Md Selim Hosen

Senior IE Officer at Keya Cosmetics Ltd.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
BD

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Dress Making
    Youth Training Center BGMEA Rangpur
    Jan, 2018
    - Oct, 2024
  • Computer Basic Application
    City Computer Training Center Rangpur
    Jan, 2017
    - Oct, 2024

Experience

    • Personal Care Product Manufacturing
    • 1 - 100 Employee
    • Senior IE Officer
      • Sep 2021 - Present

      1) GPRO & BTAL software specialist. 2) Time study, Motion study, SMV & Efficiency Calculation. 3) Taking the capacity study of full line and line balancing. 4) Analysis as a side of quality and quantity. 5) Follow up the low performing operators. 6) Operator breakdown, operation bulletin. 7) Plan wise sewing line input follow up. 8) Tag missing report check. 9) Train up production people for line target and line efficiency. 10) Non-productive time (loss time) record and reduce. 11) Manpower budget planning sewing and finishing. 12) GPRO production board follow up. 13) Co-ordination with Q.I. & Quality In charge. 14) Announced for sewing, cutting, finishing. 15) Co-ordination with GPRO section. 16) Taking Skill Test for recruiting Operator & Fix-Up Salary. 17) Bottleneck indicates & removes. 18) Preparation Operation Bulletins (T-Shirt, Polo-Shirt, Hoody, Pant & Top-Bottom) Show less

    • United Kingdom
    • Capital Markets
    • IE Executive
      • Apr 2020 - Sep 2021

      ) Capacity Study,Production study. 2) SMV & Efficiency Calculation. 3) Bottle Neck Reduce & line Balancing. 4) Record NPT (Non Productive Time). 5) Follow up the Production & Take Necessary Step for achievement. 6) Operator Motivation & Floor Control. 7) Trained up Supervisor about Efficiency & Productivity. 8) Taking Skill Test for recruiting Operator & Fix-Up Salary. 9) Man Machine report Preparing & Daily Input Output Check. 10) Monitor the Work Floor for maximum utilization of Man & Machine. 11) Preparation Operation Bulletins (T-Shirt, Polo-Shirt,Jacket,Pant) Show less

    • India
    • Design Services
    • Jr IE Executive
      • Sep 2018 - Mar 2019

      1) SMV calculation. 2) Efficiency calculation. 3) Layout monitoring and assessment record. 4) Style change over analysis report. 5) Time study for line balancing. 6) Problem identification and solution. 7) Alter reduction. 8) Nonproductive time (NPT) elocution. 9) Operator motivation and Floor control. 10) Man, machine report preparing. 11) Daily input output check. 1) SMV calculation. 2) Efficiency calculation. 3) Layout monitoring and assessment record. 4) Style change over analysis report. 5) Time study for line balancing. 6) Problem identification and solution. 7) Alter reduction. 8) Nonproductive time (NPT) elocution. 9) Operator motivation and Floor control. 10) Man, machine report preparing. 11) Daily input output check.

Education

  • University of South Asia Bangladesh
    Bsc In Textile, Apparel Manufacturing
    2020 -
  • Rangpur Ideal Institute of Technology
    Diploma, Textile Sciences and Engineering
    2015 - 2019
  • Choto khata Fazil Madrasha
    S.S.C, Science
    2010 - 2015

Community

You need to have a working account to view this content. Click here to join now