Maulfi Abbas

Advisor at Askpert.id
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Malang, East Java, Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Indonesia
    • IT Services and IT Consulting
    • 1 - 100 Employee
    • Advisor
      • Dec 2022 - Present
    • Construction
    • 200 - 300 Employee
      • Sep 2022 - Present

      • Aug 2021 - Sep 2022

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Facility Representative
      • Nov 2020 - Aug 2021

      Coordinate Engineering Procurement Construction Management (EPCM) resources for construction management activities for all Projects. Ensure assigned EPCM resources are providing the services with EPCM Contract requirements. Involve in Construction Execution Plan (CEP) preparation process; coordinate the field construction activities and resources; ensuring construction completion safely, on schedule and meeting Company’s quality requirements; reporting and overall coordination with stakeholder’s teams (such as Project Team, Operation & Maintenance Team, Business Partners, etc.) Show less

    • Indonesia
    • Geothermal Electric Power Generation
    • 100 - 200 Employee
    • Site Civil Engineer
      • May 2018 - Nov 2020

      1.support site manager and construction manager in completion of secondary works contract (wks) 2. epc engineering design review 3.support site manager and construction manager: a.prepare technical data/documents, ifc drawings, quality controlled. b.support on controlling all related technical documents and communication with external parties. 4. epc construction supervising a.intercommunication with seml site construction team and other related department. b.coordination and communication with epc contractor. c.monitoring/controlling construction activity, engineering and budgeting. 5.personal development objectives: a.personal training, short course and other related training 6.muara laboh geothermal power project, stage 2 development preliminary concept study review engineering concept study and cost estimate, including geo-hazard 7.support the she activities related to the site supervision Show less

    • Fossil Fuel Electric Power Generation
    • 1 - 100 Employee
    • Civil Team Leader
      • Feb 2016 - May 2018

      Engage in applying the parent company values, especially in Quality and Safety, throughout entire KALSEL 1 2 X 100 MW Power Plant Project by evaluating construction methods and identify potential problems as well as giving advice of proper and direct solutions. And also at the same time, maintain organization integrity intact up until the end of the project. Assuring all stakeholders requirements understood and followed to meet the satisfaction by reviewing construction methods, construction material selection, inspection and test plan (ITP) etc. and also by filling the gaps of discrepancies between design and actual by issuing Finding Report, Non-Conformance Report, problem confirmation via email. Maintain all above records orderly and traceable as solid evidence of construction performance. Show less

    • Mining
    • 700 & Above Employee
    • QA/QC Engineer
      • Jun 2013 - Aug 2015

      Proactively seek, drive, and deliver innovative value adding Quality Control (QC) solutions which may include Quality Assurance (QA) to the THIESS Construction Indonesia Business. THIESS Management System and ISO 9001 compliance through audit, training, and awareness. Continually improve the operation and efficiency of QC practices across TCI, and enhance the skills and development of QC staff across the business. Working with Sr. Engineer QA/QC and QAE Manager to deliver a leading edge QC Capability which ensures TCI remains an industry leader capable of providing construction services throughout Indonesia. Show less

    • Japan
    • Construction
    • 700 & Above Employee
    • Civil Supervisor
      • Jun 2012 - May 2013

      As a client Project Management Consultant, supervise (in term of quality and progress) all EPC Contractor construction activities including but not limited to equipment foundation work, permanent drainage, metal cladding installation, steel structures erection, and permanent road paving within the project specification range. During the process, raised a finding report and/or non-conformance report, for the work issue which need detail engineering disposition due to construction issue. As a client Project Management Consultant, supervise (in term of quality and progress) all EPC Contractor construction activities including but not limited to equipment foundation work, permanent drainage, metal cladding installation, steel structures erection, and permanent road paving within the project specification range. During the process, raised a finding report and/or non-conformance report, for the work issue which need detail engineering disposition due to construction issue.

    • United States
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • QC Engineer
      • Sep 2011 - Jun 2012

      Perform best quality practice as per the company's quality policy in the project scope of work of concrete supply and tank erection package by ensuring concrete ingredients have been procured, tested, and mixed at preliminary stage according to both company and client interest. During the process, ensure that concrete request is fulfilled both in quality and time frames by setting up concrete order plan which applied to all contractors and regular test and inspection as per approved inspection and test plan programs Show less

    • Côte d'Ivoire
    • Construction
    • 1 - 100 Employee
    • Civil Engineer
      • Apr 2009 - Aug 2011

      1. Make and get official approval of bar bending schedule for manhole, duct bank and storm water line construction. 2. Make planned schedule for boiler area, electrical room area 3. Supervise the construction of manhole, duct bank, and storm water line also electrical room foundation casting. 4. Make progress evaluation and report it every day at daily meeting. 5. Make a confirmation of verbal instruction and follow it up as variation order. 6. Attend in safety toolbox meeting every day and explain to the workers potential hazards. 7. as an issuing authority at PTW office every day. 8. Make method statement for each work and submit it to owner to get approval. 9. Engineer in chemical lining and FRP lining Application. 10. as an authorized gas tester. Show less

    • Indonesia
    • Construction
    • 300 - 400 Employee
    • Site Office Engineer
      • Feb 2007 - Apr 2009

      1. Make schedule for construction project including rebar installation, formwork installation, and casting concrete / precast concrete. 2. Input the data in company cost control form and submit it to head office cost control. 3. Make site progress and daily report each week and present it at weekly meeting head office. 4. Coordinate with site accountant to make payment for foreman based on actual opname per 2 weeks. 5. Make a method statement for each items of work. 6. Coordinate with subcontractor in weekly meeting regarding obstacle and challenge that may come in the future and provide it with solutions. 7. Make a calculation of work volume structural or architectural based on the drawing for example volume of concrete, re-bar, and form work, ceiling, tile, sanitary, plaster wall etc. 8. Analize each item of work into unit price based to make bidding or quotation to owner or main contractor. 9. Make a presentation in front of board of director before submit it to customer. Show less

Education

  • University of Brawijaya
    Bachelor of Engineering (B.Eng.), Civil Engineering

Community

You need to have a working account to view this content. Click here to join now