Maxime MARTIN
Ingénieur qualité at INTERCONTROLE- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Français Native or bilingual proficiency
-
Anglais Native or bilingual proficiency
-
Espagnol Elementary proficiency
Topline Score
Bio
Credentials
-
M1 Risques Mécaniques
-Oct, 2015- Oct, 2024 -
BE Manoeuvre - Opérations spécifiques
-Oct, 2015- Oct, 2024 -
H0 - B0 Travaux non-électriques
-Oct, 2015- Oct, 2024 -
HN1-ME1 Mesures, Essais, Inspection
ApaveOct, 2015- Oct, 2024 -
Radioprotection Réacteur Nucléaire
ApaveOct, 2015- Oct, 2024
Experience
-
INTERCONTROLE
-
France
-
Oil and Gas
-
100 - 200 Employee
-
Ingénieur qualité
-
Dec 2018 - Present
-
-
-
ASYMPTOTE Project Management
-
France
-
Business Consulting and Services
-
100 - 200 Employee
-
Ingénieur projets
-
Oct 2018 - Dec 2018
-
-
Ingénieur projets
-
Oct 2018 - Dec 2018
-
-
-
Framatome
-
France
-
Nuclear Electric Power Generation
-
700 & Above Employee
-
PMO Asymptote
-
Oct 2018 - Dec 2018
PMO contract & supply Asia and France PMO contract & supply Asia and France
-
-
-
Ortec Group
-
France
-
Environmental Services
-
700 & Above Employee
-
ALTEN Quality Engineer
-
Jun 2018 - Sep 2018
-
-
-
ALTEN
-
France
-
IT Services and IT Consulting
-
700 & Above Employee
-
Study Engineer
-
Dec 2016 - Sep 2018
-
-
-
EDF
-
France
-
Real Estate
-
100 - 200 Employee
-
ALTEN PMO
-
Feb 2018 - Jun 2018
Management of a total of 8 projects in the Tricastin Nuclear Power Plant for the Power Plant Direction. In the Post-Fukushima Program, the projects DUS, APu, VRD, and CCL were followed with the change management, the risks of the projects, the budget and the action plans in order to lift the risks. The same was done for the Safety Reinforcement Program with the Dam reinforcement project, PTR bis , EASu, and ASG ND projects.• Project Management: Risk, LEAN management, change management, prioritization of project deliverables and activities, overall project schedule• Following and managing multiple projects and Nuclear Site coordination• Reporting risks and action plans to the Director• Planning, preparing and animate meetings and presentations• Ensure the coordination of the nuclear site Show less
-
-
Project Engineer
-
Sep 2017 - May 2018
The E-DIM Project aim is to ensure that the Nuclear Power Plants are fully aware of the future modifications and start preparing the site in terms of logistic, radioprotection, organization, and regulation, realisation of the modification and exploitation of the site. A folder containing all of the modification with a synthesis has to be done and transferred to the nuclear sites.• Project Management: Risk, LEAN management, prioritization of project deliverables and activities, overall project schedule, Gantt diagrams• Setting up processes and follow-up files in order to plan and prioritize the deliverables• Realisation of synthesis in terms of logistic, radioprotection, regulations, exploitation and environmental impact• Preparing and writing Nuclear Modifications’ folders Show less
-
-
ALTEN Study Engineer
-
May 2017 - Feb 2018
The FCE Project’s goal is to solve the problems that occur in Nuclear Power Plants during constructions and / or modifications. For the project, the power plants in care were the 900MWe power plants (Chinon, Dampierre, Saint-Laurent, Blayais, Cruas, Tricastin and Gravelines) and the team was specialized to solve the Civil Engineering, Electrical and Mechanical problems in less than 5 days per problem.• Project Management: LEAN management, prioritization of project deliverables and activities, schedule• Solving civil engineering problems in the 900MWe French Nuclear Power Plant• Creating a follow-up file in civil engineering• Establishing a feedback• Formation of new engineers Show less
-
-
-
SITES SAS
-
France
-
Civil Engineering
-
200 - 300 Employee
-
Civil Engineer
-
Oct 2015 - Nov 2016
Geophysical and civil engineering surveys in Nuclear Power Plants. Expertises of buildings for preventive maintenance and fire risk. Interventions in the Nuclear Power Plants of Gravelines, Paluel, Flamanville, Nogent-Sur-Seine, Belleville-Sur-Loire, Chinon, Civaux and Cattenom. • Rebar’s’ detection and BORAX boxes’ implantation • Network research for building DUS • Armature reinforcement detection • Wall expertise • Cooling tower’s inspection • Wavelength compensators’ inspection • Expertise of RPE gutters • Fire safety inspections: expertises of fire doors, hoppers and firewalls • Topographic implantation Show less
-
-
-
Groupe CEBTP
-
France
-
Business Consulting and Services
-
Internship: Geophysicist
-
Apr 2014 - Aug 2015
Within the geophysical team, the geophysicist has to acquire electromagnetic, electric, magnetic, seismic or gravitational data on the field. Then those data must be analysed and a report has to be done in order to characterize the environment and the soil. • Cavities research under a fresco classified in the UNESCO’s World Heritage (La Rochelle, France) • Rebar’s detection and civil engineering expertises of a dam’s spillway • Delimitation of a subsidence next to an old tunnel • Geological determination of soils for a hydroelectric power plant • Soil analysis in order to build a departmental road • Determination of wave length velocities for a project of earthquake-resistant construction • Research of dam leak Show less
-
-
-
-
Internship: Geologist Chrono-environment Laboratory
-
Nov 2014 - Dec 2014
The Chrono-environment Project aim to characterize the superficial aquifers above the Cigéo buildings. • Geophysical prospection by electrical resistivity tomography • Piezometric statements and study • Hydrological plotting, gauging and measure of permeability • Water’s chemical analysis • Borehole logging • Discovery of Mount Terri in Switzerland : understanding of the hydrogeological , geochemical and geotechnical characterization of a clay layer in order to bury radioactive wastes Show less
-
-
-
AREVA
-
United Kingdom
-
Advertising Services
-
Internship: Geologist
-
Apr 2013 - Apr 2013
Petrostructural, petrographycal and petrophysical study of the deformation’s bands in carrot for the Imouraren Project in NIGER. • Analyse the chemical properties of the rock sample • Determine the ore type of the uranium • Analyse the carrot with an electronic scanning microscope • Characterise the physical properties of the sample Petrostructural, petrographycal and petrophysical study of the deformation’s bands in carrot for the Imouraren Project in NIGER. • Analyse the chemical properties of the rock sample • Determine the ore type of the uranium • Analyse the carrot with an electronic scanning microscope • Characterise the physical properties of the sample
-
-
-
INERIS
-
France
-
Environmental Services
-
300 - 400 Employee
-
Internship: Risk management in the mining industry
-
Jul 2012 - Aug 2012
Within the INERIS, the project consisted in creating mining hazards maps. • Geotechnical inspection of the Veuve-Clicquot Ponsardin Quarry (Champagne storage quarry) • GIS mapping of quarries and mines Within the INERIS, the project consisted in creating mining hazards maps. • Geotechnical inspection of the Veuve-Clicquot Ponsardin Quarry (Champagne storage quarry) • GIS mapping of quarries and mines
-
-
Education
-
Université de Franche-Comté
Master 2 (M2) Applied Geology, Ingénierie géologique / géophysique -
Université de Franche-Comté
Licence de Géologie Appliquée, Géologie / sciences de la Terre, général -
Ecole Nationale Supérieure de Géologie
BTS de Géologie Appliquée, Géologie / sciences de la Terre, général