Mehdi LAROUSSI
Airline pilot student - Cadet CAE/easyJet at CAE Inc- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
French Native or bilingual proficiency
-
English Full professional proficiency
-
Spanish Limited working proficiency
Topline Score
Bio
Experience
-
CAE
-
Canada
-
Aviation and Aerospace Component Manufacturing
-
700 & Above Employee
-
Airline pilot student - Cadet CAE/easyJet
-
Feb 2023 - Present
CAE/easyJet MPL Programme CAE/easyJet MPL Programme
-
-
-
ACC - Automotive Cells Company
-
France
-
Appliances, Electrical, and Electronics Manufacturing
-
700 & Above Employee
-
Senior Industrial Gigafactory Manager
-
Jun 2021 - Jan 2023
Senior Project Manager on Billy-Berclau Douvrin Gigafactory : - In charge of design & manufacturing phases on "mechanical" scope (Notching/Stacking/Cell Assembly/Baking/Filling) - Optimized installation of the different equipment, more than 30 machines and belt conveyor systems, in the Gigafactory layout - Management of Chinese and French suppliers - 150M€ budget for the 1st Gigafactory block, equivalent to 15GWh Senior Project Manager on Billy-Berclau Douvrin Gigafactory : - In charge of design & manufacturing phases on "mechanical" scope (Notching/Stacking/Cell Assembly/Baking/Filling) - Optimized installation of the different equipment, more than 30 machines and belt conveyor systems, in the Gigafactory layout - Management of Chinese and French suppliers - 150M€ budget for the 1st Gigafactory block, equivalent to 15GWh
-
-
-
Renault Group
-
France
-
Motor Vehicle Manufacturing
-
700 & Above Employee
-
Trim & Chassis Senior Project Manager
-
Apr 2017 - May 2021
Senior Project Manager on B98 project (Renault CLIO IV), industrialized in Oran plant - ALGERIA. In charge of Final Assembly scope :- Management of a €5 million budget to increase the plant production capacity, from 7 to 12jph- Official commissioning of a new robotic gluing cell (windshield & rear window) in order to improve the vehicle quality and increase the production speed- Leader of a 10 person team based in Oran- Weekly reporting, through summary indicators (KPI), of project progress. Weekly meeting with the Program Director and Oran plant Director to present these indicators.- Management of project drifts and deployment of adapted action plans to minimize QCD impacts- Support the plant team during the production ramp-up starting from April 2018 (official launch of the vehicle in Algeria) Show less
-
-
Trim & Chassis Senior Project Manager
-
Sep 2015 - Mar 2017
Senior Project Manager on HHA project (Renault KAPTUR), industrialized in Chennai RENAULT-NISSAN Alliance plant - INDIA. In charge of Final Assembly scope :- Lean Manufacturing setting-up in Chennai plant in order to eliminate waste and increase productivity- Management of a €2 million budget to adapt the existing Trim & Chassis line to new HHA vehicle- Key player in negotiations and selection of the suppliers with the Purchasing Department- Leader of a 10 person team based in Chennai- Technical coordination of Product/Process Indian teams for the purpose of meeting the schedule and the quality requirements Show less
-
-
-
Renault Group
-
France
-
Motor Vehicle Manufacturing
-
700 & Above Employee
-
Stamping Senior Project Manager
-
Sep 2012 - Jul 2015
Senior Project Manager on HFE project (Renault KADJAR), industrialized in Valladolid and Palencia plants – SPAIN. In charge of QCD (Quality, Cost, Delivery) of all the body parts of the vehicle : - Management of a €34 million budget in order to subcontract the development of the stamping tools in Europe (Romania & Turkey) and Asia (China, Japan & South Korea) - Leader of a 15 person team for the technical/commercial management of the suppliers - Schedule management and meeting of all the milestones. Cost optimization while preserving parts quality. - Industrialization in Valladolid and Palencia plants, from June 2014 to July 2015. Reliability and production ramp-up until series production. Show less
-
-
-
Renault Group
-
France
-
Motor Vehicle Manufacturing
-
700 & Above Employee
-
Stamping Junior Project Manager
-
Oct 2009 - Jul 2012
Junior Project Manager on J92/KF67 projects (Dacia LODGY & Dacia DOKKER), industrialized in Tangiers greenfield plant - MOROCCO. In charge of QCD (Quality, Cost, Delivery) of closure body parts :- Management of the upstream phase and feasibility studies, in cooperation with the Design Department and our suppliers (based in Spain & Romania) in charge of stamping tools development- Management of stamping tools manufacturing and reliability through frequent business trips (European and Asian subcontractors). - Management of the industrialization in Tangiers plant, from July 2011 to July 2012. Reliability and production ramp-up until manufacturing agreement and vehicle launch.- Leader of a 4 person team. Regular reporting on progress. Show less
-
-
Numerical Simulation Leader
-
May 2004 - Sep 2009
Different job positions occupied within RENAULT Stamping Department :- Stamping numerical simulation, technical leader of Autoform and PamStamp 2G softwares- Setting-up and technical training of RENAULT international Engineering Departments, located in South Korea, India, Romania & Russia
-
-
Education
-
MINES ParisTech
Doctor of Philosophy (PhD), Computational Mechanics -
Institut national des Sciences appliquées de Toulouse
Master of Engineering (MEng), Mathematical and Modeling Engineering -
Lyautey High School - Casablanca (MOROCCO)
Baccalaureate, Science -
TOEIC
Score 960