Mas Amri Qathrunnada

Product Development Consultant at PT Magna Guna Karsa
  • Claim this Profile
Contact Information
Location
ID

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Indonesia
    • Wholesale Building Materials
    • 1 - 100 Employee
    • Product Development Consultant
      • Aug 2021 - Present

      Green products for Architecture & landscape 1. Research for Market Assessments for Go Green Products in Indonesia. 2. Establish Communication with Clients from B2B (Business to Business) to P2P (Person to Person). 3. Responsible for Providing knowledge about the Importance Go Green Products. 4. Responsible for and Monitoring Ongoing Projects. 5. Responsible for developing the business and getting the achievement of sales objectives with the target market. 6. Developing business plan with Customers like Commercial and Personal. 7. Establish effective relationships and collaborations with other departments to address key business issues and opportunities. Show less

    • Indonesia
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Production Supervisor
      • Aug 2020 - Mar 2021

      1. Responsible for the training and performance of members of the production department. 2. Responsible for the quantity and quality of products that achieve the target. 3. Responsible for operational implementation in accordance with procedures. 4. Responsible for the validity of the production data as a whole. 5. Responsible for continuous improvement in accordance with Lean Manufacturing principles. 6. Responsible for implementing OHS procedures in all teams. 7. Responsible for the implementation of 5R activities in the production area. 1. Make a monthly production plan according to the Sales Order given by the sales division before the end of the month. 2. Coordinate with each division or other department if there is a change in production plan (delay or schedule acceleration). 3. Validate the production reports by each Team Leader so that the numbers written match those generated on the production area. 4. Tracing the source of data errors that occurred so that they can retrain members who do not understand data recording. 5. Update the target achievement figures for each team at least 2 times a week so that the team can catch up with the results. 6. Provides data during the Weekly and Monthly Report. 1. Coordination with Sales if there is a change in stuffing. 2. Coordinate with Warehouse to check finished material inventory and the number of shortages. 3. Update the production schedule if there are production delays or changes to the stuffing schedule. 4. Coordinate with the Purchasing for the availability of materials per day. 5. Coordination with Maintenance for machine readiness. 6. Coordinate with GA / HR for the availability of PPE. 7. Coordination with Warehouse for Chemical availability. 8. Coordinate with Quality Control regarding the quality standards of finished materials. 9. Coordination with Sales regarding quality standards in each packaging. 10. Provide direction to each Team Leader regarding the quality standards in each packaging. Show less

    • Indonesia
    • Retail
    • 700 & Above Employee
    • Building Operations
      • Feb 2020 - May 2020

      > Conduct Mall Management planning such as making budget management, determining work targets and estimating work and making activity plans. > Operate the Mall in a professional, efficient and consistent manner and system that represents the Directors in daily operations. > Administration, management, correspondence with external and internal parties and good data documentation. > Monitor and ensure that work service requests have been met in accordance with established rules and procedures. > Ensuring the performance of engineering both maintenance of building equipment as well as preventive maintenance and engineering services run well. > Ensuring that all activities / events can be carried out according to the target and can bring direct and indirect benefits to the development of the property being managed. > Ensuring that contracts from Subcontractors and contractors are in accordance with the established budget. > Supervise and monitor all activities and work results of all outsourcing / Contractors (Security, Parking, House Keeping, Landscape, Sanitary, Pest & Rodent Control, engineering, etc.) to obtain maximum results and in accordance with Standard Operating procedures (SOP), which have been specified in the operation of the Property. > Monitor and ensure that human resources under their coordination act skillfully and competently in carrying out their duties in accordance with the provisions. > Ensuring a reward and punishment system for employees equally. > Monitor and ensure the security, order, comfort and cleanliness / neatness of buildings so as to create conducive and comfortable conditions for owners / tenants and visitors in carrying out trade transactions Show less

    • IT Services and IT Consulting
    • 1 - 100 Employee
    • Project Engineer
      • Mar 2019 - Oct 2019

      ➢ Make a Budget of Quantity for installation, Time Schedule Project and Report Project ➢ Coordination with Client related about Schedule Project ➢ Test Continoity and Test Commisioning after Installation ➢ Training with Client after Test Continoity and Commisioning ➢ Learn about : 1. Paradox Alarm 2. CCTV Hikvision 3. Vista 20 and 128 Alarm 4. Acces Control PW 4.2 ➢ Make a Budget of Quantity for installation, Time Schedule Project and Report Project ➢ Coordination with Client related about Schedule Project ➢ Test Continoity and Test Commisioning after Installation ➢ Training with Client after Test Continoity and Commisioning ➢ Learn about : 1. Paradox Alarm 2. CCTV Hikvision 3. Vista 20 and 128 Alarm 4. Acces Control PW 4.2

    • Indonesia
    • Chemical Manufacturing
    • 1 - 100 Employee
    • Main Foreman
      • Oct 2016 - Oct 2018

      ➢ Make a Preventive and Predictive Maintenance schedule ➢ Make a report Maintenance and report to Supervisor ➢ Make a Project schedule with Supervisor and Manager : 1. Installation/Rebuild the Panel Control 2. Installation New Trafo (upgrade power) with PLN’s Contractor 3. Installation Fire Alarm Signal 4. Installation New Component and Wiring to the Production Foam Machine 5. Installation New Wiring in the New Buliding (Main Panel, Lamp and Stopcontact) ➢ Support the Production Foam Activities Show less

Education

  • Sekolah Tinggi Teknik - PLN
    Bachelor's degree, Mechanical Engineering

Community

You need to have a working account to view this content. Click here to join now