Md. Amarat hossion

Sr.Manager at Epic Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Bangladesh, BD

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Hong Kong
    • Retail Apparel and Fashion
    • 700 & Above Employee
    • Sr.Manager
      • Oct 2007 - Present

      Experiences * I started the my career life In adamjee EPZ at initial step ( Setup) now still I am working here. * All utility machinery ,steam line, air line, electrical setup I have done properly. * I am working here unit-1 , Unit-4, unit-5,unit-3, and washing plant as a head Engineering team. * Plans Electrical Projects By Determining Specifications; Selecting Contractors; Establishing Installation Schedules; Planning Shut-Downs And Installations; Integrating Requirements With Architectural And Mechanical Designs; Verifying Code Requirements; Updating Cost Estimates. * Develops Strategic Electrical Plans By Studying Operational Plans; Studying Existing Conditions; Determining Needs To Accomplish Operational Plans; Mapping Solutions; Updating And Modifying Requirements And Solutions; Preparing Cost Estimates And Budgets. * To Plan And Conduct Periodic Overhauls And Required Maintenance Of Electrical Equipment Such As Switch Gears, Substations, Motor Etc. In Accordance With The Recommendations Of The Solar Manufacturers And/or Based On Plant Requirements. * To Supervise the Work Of Electrical & mechanical Maintenance Engineers And Other Technicians. * To Prepare Equipment Failure Reports For Electrical/Solar Panel Manufacturing Plant Equipment. * To Develop, Maintain And Update Maintenance Procedures For All Electrical Panel Manufacturing Plant Equipment. * To Maintain Electrical Systems By Establishing And Enforcing Preventive And On-Going Maintenance, And Testing Programs; Scheduling Repairs; Coordinating Shut-Downs And Installations. * To Maintain Safe And Healthy Work Environment By Establishing, Following, And Enforcing Standards And Procedures; Complying With Codes And Legal Regulations * Facing All Kinds Of Compliance Audits Like As Technical, Electrical & Fire Safety Audit (Alliance, Accord, BV Etc.) And Work Their CAP. To maintain 70 cum ETP plant. Installation testing & commissioning of BMS &EMS plant. Installation of automatic fire sprinkler. Show less

    • Assistant Engineer (Electrical )
      • Dec 2004 - Oct 2007

      Duties/Responsibilities: I engaged the works of installation and erection and maintenance of motor control switch cabinet, local control box, Ball mill speed controller, 609 KW Diesel and 1344 KW gas generator, PLC drive all motor, package chiller, Power cable lay and connection, control cable lay and connection, LT switch gear, Air and NG compressor control system, Different type of Pumps. All kinds of electrical and mechanical machine maintenance and schedule maintain. Duties/Responsibilities: I engaged the works of installation and erection and maintenance of motor control switch cabinet, local control box, Ball mill speed controller, 609 KW Diesel and 1344 KW gas generator, PLC drive all motor, package chiller, Power cable lay and connection, control cable lay and connection, LT switch gear, Air and NG compressor control system, Different type of Pumps. All kinds of electrical and mechanical machine maintenance and schedule maintain.

    • Assistant Engineer( Electrical)
      • Nov 2002 - Nov 2004

      Duties/Responsibilities: I engaged the works of installation and erection and maintenance of motor control switch cabinet, local control box, Ball mill speed controller, reverse osmosis device, water Treatment station, Belt conveyor, Bridge crane, Float rotation crean, Chemical dosing system, Testing & Commissioning of all kinds of electrical equipment’s. Preventive and schedule maintenance all kinds of Machine and electrical device. Duties/Responsibilities: I engaged the works of installation and erection and maintenance of motor control switch cabinet, local control box, Ball mill speed controller, reverse osmosis device, water Treatment station, Belt conveyor, Bridge crane, Float rotation crean, Chemical dosing system, Testing & Commissioning of all kinds of electrical equipment’s. Preventive and schedule maintenance all kinds of Machine and electrical device.

    • Elecrrical Engineer
      • Oct 2001 - Oct 2002

      Duties/Responsibilities: I engaged the works of installation and erection of transformer distribution board, power cable lay and connection, Electrical distribution system and motor testing, Maintenance, Substation and servicing. Duties/Responsibilities: I engaged the works of installation and erection of transformer distribution board, power cable lay and connection, Electrical distribution system and motor testing, Maintenance, Substation and servicing.

  • Gulf foods Ltd
    • Daccope , khulna,
    • Elecrical Engineer & Project in charge.
      • Sep 1995 - Aug 2001

      Duties/Responsibilities: I engaged the works of installation and maintenance 8 KVA, 11 KVA, 200 KVA & 250 KVA Generator Boiler control panel, electric heater, Air and water pipe line, Blower motor, Aerator Motor. Electrical lighting, fry packing and other hatchery work & maintenance all kinds of electrical & mechanical Machinery. Duties/Responsibilities: I engaged the works of installation and maintenance 8 KVA, 11 KVA, 200 KVA & 250 KVA Generator Boiler control panel, electric heater, Air and water pipe line, Blower motor, Aerator Motor. Electrical lighting, fry packing and other hatchery work & maintenance all kinds of electrical & mechanical Machinery.

  • Bangladesh Water Development Board,
    • Ghorashal ,polash, Narshandi
    • Sub Assistant Engineer
      • Jan 1993 - Sep 1995

      Department: Instrument &control , Duties/ Responsibilities: I engaged the works of gate valve distribution center ,Installation and testing of unit control board , impulse pipe line , Battery section ,instrument testing laboratory works, Department: Instrument &control , Duties/ Responsibilities: I engaged the works of gate valve distribution center ,Installation and testing of unit control board , impulse pipe line , Battery section ,instrument testing laboratory works,

Education

  • Atis Dipankar University of Science & Technology
    Engineer’s Degree, Electrical and Electronics Engineering
    2015 - 2017
  • Dhaka Polytechnic Institute
    Associate’s Degree, Electrical ( Diploma)
    1989 - 1992
  • Dhamri Gov. College
    H. S. C, Science
    1987 - 1988
  • Jadabpur B, M High School
    High School, Science
    1981 - 1986

Community

You need to have a working account to view this content. Click here to join now