Mehdi LAROUSSI

Airline pilot student - Cadet CAE/easyJet at CAE Inc
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Bordeaux, Nouvelle-Aquitaine, France, FR
Languages
  • French Native or bilingual proficiency
  • English Full professional proficiency
  • Spanish Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Canada
    • Aviation and Aerospace Component Manufacturing
    • 700 & Above Employee
    • Airline pilot student - Cadet CAE/easyJet
      • Feb 2023 - Present

      CAE/easyJet MPL Programme CAE/easyJet MPL Programme

    • France
    • Appliances, Electrical, and Electronics Manufacturing
    • 700 & Above Employee
    • Senior Industrial Gigafactory Manager
      • Jun 2021 - Jan 2023

      Senior Project Manager on Billy-Berclau Douvrin Gigafactory : - In charge of design & manufacturing phases on "mechanical" scope (Notching/Stacking/Cell Assembly/Baking/Filling) - Optimized installation of the different equipment, more than 30 machines and belt conveyor systems, in the Gigafactory layout - Management of Chinese and French suppliers - 150M€ budget for the 1st Gigafactory block, equivalent to 15GWh Senior Project Manager on Billy-Berclau Douvrin Gigafactory : - In charge of design & manufacturing phases on "mechanical" scope (Notching/Stacking/Cell Assembly/Baking/Filling) - Optimized installation of the different equipment, more than 30 machines and belt conveyor systems, in the Gigafactory layout - Management of Chinese and French suppliers - 150M€ budget for the 1st Gigafactory block, equivalent to 15GWh

    • France
    • Motor Vehicle Manufacturing
    • 700 & Above Employee
    • Trim & Chassis Senior Project Manager
      • Apr 2017 - May 2021

      Senior Project Manager on B98 project (Renault CLIO IV), industrialized in Oran plant - ALGERIA. In charge of Final Assembly scope :- Management of a €5 million budget to increase the plant production capacity, from 7 to 12jph- Official commissioning of a new robotic gluing cell (windshield & rear window) in order to improve the vehicle quality and increase the production speed- Leader of a 10 person team based in Oran- Weekly reporting, through summary indicators (KPI), of project progress. Weekly meeting with the Program Director and Oran plant Director to present these indicators.- Management of project drifts and deployment of adapted action plans to minimize QCD impacts- Support the plant team during the production ramp-up starting from April 2018 (official launch of the vehicle in Algeria) Show less

    • Trim & Chassis Senior Project Manager
      • Sep 2015 - Mar 2017

      Senior Project Manager on HHA project (Renault KAPTUR), industrialized in Chennai RENAULT-NISSAN Alliance plant - INDIA. In charge of Final Assembly scope :- Lean Manufacturing setting-up in Chennai plant in order to eliminate waste and increase productivity- Management of a €2 million budget to adapt the existing Trim & Chassis line to new HHA vehicle- Key player in negotiations and selection of the suppliers with the Purchasing Department- Leader of a 10 person team based in Chennai- Technical coordination of Product/Process Indian teams for the purpose of meeting the schedule and the quality requirements Show less

    • France
    • Motor Vehicle Manufacturing
    • 700 & Above Employee
    • Stamping Senior Project Manager
      • Sep 2012 - Jul 2015

      Senior Project Manager on HFE project (Renault KADJAR), industrialized in Valladolid and Palencia plants – SPAIN. In charge of QCD (Quality, Cost, Delivery) of all the body parts of the vehicle : - Management of a €34 million budget in order to subcontract the development of the stamping tools in Europe (Romania & Turkey) and Asia (China, Japan & South Korea) - Leader of a 15 person team for the technical/commercial management of the suppliers - Schedule management and meeting of all the milestones. Cost optimization while preserving parts quality. - Industrialization in Valladolid and Palencia plants, from June 2014 to July 2015. Reliability and production ramp-up until series production. Show less

    • France
    • Motor Vehicle Manufacturing
    • 700 & Above Employee
    • Stamping Junior Project Manager
      • Oct 2009 - Jul 2012

      Junior Project Manager on J92/KF67 projects (Dacia LODGY & Dacia DOKKER), industrialized in Tangiers greenfield plant - MOROCCO. In charge of QCD (Quality, Cost, Delivery) of closure body parts :- Management of the upstream phase and feasibility studies, in cooperation with the Design Department and our suppliers (based in Spain & Romania) in charge of stamping tools development- Management of stamping tools manufacturing and reliability through frequent business trips (European and Asian subcontractors). - Management of the industrialization in Tangiers plant, from July 2011 to July 2012. Reliability and production ramp-up until manufacturing agreement and vehicle launch.- Leader of a 4 person team. Regular reporting on progress. Show less

    • Numerical Simulation Leader
      • May 2004 - Sep 2009

      Different job positions occupied within RENAULT Stamping Department :- Stamping numerical simulation, technical leader of Autoform and PamStamp 2G softwares- Setting-up and technical training of RENAULT international Engineering Departments, located in South Korea, India, Romania & Russia

Education

  • MINES ParisTech
    Doctor of Philosophy (PhD), Computational Mechanics
    2000 - 2003
  • Institut national des Sciences appliquées de Toulouse
    Master of Engineering (MEng), Mathematical and Modeling Engineering
    1995 - 2000
  • Lyautey High School - Casablanca (MOROCCO)
    Baccalaureate, Science
    1988 - 1995
  • TOEIC
    Score 960

Community

You need to have a working account to view this content. Click here to join now