Mary Ann Concepcion Mendoza

Trackworks Survey Assistant cum Engineer at CTCI Singapore Pte Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
1 connection
Languages
  • English Full professional proficiency
  • Filipino - Tagalog Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Civil Engineering
    • 1 - 100 Employee
    • Trackworks Survey Assistant cum Engineer
      • Jun 2014 - Present

      Porject Involved: Survey works for Trackworks at Singapore's Downtown Line 3, Thomson Eastcoast Line Stage 1-3 & Mandai Depot• Verification of track alignments issued by the client and preparation of alignment for site survey use. • Preparation and calculation of setting out detail of all tracks and turnouts and ensure that client’s accuracy requirement is obtained.• Preparation and checking of setting out detail of trackside installations using ACAD/TGO.• Processing and checking of site survey datas (3D, 2D, track geometry data) to ensure that rail position is within tolerance prior, during, and after concreting/tamping.• Process track/trackside installation as-built survey datas using ACAD to compare with construction drawings and highlight discrepancies to Design team or Quality Control team.• Processing and analysis of Laser Scanner Data on completed tracks by Collision test and infringement checking for structure gauge clearance. Preparation of non-compliance report of all intrusions on the structure gauge.• Prepare Method Statements and Quality Plans relating to Survey works and Structure Gauging.• Liaise with other departments (Design & Quality Control) and Client on providing technical advice relating to laser scanning and survey works. • Study obligations/deliverables relating to trackworks as indicated on the client’s specification.• Prepare drawings and sketches for TSA layouts,Track Alignment As-builts, and Prepare Calculations for material storage loading.

    • Real Estate
    • 700 & Above Employee
    • Quantity Surveyor
      • 2012 - May 2014

      Project Involved: Various Ongoing and Completed Projects (Highrise Buildings / Townships)• Close out existing variation orders by referring to Contractor’s Contract and bid drawings.• Preparation of the Bills and/or Schedules of Quantities of materials, labor and services required in validation of Variation orders.• Statement of final account, summarizing the cost charges that have occurred and arriving at a final contract sum after completion of a contract.• Analyzing Contractor’s terms and conditions for various risks such as ambiguities, conflicts or deviations from the scope of work.• Assessing the cost effects when changes occur and agree on variation with Contractors.• Conduct ocular inspections to ensure that all variations are executed as claimed and discuss to site representatives on the history of claims

    • Philippines
    • Construction
    • 500 - 600 Employee
    • Quantity Surveyor
      • 2011 - 2012

      Project Involved: Nestle Philippines Project Frontier (Construction of Civil, Egron, Warehouse and Utilities)• Preparing the: Bills and/or Schedules of Quantities of materials, labor and services required for construction.• Final detailed estimate in consultation with the project manager, which forms a basis on which subsequent tenders can be evaluated.• Statement of final account, summarizing the cost charges that have occurred and arriving at a final contract sum after completion of a contract.• Analyzing subcontractor’s terms and conditions for various risks such as ambiguities, conflicts or deviations from the scope of work.• Assessing the cost effects when changes occur and agree on variation with the client.• Conduct joint measurement and ocular inspection on site in validating subcontractor’s payment evaluation.• Tracking all the abnormal costs/ wastage, preparing comparative statements, conducting tender interviews and recommending measures to avoid them.

    • Cost Engineer
      • 2009 - 2011

      Project Involved: 35 Storey Residential Building (Greenbelt Excelsior, Makati)• Preparation of the Bills and/or Schedules of Quantities of materials, labor and services required in the construction. And ensuring that there’s minimal wastage, i.e. concrete and rebar.• Conduct site inspections with rebar subcontractor for payment claims and ensure rebars are installed as per cutting list.• Preparation of Monthly Billing to Client comprising agreed project cost and projects actual progress. Conduct site inspections to justify monthly billing.• Preparation of Monthly Reports showing Actual Project progress and indicating monthly project expenses, cause of delays and actions being done to mitigate further delays. • Preparation of variation orders by quantifying changes from bid drawings to construction drawings. • Attend weekly Company Operations meeting to discuss project delays, Variation Orders, and Commercial actions on said Variations• Prepare Justifiable time extension and additional project overhead expenses due to Variation Orders and Operation delays caused by third parties hired by the Client.• Duly study Contract issued by Client to learn about company’s work scope and Obligations to client• Statement of final account, summarizing the cost charges that have occurred and arriving at a final contract sum after completion of a contract.• Assessing the cost effects when changes occur and agree on variation with Client.• Ensuring execution of various commercial activities are within set time, quality and terms & conditions in the Contracts Management Manual.• Tracking all the abnormal costs/ wastage, preparing comparative statements, and recommending measures to avoid them.

Education

  • Technological university of the philippines
    Bachelor of Science in Civil Engineering
    2002 - 2008
  • Philippine Regulation Commission
    Licensed Civil Engineer
    2008 - 2008

Community

You need to have a working account to view this content. Click here to join now