Martyn McPhait
Pipefitter at Global Energy Group- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Global Energy Group
-
United Kingdom
-
Services for Renewable Energy
-
500 - 600 Employee
-
Pipefitter
-
Dec 2016 - Present
-
-
-
Amec Foster Wheeler
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Pipefitter
-
Feb 2016 - Nov 2016
-
-
-
Caledonian Petroleum Services Ltd
-
Beryl Bravo
-
Pipefitter
-
Nov 2015 - Jan 2016
-
-
-
Wood
-
United Kingdom
-
Professional Services
-
700 & Above Employee
-
Pipefitter
-
Jun 2015 - Sep 2015
Carrying out shutdown work during this time I was breaking containment and spading of joints for vessel entry, installing new pipe work, bolting and torqueing up flanges. Carrying out shutdown work during this time I was breaking containment and spading of joints for vessel entry, installing new pipe work, bolting and torqueing up flanges.
-
-
-
Kirby Group Engineering
-
Ireland
-
Construction
-
700 & Above Employee
-
Instrument Pipefitter
-
Jan 2015 - May 2015
Installation of copper and stainless instrument pipework and fittings for pneumatic and hydraulic systems. Installation of manifolds and associated pipework for PCV’s, ESV’s and pressure transmitters. Performing authority for permits. Installation of copper and stainless instrument pipework and fittings for pneumatic and hydraulic systems. Installation of manifolds and associated pipework for PCV’s, ESV’s and pressure transmitters. Performing authority for permits.
-
-
-
Wood
-
United Kingdom
-
Professional Services
-
700 & Above Employee
-
Pipefitter
-
Apr 2013 - Nov 2014
Performing Authority under the ISSSOW- arranging permits with the Area Authority, giving Tool Box Talks to work parties. Completing field fit welds as part of the hook up of the new kinoull module intergrating into the existing platform. Bolting of flanged and clamped high pressure joints. Completion of documentation GOC's MP1's and JI1's Performing Authority under the ISSSOW- arranging permits with the Area Authority, giving Tool Box Talks to work parties. Completing field fit welds as part of the hook up of the new kinoull module intergrating into the existing platform. Bolting of flanged and clamped high pressure joints. Completion of documentation GOC's MP1's and JI1's
-
-
-
Doosan Babcock
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Pipefitter
-
Apr 2012 - Apr 2013
Maintenance activities and pre shutdown preparation work Maintenance activities and pre shutdown preparation work
-
-
-
Wilton Engineering
-
United Kingdom
-
Oil and Gas
-
100 - 200 Employee
-
Pipefitter
-
Mar 2012 - Apr 2012
Setting up and marking out pipework, cutting, prepping and shaping pipe to the correct dimensions from the isometric drawings. Setting up and marking out pipework, cutting, prepping and shaping pipe to the correct dimensions from the isometric drawings.
-
-
-
Wilton Engineering
-
United Kingdom
-
Oil and Gas
-
100 - 200 Employee
-
Pipefitter
-
Nov 2011 - Nov 2011
Fabrication and set up of various sizes of pipe and bends using stainless steel and carbon pipe Fabrication and set up of various sizes of pipe and bends using stainless steel and carbon pipe
-
-
-
Doosan Babcock
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Pipefitter
-
Sep 2011 - Nov 2011
G4 and Benzene shutdown. Breaking of containment, blanking off vessels, destruct of redundant pipework, overhaul and/or modification of existing pipework. Installation of values, pressure testing of lines G4 and Benzene shutdown. Breaking of containment, blanking off vessels, destruct of redundant pipework, overhaul and/or modification of existing pipework. Installation of values, pressure testing of lines
-
-
-
Shaw Group
-
ineos - grangemouth & pembroke power station
-
Apprentice Pipefitter
-
Sep 2008 - Sep 2011
-
-
Education
-
Falkirk College
NVQ level 3 in Pipefitting -
Braes high school