Md. Raisul Islam Himal

Quantity Surveyor at BCL Associates Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Dhaka, Bangladesh, BD
Languages
  • English (US) Professional working proficiency
  • Bangla Native or bilingual proficiency
  • Hindi Elementary proficiency
  • English (UK) Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Course on Project Management
    Bangladesh Association of Construction Industry
    Oct, 2018
    - Nov, 2024
  • 7th BANGLADESH & 4th SAARC JAMBOREE
    Bangladesh Scouts
    Dec, 2003
    - Nov, 2024
  • First Aid Training & Anti-Drug School Program
    dmcVoice and The Daily Prothom Alo
    Jul, 2003
    - Nov, 2024
  • Pioneering Competition and Quiz Competition 2003
    Crystal Open Scouts
    Apr, 2003
    - Nov, 2024
  • 1st Pioneering Competition 2002
    Crystal Open Scouts
    Mar, 2002
    - Nov, 2024
  • 44th world Jamboree on the Air (JOTA)
    Bangladesh Scouts
    Oct, 2001
    - Nov, 2024

Experience

    • Bangladesh
    • Civil Engineering
    • 1 - 100 Employee
    • Quantity Surveyor
      • Apr 2023 - Present

      ICB No: SASEC- II/ICB/WP05(LOT 1) (69+610 Km To 81+240 Km) Improvement of Road from Elenga to Bangabandhu Bridge (East Side) (13.60km) to a 4 Lane Highway along with Slow Moving Vehicular Traffic (SMVT) Lane & Structures. Total 13.60 km length, WP 05 consist with 8 major bridges, 2 underpass, 10 Culverts along with a Flyover. This Project funded by ADB-OFID-GOV Consulted by KCI-Gauff-Chodai-Soosung-LASA JV, In Association with BCL-BETS, DTCL Philkoie. Contractor is Abdul Monem Limited.

    • Quantity Surveyor
      • Apr 2021 - Mar 2023

      ICB No: SASEC- II/ICB/MP-3/WP10(LOT 1) (76+100 Km To 106+00 Km)Improvement of Road from Mokamtola- Polashbari (29.9km) to a 4 Lane Highway along with Slow Moving Vehicular Traffic (SMVT) Lane on both sides & Structures. Total 29.9km length, WP 10 consist with 4 major bridges, 8 underpass, 32 Culverts along with 1.65km Gobindoganj Flyover. Moreover 22km length to Pavement Quality Concrete (PQC) by Paver and rest of the part Flexible Pavement (Bitumen).This Project funded by ADB-OFID-GOV Consulted by KCI-Gauff-Chodai-Soosung-LASA JV, In Association with BCL-BETS, DTCL Philkoie. Contractor China Construction Seventh Engineering Division Corp. LTDCost: 10.5 Billion BDT (Revised)Activities Performed: Responsible for supervision of constructional works including Preparation, Quantification, Checking and verifications of IPC (Interim Payment Certificates). Preparation of ‘Engineer’s Estimate”, Tender Documents & Contract Documents. Preparation of Revised/Detailed Estimate, Bill of quantity (BoQ), Cost analysis of BoQ Items. Identify Working Scope, Estimate Quantity of Earthworks, Pavement Works, Concrete and Rebar. Rate Analysis of Various Items. Verify Contactor's Claim of Variation & check, Comment on Contractor’s Cost Proposal of Extra Work. Preparation of S-Curve of each contract. Preparation of Daily, Weekly, Monthly Reports of various outgoing Works/Contracts. Attend Pre-tender Meetings, Maintain Liaisons with Project Stakeholders. Show less

    • Bangladesh
    • Business Consulting and Services
    • 300 - 400 Employee
    • Junior Engineer
      • Feb 2021 - Mar 2021

