Khashan, Isfahan Province, Iran- Detail Design & Construction of the second phase of water treatment plant in Kashan, located in center of Iran. The treatment was based on desalination process (RO) & ION exchange with a capacity of 10,000 m3/day.  Kashan Water Treatment Project, Phase II, Khashan, Isfahan Province, Iran- Detail Design & Construction of the second phase of water treatment plant in Kashan, located in center of Iran. The treatment was based on Pulsation System with a capacity of 170,000 m3/day.  Karaj Water Treatment Project, Phase II, Karaj, Tehran Province, Iran- Detail Design & Construction of the second phase of water treatment plant in Kashan, located in center of Iran. The treatment was based on Pulsation System with a capacity of 90,000 m3/day.

Education

  • University of Tehran
    Master's degree, Enviromental Eng.
    2002 - 2005
  • Power & Water Insustrial University
    Bachelor of Applied Science (B.A.Sc.), Water and Wastwater Enginnering
    1998 - 2002

Community

You need to have a working account to view this content. Click here to join now