Maryono Palindung

RNO Engineer at PT ZTE Indonesia
  • Claim this Profile
Contact Information
Location
South Sulawesi, Indonesia, ID

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Indonesia
    • Oil and Gas
    • 1 - 100 Employee
    • RNO Engineer
      • Oct 2015 - Present

      - Neighbour Audit/Creation/Definitions [Create-delete External Adjacencies 2G/3G] From NOKIA to ZTE/ Adjacent Consistency checking after Swap Activity (missing neighbor Check) - Provide 2G KPI Baseline swap - Concheck Sitelist swapped [Nodin swap/Planning] vs Actual sites. - Analyzing measurement results and identifying network problems with network performance indicators - Standby during Swap Activity, - Performance Monitoring and Reporting for NOKIA Site that not yet swap [Border Swap between NOKIA and ZTE] - 2G Audit Traffic Ultilization [Boost Power] Show less

    • Sweden
    • Telecommunications
    • 700 & Above Employee
    • RNP Resource [SWAP]
      • Sep 2015 - Sep 2015

      - Neighbour Audit/definitions [Create-delete External Adjacencies 2G/3G] From NOKIA to ERICSSON/ Adjacent Consistency checking after Swap Activity (missing neighbor Check) - Analyzing measurement results and identifying network problems with network performance indicators - Standby during Swap Activity, - Performance Monitoring and Reporting for NOKIA Site that not yet swap [Border Swap between NOKIA and ERICSSON] - Neighbour Audit/definitions [Create-delete External Adjacencies 2G/3G] From NOKIA to ERICSSON/ Adjacent Consistency checking after Swap Activity (missing neighbor Check) - Analyzing measurement results and identifying network problems with network performance indicators - Standby during Swap Activity, - Performance Monitoring and Reporting for NOKIA Site that not yet swap [Border Swap between NOKIA and ERICSSON]

    • Singapore
    • Telecommunications
    • 500 - 600 Employee
      • Oct 2014 - Sep 2015

      - Pre-Launch Optimization 2G Sites NOKIA (TINEM3 & NGTINEM), - Implement BSS parameter changes, neighbour definitions/deletion and frequency retune as well as physical changes to improve network performance. (Parameter Optimization and Physical Tunning)- Propose Re-design Site & Lowering Antenna based on Coverage Assessment to reduce Interference Frequency on 2G System- Presentation & Review result Key Performance Indicator [KPI] New Site and Swap site with Costumer- Monitoring and Reporting before/after 2G Refarming activity (GFR)- Handle Rehoming activity (New BSC), make sure all parameter and adjacencies for site that rehoming to new BSC and achieved KPI must be Maintained/ Improve than before Show less

      • Apr 2014 - Sep 2015

      - Performance review of KPI LV (Lock Value) measurement for new integration / connected sites (2G,3G, 4G Sites)- Achieve 2G/3G/ 4G Lock Value (LV) KPIs Targets.- Consistency Check 2G/3G/ 4G Parameter/Database for new sites (DB Concheck)- Neighbour Audit: Adjacent Consistency checking after BTS Connected (missing neighbor Check)- 2G Parameter Standarization and Parameter Tuning for LV KPI’s Improvement- Alarm Log ZEOL-ZEOH (2G), ZAAP-ZAHP (3G) Analysis- 2G FMR commissioning checking by doing remote access using Flexi BTS manager- NodeB commissioning checking by doing remote access using WBTS manager- Create 2G/3G/4G eLV Report (integration state) and eOA/Stability Report (On Air State) that uploaded in eBAST Telkomsel- Solved XML Provision Problematic (PCR execution) Show less

      • Apr 2011 - Mar 2014

      - Perform day to day network performance monitoring from Netact OSS 5.2 KPIs by using NSN tool, NetAct Reporting Suite and prepare daily KPI Report (NOKIA Part), and from BATRANA and Servo AnalyticaBR80, BR90 (SIEMENS Part)- Collecting 2G/3G NOKIA MML Log (Alarm, Parameter, etc.), analyzing and handling the alarm problem on daily basis.- Collecting daily or hourly KPI Measurement, ND reports, RSRAN reports from NetAct or remote software ( SSH and Telnet connection)for 2G/3G networks.- Provide 2G Siemens KPI measurementand CTRX, SCANHO using Servo Analytica and Batrana- Prepare and generate script for network Database by using NSN tools (NetAct plan editor for xml file generation)- Executing the 2G/3G Nokia Parameter Change Request proposed by RF Optim Engineer from NetAct Operation Manager, OMS Site Manager, directly from NetAct CM Editor or directly remote to Nokia BSC or BTS with remote software via SSH/Telnet Connection (in several case)- Performance review of KPI LV (Lock Value) measurement for new integration / connected sites- Standby, live monitoring for SWAP/rehoming Activity (Common Abis, SWAP BTS Hardware [SIEMENS to NOKIA, HUAWEI to NOKIA]).- Broadcast KPI measurement (SMS) after SWAP/Rehoming activity done Show less

    • OMC Radio Monitoring
      • Feb 2008 - Mar 2011

      - Perform day to day 2G/3G Network Alarm Monitoring{From NetAct OSS [NOKIA] and Radio Commander [SIEMENS], Minos/ISMG [ZTE], M2000 [HUAWEI]} PT. TELKOMSEL Reg. IX (Sumalirja) - Trouble Ticket delivery alarm (Module/Hardware, BTS, PCMS, PCMA, TRAU, BSC, OMAL, etc) - Trouble Ticket delivery alarm (Module/Hardware, NodeB, IuPS, IUCS, RNC, Transmission, etc) - Trouble Ticket delivery alarm MSI (Major Service Impact) case. - Broadcast Overload Indication, Active Alarm and environment alarm (MSC, BSC and BTS) - Module Alarm test handling (Lock-Unlock, Delete-Create Module) - Support Database and Measurement (NSN-ZTE-HUAWEI Measurement) - Alarm analysist, and escalation to BSS Engineer Show less

Education

  • Universitas Hasanuddin
    Bachelor of Engineering, Telecommunication and Information
    2006 - 2010
  • SMK Telkom shandy Putra 2 Makassar
    High School, Transmission Engineering
    2003 - 2006

Community

You need to have a working account to view this content. Click here to join now