Compressors and refrigeration cycle
SiemensSep, 2016- Sep, 2024 -
DCS & ESD System under YOKOGAWA Company
YokogawaJul, 2008- Sep, 2024 -
Start up and operation VCM / EDC plant
Mitsui E&P USA LLCMar, 2008- Sep, 2024 -
Petrochemical’s equipment and operation
Rahavaran FonoonSep, 2007- Sep, 2024 -
HYSYS process design
Tehran Institute of TechnologyMar, 2006- Sep, 2024
Experience
-
Oil Industries’ Commissioning and Operation Company (OICO)
-
Iran
-
Oil and Gas
-
700 & Above Employee
-
Production Manager
-
Aug 2017 - Present
Manage operation and maintenance for Electrical power plant, Field Surface Facilities, Centeral process Facilities75000 bbl/ day oil production
-
-
Commissioning and start up manager
-
Oct 2016 - Aug 2017
POGC’s management contracting (MC) for com. and start upFollow up mechanical completion, witness com. and start up activities, consultant, planning and project control, check operation and maintenance condition...
-
-
Operation and start up manager
-
Jun 2015 - Oct 2016
-
-
- The head of process units
-
May 2014 - Jun 2015
- Dry / Wet Commissioning activity (leak test, Degreasing , chemical wash , chemical loading , box-up equipment , furnace dry out ,function test, ESD test , Fire & Gas test , ……- Pre start-up and prepration ( complete pre start-up log , write and check the procedue SOP , Manage and organization the staff , OTP , coordinate the other department , …. )- Initial Start-up and operation (sluge catcher , Gas sweeting , dehydration , ethan recovery . Export gas , Flares & GAS line Interconection , … ) Show less
-
-
-
OIEC Group
-
Iran
-
Oil and Gas
-
700 & Above Employee
-
Daily supervisor
-
Jun 2012 - May 2014
. pre-commissioning & commissioning & initial startup Process and utility plant (Reception facilities , Gas Sweetening , propane refrigeration , NGL recovery and Fractionation , LPG storage and vapour recovery Dehydration, GTG, Boiler, N2 Package, Desalination Package …) Show less
-
-
-
Petroiran Development Company
-
Iran
-
Oil and Gas
-
100 - 200 Employee
-
Control room board chief
-
May 2010 - Jun 2012
. Pre-comm. & comm. Startup process platform & Utility system & Pipeline platform (wellhead, dehydration (Glycol package ), methanol package, water treatment…) . Pre-comm. & comm. Startup process platform & Utility system & Pipeline platform (wellhead, dehydration (Glycol package ), methanol package, water treatment…)
-
-
-
-
. Control room board operator
-
Dec 2006 - May 2010
. Construction works ( Installation , punch ,reinstatement of instrument , Piping & equipment) Pre-commissioning & commissioning works (Leak test, water operation, Writing sop & performing, EDC Drying , Initial start -up ) . Construction works ( Installation , punch ,reinstatement of instrument , Piping & equipment) Pre-commissioning & commissioning works (Leak test, water operation, Writing sop & performing, EDC Drying , Initial start -up )
-
-