Rayden Engineering Limited
-
United Kingdom
-
Oil and Gas
-
1 - 100 Employee
-
E&I Project Manager GMC Rayden JV
-
Nov 2022 - Present
Kilroot, Northern Ireland, United Kingdom
-
-
-
Barassie Engineering Systems
-
United Kingdom
-
Oil and Gas
-
1 - 100 Employee
-
Managing Director
-
Mar 2020 - Present
Ayr, Scotland, United Kingdom Electrical, Instrumentation & Control site construction and commissioning services Hazardous Area ATEX Inspections Bespoke workshop for strategic offsite fabrication and build of Control and Switchear Packages, Kiosks and Panel manufacture Design support Project Planning, Management and Controls
-
-
-
BARASSIE LIMITED
-
United Kingdom
-
Retail Office Equipment
-
Managing Director
-
Jan 2009 - Present
Ayr, Scotland, United Kingdom
-
-
-
SGN
-
United Kingdom
-
Utilities
-
700 & Above Employee
-
Gas to the West E&I Project Manager
-
Jul 2017 - Sep 2022
Glasgow, United Kingdom Gas to the West project
-
-
-
Northern Gas Networks
-
United Kingdom
-
Utilities
-
500 - 600 Employee
-
E/C/I Project Engineer
-
Jan 2013 - Jul 2017
Leeds, United Kingdom In this role I am working as part of the Northern Gas Networks, Major Projects team, delivering infrastructure upgrade works in accordance with the planned business outputs of NGN RIIO-GD1. Key high level elements of the work include; planning, work scope development, management of subcontractors, project initiation and management with final end user handover. A further breakdown of these is as follows; • Appraisal of tender submissions in terms of technical, financial and execution… Show more In this role I am working as part of the Northern Gas Networks, Major Projects team, delivering infrastructure upgrade works in accordance with the planned business outputs of NGN RIIO-GD1. Key high level elements of the work include; planning, work scope development, management of subcontractors, project initiation and management with final end user handover. A further breakdown of these is as follows; • Appraisal of tender submissions in terms of technical, financial and execution elements; • Design reviews at all stages including project kick off, conceptual / detailed design and close out; • Management of project technical queries, scope amendments and concessions; • Preparations of construction workpacks; • Early Hazard Identification and site works information preparation; • Environmental planning; • Participation in HAZOPs and HAZCONs for projects; • Identification of risk against future projects; • Communication with all divisions of the business including project participation of all key stakeholders such as operations, maintenance and asset integrity. Show less
-
-
-
Dornan
-
Ireland
-
Construction
-
200 - 300 Employee
-
Site Quality & Commissioning Manager
-
Sep 2012 - Jan 2013
Leicester On this project I was managing the QA/QC and Commissioning functions of the M&E package on the DC1 and DC2 Data Centres being built for Santander at Leicester.
-
-
-
Land and Marine Engineering Limited
-
United Kingdom
-
Oil and Gas
-
1 - 100 Employee
-
QA/QC E&I Engineer
-
Aug 2011 - Sep 2012
St Fergus I was working as part of the Project Management Team for the Main Contractor managing the E, C & I disciplines QA/QC responsibilites for both Construction and Commissioning phases. The Project’s overview consists of phasing out existing gas driven compressor units and replacing them with two electrically driven variable speed drive compressor units and associated control and process equipment to transport natural gas to the network. Major aspects integral to the project function are; •… Show more I was working as part of the Project Management Team for the Main Contractor managing the E, C & I disciplines QA/QC responsibilites for both Construction and Commissioning phases. The Project’s overview consists of phasing out existing gas driven compressor units and replacing them with two electrically driven variable speed drive compressor units and associated control and process equipment to transport natural gas to the network. Major aspects integral to the project function are; • Pre-Commissioning / Commissioning sub-system test packages including 132kV Substation, 11kV switchgear and associated protection • DSEAR register tracking and hazardous area / field QC inspection co-ordination • Management of E, C & I subcontractor QA/QC packages and personnel • Compliance with National Grid Transmission standards Show less
-
-
-
-
QA/QC Engineer
-
Apr 2011 - Jul 2011
In this position I was part of the Project Start-up Team working towards bringing back into operation the mothballed steelworks at Redcar, Teesside
-
-
-
-
Electrical and Instrumentation Engineer
-
May 2010 - Dec 2010
In this role I was the Delivery Team Engineer responsible for the delivery of the E&I scope of works for the Ammonia Storage and Loading Project. This project is installing DCS control and FSC shutdown systems and revised instrumentation for controlling an ammonia storage facility and export systems to meet current legislation and BAT. The installation of the DCS and FSC control systems required a new equipment room to be constructed and upgrades carried out to the ammonia export system on… Show more In this role I was the Delivery Team Engineer responsible for the delivery of the E&I scope of works for the Ammonia Storage and Loading Project. This project is installing DCS control and FSC shutdown systems and revised instrumentation for controlling an ammonia storage facility and export systems to meet current legislation and BAT. The installation of the DCS and FSC control systems required a new equipment room to be constructed and upgrades carried out to the ammonia export system on the Jetty 3 head. In my role I am responsible for the planning and estimation of the job task details, management of site resources and completion of all GOC paperwork in accordance with BP guidelines. Show less
-
-
-
-
Electrical, Control & Instrumentation Site QA/QC Engineer
-
Oct 2008 - Mar 2010
On this project I was the QA/QC Engineer responsible for the supervision and implementation of the complete E, C&I scope of works. All works were completed in accordance with the contract inspection and test plans (ITPs), project requirements and specifications, statutory regulations and international directives including ATEX and EMC. This position included but was not limited to supervision and deployment of QC inspectors, labour planning, witness approval of HV/LV cable installation and… Show more On this project I was the QA/QC Engineer responsible for the supervision and implementation of the complete E, C&I scope of works. All works were completed in accordance with the contract inspection and test plans (ITPs), project requirements and specifications, statutory regulations and international directives including ATEX and EMC. This position included but was not limited to supervision and deployment of QC inspectors, labour planning, witness approval of HV/LV cable installation and related construction documentation, site earthing, instrument installation and calibration, loop checks, plus all tagged equipment and hazardous area inspections (MEAPEA). In addition, I was also heavily involved in the management and review of the overall works completions package, piping and fabrication test packs, mechanical equipment installation records, vendor dossiers and manufacturing data books for all disciplines on the project. The continual reporting of QA/QC documentation status to project management and system handover to Ensus were integral functions of my works remit. Show less
-
-
-
-
QA/QC Engineer
-
Jul 2006 - Oct 2008
-
-
-
-
Electrical Engineer
-
Jul 2005 - Jun 2006
-
-
-
-
Electrical and Instrumentation Project Site Engineer
-
Oct 2003 - Jul 2005
-
-
-
-
Electrical Installation Building Supervisor
-
Oct 2001 - Oct 2003
-
-
-
-
Electrical & Mechanical Engineer
-
May 1999 - Oct 2001
-
-
-
-
Engineering Assistant
-
May 1998 - Sep 1998
-
-
-
-
Contract Co-ordinator
-
May 1997 - Sep 1997
-
-
Education
-
Ayr College
HND, Electronic and Electrical, Telecommunications, IT Networking and Hardware -
Marr College, Troon