Maxime Gaillard
Head of Methods & Planning Department at Entrepose Contracting- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Français Native or bilingual proficiency
-
Anglais Full professional proficiency
Topline Score
Bio
Credentials
-
Sauveteur Secouriste du Travail
APST BTP RPSep, 2015- Nov, 2024
Experience
-
Entrepose Contracting
-
France
-
Oil and Gas
-
100 - 200 Employee
-
Head of Methods & Planning Department
-
Jan 2021 - Present
-
-
Method Manager
-
Nov 2019 - Present
-
-
Method Engineer
-
Apr 2016 - Nov 2019
Within the Methods Department:- Technical support of international contracts.- Establishment of methods of installation and construction.- Implementation of production monitoring tools.- Participation in contracts warranty appeals.- Analysis of dysfunctions and participation in the continuous improvement process.
-
-
Planning and Risk Manager
-
Feb 2013 - Mar 2016
Within the Planning Department:- Development and follow-up of EPC schedules for the Engineering, Procurement and Construction of different project for LNG tanks and CPF.- Project risk management in Engineering, Purchasing, Construction and Commissioning.- Establishment and monitoring of the risk register and the risk model.The project includes:• 4 LNG storage tank: 4 x 160 000 m3
-
-
Project Planning Engineer
-
Jan 2009 - Aug 2014
Within the Planning Department:- Development and follow-up of EPC schedules for the Engineering, Procurement and Construction of different project for LNG tanks and CPF.- Project risk management in Engineering, Purchasing, Construction and Commissioning.
-
-
Site Planning Engineer
-
Dec 2007 - Dec 2008
Construction of 1 LNG Tank 75,300 M3 full containment (9%Ni) 2 LPG Tanks 65,000 M3, 1 Condensate Tank 36,000 M3 and 1 Electrical substation 132 kV with the integration of a new plant power management system- Development, Integration and Follow-Up of construction schedules for an EPCM contract with SHELL as Final Customer and ENTREPOSE DBN as EPCM Team. - In charge to follow, to integrate and to report the construction progress of the equipment: tanks, Nitrogen production unit, air instrumentation unit, electrical substations… Show less
-
-
Site Planning Engineer
-
Sep 2005 - Nov 2007
Development, Integration and Follow-Up of project schedules, progress & reporting for an EPC contract for the MLN Block 405a Expansion project.The project includes:1 NUOVO PIGNONE Gas Turbine package (25MW - FR5) with 2 BCL centrifugal compressors in line.• 1 AKPS dehydration unit (TEG package).• 1 NUOVO PIGNONE Reciprocating Compressor.• Revamping of 2 NUOVO PIGNONE Reciprocating Compressors (Gas capacity increase).• 1 Nitrogen Production Unit.• Complete process packages integration (Air coolers : 16 units - Process drums: 4 units - Fuel Gas skid).• First Total Plant Shutdown: 15 days duration.• Second Total Plant Shutdown: 38 days duration. Show less
-
-
Planning Engineer
-
Sep 2004 - Sep 2005
-
-
Education
-
IUT Ville d'Avray
DUT GMP, Mechanical Engineering