Matthew Delia

Project Engineer at Rulon International
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
St Augustine, Florida, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Qualified Stormwater Management Inspector
    Fla State Of Fdep
    Aug, 2022
    - Nov, 2024
  • FE/EIT
    NCEES
    Jun, 2019
    - Nov, 2024
  • LEED Green Associate
    General Building Contractors Association (GBCA)
    Jun, 2022
    - Nov, 2024

Experience

    • United States
    • Wholesale Building Materials
    • 1 - 100 Employee
    • Project Engineer
      • Jul 2023 - Present

    • United States
    • Construction
    • 700 & Above Employee
    • Engineer
      • Sep 2021 - Jul 2023

      Managed the completion and turnover of the Johnson & Johnson TAM 29 & TAM 30 Contact Lens Manufacturing Line projects. The scope of these projects include the renovation of an internal manufacturing space, as well as installation of suspended process, electrical, life safety, and mechanical systems. I performed quality control throughout the construction process to ensure that the construction was carried out in accordance with 3rd party design drawings and specifications. This included… Show more Managed the completion and turnover of the Johnson & Johnson TAM 29 & TAM 30 Contact Lens Manufacturing Line projects. The scope of these projects include the renovation of an internal manufacturing space, as well as installation of suspended process, electrical, life safety, and mechanical systems. I performed quality control throughout the construction process to ensure that the construction was carried out in accordance with 3rd party design drawings and specifications. This included verifying tolerances, performing pressure and tensile testing, and validating functionality of equipment. Once installed, I assisted in the integration of these newly installed systems throughout the termination process to make them compatible with the newly installed manufacturing equipment. Additionally, I managed the completion of construction, as well as the entirety of commissioning and start-up process of the Johnson & Johnson Research & Development Deionized Water Expansion project. In this role, I collaborated with the City of Jacksonville Building Department to explain project scope details throughout the building permitting process. To accomplish this, I systematically reviewed construction drawings, specifications, and submittals to identify and rectify conflicts between systems. I was also able to lead in generation & implementation of weekly construction schedules, cost tracking and estimation, and site logistics plans for high-risk activities such as crane picks and excavations.

    • Engineer
      • Jun 2020 - Aug 2021

      Managed the construction of the drywall and general requirements portion of the new White Plains Hospital HOB building in White Plains, NY, a new Verizon Data Center in Windsor, CT, and a new Research and Development building for Pepsi Co. in Valhalla, NY, totaling over $14M in work in place. On these projects, I created material and product submittals in order to meet provided design drawings, specifications, and provisions. These include cold aisle containment systems in order to prevent… Show more Managed the construction of the drywall and general requirements portion of the new White Plains Hospital HOB building in White Plains, NY, a new Verizon Data Center in Windsor, CT, and a new Research and Development building for Pepsi Co. in Valhalla, NY, totaling over $14M in work in place. On these projects, I created material and product submittals in order to meet provided design drawings, specifications, and provisions. These include cold aisle containment systems in order to prevent Verizon data racks from overheating, and suspended ceiling systems to incorporate HVAC, life safety, and electrical systems. For these projects, I identified and carried out through resolution labor, cost, material, and scheduling impacts to accommodate over one thousand design change orders throughout the duration of the projects. In addition, I estimated cost and scheduling concerns associated with the drywall and general requirements portions of a new Sacred Heart University Ice Rink and new Morgan Stanley Executive Suites. In this role, I reviewed 3rd party design documents which incorporated multi-story curtain walls spanning underground, and cantilevered seating and soffit construction to identify mechanical, electrical, and structural conflicts.

    • Field Engineer
      • Jul 2018 - Jun 2020

      Assisted in identifying and rectifying conflicts in the field based on 3rd party design drawings & specifications for multiple projects, including Interventional Radiology operating rooms, IT closet upgrades, Women's Imaging interior renovations, and rooftop air handler unit installation & integration, in order to expedite and meet required project deadlines and milestones. These issues include, but are not limited to re-routing of mechanical, electrical, and plumbing components to avoid… Show more Assisted in identifying and rectifying conflicts in the field based on 3rd party design drawings & specifications for multiple projects, including Interventional Radiology operating rooms, IT closet upgrades, Women's Imaging interior renovations, and rooftop air handler unit installation & integration, in order to expedite and meet required project deadlines and milestones. These issues include, but are not limited to re-routing of mechanical, electrical, and plumbing components to avoid conflict in the field, identifying existing deficiencies with the structural concrete slab of the hospital, and verification and implementation of given fire and smoke rating requirements for wall construction on the job site. In addition to my field experience, in my second year I have also begun reviewing product and material submittals to determine their conformity to the 3rd party design intent. Finally, during construction activities, I had to aid in determining construct-ability issues associated with building in an active hospital. These issues include, but are not limited to infection control practices such as HEPA filtration and coordination between project management teams representing the hospital, the design engineers, and the contracting team.

    • United States
    • Construction
    • 700 & Above Employee
    • Intern
      • Jun 2016 - Jan 2018

      Assisted in construction management of ambulatory surgery division of Norwalk Hospital, including directing daily activities and tracking trade staff production. Assisted in construction management of ambulatory surgery division of Norwalk Hospital, including directing daily activities and tracking trade staff production.

    • United States
    • Hospitals and Health Care
    • 700 & Above Employee
    • Intern
      • Dec 2015 - Jan 2016

      Internship performed during Winter break where I learned the functionality of the equipment within the hospitals boiler & chilled water systems, and aided in construction management of interior hospital renovations. Internship performed during Winter break where I learned the functionality of the equipment within the hospitals boiler & chilled water systems, and aided in construction management of interior hospital renovations.

Education

  • University of Rhode Island
    Bachelor’s Degree, Mechanical Engineering
    2014 - 2018
  • University of Rhode Island
    Associate's degree, Economics
    2014 - 2018

Community

You need to have a working account to view this content. Click here to join now