Masood Khan
Site Engineer at Shahnawaz (Pvt.) Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Shahnawaz Private Limited
-
Pakistan
-
IT Services and IT Consulting
-
1 - 100 Employee
-
Site Engineer
-
Oct 2016 - Present
1.OPERATION & MAINTENANCE OF HVAC EQUIPMENT / SYSTEM 2.OPERATION & MAINTENANCE OF 135 &105 TR WATER COOLED SCREW CHILLERS 3.OPERATION & MAINTENANCE OF HVAC ELECTRICAL & CONTROL SYSTEM. 4.OPERATION & MAINTENANCE OF COOLING TOWERS, AHU's & FC'U’s ETC 4.CHILLED WATER PUMPS (PRIMARY/SECONDARY), CONDENSER WATER PUMPS. 5.MAINTENANCE OF DUCTING & AIR DISTRIBUTION SYSTEM. 6.OPERATION & MAINTENANCE OF BUILDING MANAGEMENT SYSTEM. 7.OPERATION & MAINTENANCE OF VFD (VARIABLE FREQUENCY DEVICE) SYSTEM. 8.MAINTAIN THE LOG SHEETS OF CHILLERS AND OTHER RELATED EQUIPMENT. 9.CARRING OUT PREVENTIVE MAINTENANCE SCHEDULE OF CHILLERS & A.C EQUIPMENT. 10.TO MAKE THE SCHEDULE FOR PERIODIC MAINTENANCE OF HVAC EQUIPMENT 11.MAINTAIN THE LOG SHEETS OF CHILLERS AND OTHER RELATED EQUIPMENT 12.HVAC WORKS INCLUDING INSTALLATION OF DUCTING & AIR DISTRIBUTION 13.GENERATORS, AIR COMPRESSORS, SAFETY VALVES & HEAT EXCHANGERS. 14.ELECTRICAL CONTROL WIRING, CONTROL SYSTEM & ELECT PANELS 15.CHILLED WATER PUMPS (PRIMARY/SECONDARY), CONDENSER WATER PUMPS. 16.PLUMBING WORKS INCLUDING PUMPING STATIONS & CHILLED WATER PIPING. 17.CHILLERS, COOLING TOWERS, AHU’S, FCU’S, PRESSURIZATION UNIT 18.CHECKING OF PIPE LEVELS / STRESS FREE CONNECTIONS AND WELDING JOINTS. 19.CHECKING OF PIPE SCHEDULE & MATERIAL TAKE-OFF ETC 20.INSTALLATION OF BUILDING MANAGEMENT SYSTEM 21.PLUMBING WORKS INCLUDING FIRE FIGHTING SYSTEM 22.INSTALLATION OF VFD & CAV/ VAV (CONSTANT /VARIABLE AIR VOLUME) 23.OPERATION & MAINTENANCE OF DIFFEREN CAPACITIEST OF GENERATORS. 24.INSTALLATION OF CHILLERS, AHU’S, FCU’S, COOLING TOWERS ETC 25.INSTALLATION OF PUMPING STATIONS & CHILLED/HOT WATER PIPING. 26.CHILLED WATER PUMPS (PRIMARY/SECONDARY), CONDENSER WATER PUMPS. 27.CHECKING OF PIPE LEVELS / STRESS FREE CONNECTIONS AND WELDING JOINTS. 28.CHECKING OF PIPE SCHEDULE & MATERIAL TAKE-OFF ETC. Show less
-
-
-
Geco Mechanical & Electrical L.L.C UAE
-
Sharjah Islamic bank & Sharjah university
-
Facility Engineer
-
Aug 2015 - Oct 2016
MEP Service and Maintenance MEP Service and Maintenance
-
-
-
Shahnawaz Engineering (Pvt) LDT Karachi
-
IBA Karachi
-
Site Supervisor
-
Dec 2013 - Aug 2015
Building Operation and Maintenance HVAC and Electrical Building Operation and Maintenance HVAC and Electrical
-
-
-
AAA-RAK Joint venture Karachi, (Project Management Company)
-
MCB (Bank) Head Office Karachi
-
Heating Ventilation Air Conditioning Supervisor
-
Mar 2011 - Dec 2013
HVAC Supervisor HVAC Supervisor
-
-
-
Adnan Asdar Associates Karachi, (Project Management Company)
-
Faysal Bank Head Office Karachi
-
Heating Ventilation Air Conditioning Supervisor
-
Mar 2010 - Dec 2010
HVAC Supervisor HVAC Supervisor
-
-
-
M/S Season Master (Pvt.) Ltd, Karachi.
-
Serena Hotel Islamabad
-
Heating Ventilation Air Conditioning Supervisor
-
Jan 2009 - Feb 2010
HVAC Supervisor HVAC Supervisor
-
-
-
AAA-RAK Joint venture Karachi, (Project Management Company)
-
MCB (Bank) Head Office Lahore
-
MEP Supervisor
-
Jun 2007 - Jul 2008
MEP Supervisor MEP Supervisor
-
-
Education
-
New Port Institute
Bachelor of Technology - BTech Hons, Mechanical Engineering -
New Port Institute
Bachelor of Technology - BTech, Mechanical Engineering -
Jinnah polytechnic institute
DAE, Refrigeration and Air Conditioning -
Siraj ud daulah college
Intermedia, Pre-Engineering