      Joydevpur - Chondra - Tangail - Elenga Road N4Name of assignment or project: South Asia Sub regional Economic Cooperation (SASEC) Road Connectivity Project. Improvement of 18.6km road from Vogra Bypass to Kaliakor for 2-Lane to 4-Lane including Structures (Package No: - SASEC-RCP/ICB/W-01, Lot No-WP-01) funded by ADB-OFID-GOV.Consulted by Kunhwa-KCI-ICT-DDC JV, contractor Kyeryong-Spectra JV.(Ch.0+030 Km To 18+600 Km)Cost: 10.35 billion BDT (Revised)Activities Performed: Responsible for supervision of constructional works including Checking BBS (Bar Bending Schedule). Supervising of Pier, Pier cap, RCC & PC Girder Casting for Flyover. Ensuring the Quality of Mix design for casting Underpass & Rigid Pavement. Supervising construction, repair and maintenance work of sites and premises including structures in the project area. Making report on construction project works and inspecting the maintenance works carried out by the contractor. Show less

    • Junior Engineer
      • Jul 2019 - Jan 2021

      SASEC Road Connectivity Project 1, WP-03Funded by ADB-OFID-GOVClient: Ministry of Road Transport & BridgesConsulted by Kunhwa-KCI-ICT-DDC JVContractor SAMWHAN-MAH JVMain Project Features: Improvement of Road from Dulla mari road to Tangail (36+900 to 59+300 Km, 22.4Km) from 2-Lane to 4-Lane including structures 7 PC Gurder, 2 RC Girder Bridges 5 underpass at local market place. 18 Box Culvert SMVT (Slow Moving Vehicle Track)Cost: 6.78 billion BDT approximateActivities Performed: Responsible for supervision of constructional works including• Preparing BBS (Bar Bending Schedule).• Checking of asphalt design.• Supervising of Pier, Pier cap, Abutment for RCC & PC Bridge Casting.• Ensuring the Quality of Mix design for casting Underpass & Rigid Pavement. • Assuring the quality of ISG (Improved Sub Grade), Sub base, Base (macadam) for National Highway including SMVT (Slow Moving Vehicle Track)• Supervising construction, repair and maintenance work of sites and premises, including structures in the project area.• Supervising bed surface and other lab test. • Making report on construction project works and inspecting the maintenance works carried out by the contractor. Show less

    • Junior Engineer
      • Nov 2016 - Jun 2019

      Consultancy Service for Design & Supervision of RHD Headquarters Complex (13-storied)SASEC Road Connectivity ProjectWP05Location: Tejgaon, Dhaka.Cost: 2 billion BDT apxx.The Proposed RHD Headquarter will have minimum floor area of 30,490 square meter (328,000 square feet) over a land area of around 6.9 hectare located at Tejgaon under Dhaka North Corporation with multi-storied office buildings, landscaping, parking facilities structures for welfare organizations of RHD offices and staff, mosque, cafeteria, lifts etc. The project financed by Govt. of Bangladesh.Responsible for supervision of constructional works including- Over sawing the workflow maintained by contractor.- Assuring the quality of work they have done.- Positively handling the critical issue that occurs during work schedule.- Managing schedule of work to handover the project within notice period.- Assessed with coworker as a team to reach the target in time set by authority. Show less

  • M/S Habib & Co
    • Dhaka, Bangladesh
    • Assistant Engineer
      • Apr 2015 - May 2016

      Assignment: Construction of Chlorine Building (100 no) at PTW compound under DWSSDP Client: DWASA Cost: 21 075 600 BDT Responsible for field support with quality construction to ensure positive customer experiences. To be more caring, reliable, inspiring and friendly with the client to enhance and maintain our promise. Capture customer insights, follow-up and escalate critical issues complaints and provide timely feed back to ensure client satisfaction. To play some intense role in my team and cooperate Project Manager. Responsible for evaluation and assessment activities. Show less

Education

  • Ahsanullah University of Science and Technology
    Engineer’s Degree, Civil Engineering
    2008 - 2014
  • National Ideal School & College
    Higher Secondary Certificate (H.S.C), Science
    2005 - 2007
  • Motijheel Model High School & College
    Secondary School Certificate (S.S.C), Science
    2000 - 2005