National Polymer Group
-
Bangladesh
-
Plastics Manufacturing
-
100 - 200 Employee
-
Deputy General Manager
-
Sep 2022 - Present
-
-
-
Development Design Consultants Ltd. (DDC)
-
Bangladesh
-
Business Consulting and Services
-
300 - 400 Employee
-
Senior Civil Structural Engineer
-
Dec 2019 - Present
Checking Cross-Section, measurement, Bill (Interim Payment Certificate) BOQ, Variation, BBS, Progress report (Financial and Work done) etc. at office. Work Supervision of the construction of Railway Embankment (65 Kilometer), Blanketing layer, Sub-grade layer, Embankment layer, Sand Drainage layer and dredge sand layer etc. Checking for level, compaction test each layer, taking Measurement and ensuring the execution of work as per drawing, design and specification. Abutment & Pier Piling Works 2500mm 1500mm 1000mm & 900mm dia piles with length of 72 meter 56 meter 45meter & 32 meter respectively), Pile Caps (Providing casting pile caps with the volume of 596 cum at a time with the help of Batching Plant), Wing Wall, Abutment & Pier Column, Supervision of Girder erection about 12.93 meter, 15.5 meter, 19.21 meter, 25.28 meter and 31.5 meter Deck type, Semi-through type and through type girder respectively Quality Controls of Works C.C Block Casting, Compaction Test of Railway Embankment, Pre-works Survey, took Measurement, test of materials.Supervise Construction work ensuring compliance of Technical Specifications, Construction Drawings;Provide Technical inputs including interpretation of specifications and drawings for resolving site issues and assist in the progress. Show less
-
-
-
United Group
-
Bangladesh
-
Executive Offices
-
300 - 400 Employee
-
Construction Manager
-
Jul 2017 - Nov 2019
Estimation (R.C.C Structure & cast-in-situ piles, piles cap, basement retaining wall, back filling), Laboratory Test for all Civil Construction Materials, preparation of progress report, Bill (Interim Payment Certificate), prepared As Built Drawing, Prepare Final Payment Certificate (FPC) etc. Supervise the construction at site, on full time basis to ensure quality of workmanship & material, Exercise control over time schedule and implement progress; Exercise control on strict adherence of the construction work to the drawings and specifications and ensure that the standard specification are followed in construction work; Check the construction layout, plans and levels; Conduct and evaluate test as per practice on materials and workmanship, approve/disapprove progressive works as per check list; Prepare cost estimate and bill of quantities, Record authorized deviation from contract drawings; Ensure against the use of inferior materials and workmanship; Record measurements of works which are completed and specifically of works which will be covered up from view or excluded from excess; Assist the Executive director in verifying bills for payment to construction contractors. Show less
-
-
-
BCL Associates Limited
-
Bangladesh
-
Civil Engineering
-
1 - 100 Employee
-
Field Resident Engineer
-
Aug 2014 - Jun 2017
-
-
-
Atlanta Housing Ltd.
-
Gulshan, Dhaka, Bangladesh
-
Assistant General Manager
-
Aug 2004 - Jul 2014
Conducted structural designs of framed structures of high-rise residential buildings by STAAD Pro, ETABS, SAFE, PCA Column and M.S. Excel software; Conducted various type of foundation designs including spread footing, combined footing, mat foundation, RCC pile foundation (both precast and cast-in-place) including pile caps etc.; Prepared working drawings covering site plans, plans, sections and elevations of buildings, beams, columns and slabs and other details in AutoCAD of high-rise buildings; Prepared bill of quantities (BOQ) & Budget for the multistoried buildings using standard Rate Schedule and approved drawings; Conducted the site survey and prepared Site Plans, Elevation & Sections for residential buildings; Conducted Structural designs and prepared detail drawings for civil works of high- rise residential buildings; Prepared detailed Cost Estimates for residential buildings using Standard Rate Schedule; Top supervision of construction works of apartment buildings; Show less
-
-
-
Al Shawamekh Building Contracting L.L.C
-
Ajman, United Arab Emirates
-
Senior Civil Engineer
-
Oct 2006 - Jul 2008
Estimation various type of work item quantity and responsible for the supervision and execution of various building projects and quality control and safety precaution of the working team; Preparation of bill of quantities of the projects and preparation the cost of estimates; Handling projects like villas, residential buildings and industrial shed; Monitoring day to day field work and Liaison with office administration and consultant;Tiles work, Mosaic Work, Painting works, Water supply & sanitation system, over all types modern facilities were presented their & all of these were completed by me; To coordinate with the Municipality, & also to the Consultant; Maintain the subcontractors to complete the projects in due time; Make solution at the sites about Design Drawings and Specifications;Ensure that contractor has all required tools & equipment on site to perform the required construction works at each stage of the project prior to commencing works; Show less
-
-
-
Development Design Consultants Ltd. (DDC)
-
Bangladesh
-
Business Consulting and Services
-
300 - 400 Employee
-
Junior Engineer
-
May 2005 - Sep 2006
Supervised the construction works and quality control; Supervised and monitor the performance of the contractor’s engineer; Certified bill (Interim payment certificate): Assisted Quantity Surveyor and survey and summarize monthly progress quantities;Arranged survey team for verifying the contractor’s survey;Co-operate Laboratory Technicians for their inspections and test;Monitored and reported safety and environmental taken by contractor at sites;Progress monitored and reported to resident engineer;Other duties as assigned by the resident engineer; Show less
-
-
Assistant Engineer
-
Mar 2004 - Apr 2005
Conducted engineering survey of road; Checked MB;Supervised of Earthen road, Culvert, Flood protection work, School buildings, deep tube well, Arsenic test, Tube well and any quality control of works and material through laboratory test specifications to the contractors taking measurement of works done by the contractor;
-
-
Education
-
Rajshahi University of Engineering & Technology
Bachelor of Engineering - BE, Civil Engineering