Matthieu Fontan
Construction site director at Enfants du Mekong- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
German Limited working proficiency
-
Japanese Elementary proficiency
-
French Native or bilingual proficiency
-
Vietnamese Elementary proficiency
Topline Score
Bio
Experience
-
Enfants du Mekong
-
France
-
Non-profit Organization Management
-
100 - 200 Employee
-
Construction site director
-
Aug 2018 - Present
- On-site management / Project control / technical supervision for the construction of a new Enfants du Mekong campus - budget of 1M$ ; 120 poor children helped- Designed and supervised constructions & refurbishments works on schools in Cambodia
-
-
-
Veolia Water Technologies
-
France
-
Environmental Services
-
700 & Above Employee
-
Project Engineer
-
Mar 2016 - Aug 2018
Assumed Project control and mechanical design responsabilities on Large Water Treatment Construction Projects:Mechanical Engineering:o Sized HVAC solution and steel structure work for the new UV treatment plant project at Méry sur Oise (10M€ - 158 000 m3/d)o Prepared mechanical datasheets and technical specificationso Launched and followed up bidding process with supplierso Completed inspection and quality tests on pipings at vendors factoryo On-site supervisionProjects planning & control:o Established and controled budget of the operation & tendering departmento Prepared schedules on tender phases using Primavera or MSProjecto Implemented engineering schedule for the realization of the primary settling unit of Paris waste water treatment plant (460M€ - 1 500 000 m3/d)
-
-
-
Veolia Water Technologies
-
France
-
Environmental Services
-
700 & Above Employee
-
Project Control Engineer
-
Nov 2014 - Jan 2016
Assisted the Head of Project Control on the SHELL Carmon Creek Project ( 455M$ EPF contract - 36 000 m3/d)o Updated schedule together with packages engineers o Prepared monthly report for Cliento Implemented progress measurement and earned value management methodology, using advanced Excel functionso Developed internal dashboard to report on progress and support management strategieso Cost control on purchase activities
-
-
-
University of Limerick
-
Ireland
-
Higher Education
-
700 & Above Employee
-
Searcher on the MACCSol Project
-
Sep 2013 - Sep 2014
Full year Research Project entitled: "Thermal and Aerodynamic Characterization of a New Air Cooled Condenser for Concentrated Solar Power Plant"Objective: to demonstrate experimentally the impact of the aerodynamic design on the thermal efficiency of the condenser.This included different steps: 1- Literature review on previous similar experiments and on thermodynamics and aerodynamics theories applicable2- Define the relevant experimental tests3- Design and set up the testing facilities4- Complete testings and compare with theory5- Analyse results, summarize in the thesis and presentation
-
-
-
Veolia Water Technologies UK
-
United Kingdom
-
Renewable Energy Semiconductor Manufacturing
-
100 - 200 Employee
-
Project Engineer
-
May 2012 - Sep 2012
VWS Westgarth Ltd. is the water treatment expert in Upstream Oil & Gas. It looks after Tendering, Engineering, Procurement, Commissioning and sub contracts Construction activities.- Updated AUTOCAD drawings- Assisted on field for the refurbishment of a SRP pilot plant- Prepared Material Take Offs- Followed up on shipments
-
-
-
International Paper
-
United States
-
Paper and Forest Product Manufacturing
-
700 & Above Employee
-
Worker
-
Jun 2011 - Jul 2011
-
-
Education
-
ECAM Lyon
Master's Degree, Mechanical, Electrical and Industrial Engineering -
University of Limerick
Master's Degree, Mechanical Engineering