Martyn Jones

Installations Consultant - Medical Equipment at MJ Medical
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Queensland, Australia, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Member
    Institute of Healthcare Engineering and Estate Management
    Apr, 2005
    - Oct, 2024
  • Member
    Society of Operations Engineers
    Sep, 2000
    - Oct, 2024
  • Incorporated Engineer UK
    -
    Nov, 1993
    - Oct, 2024
  • Member
    Institution of Plant Engineers
    Nov, 1993
    - Oct, 2024

Experience

    • Medical Device
    • 1 - 100 Employee
    • Installations Consultant - Medical Equipment
      • Apr 2015 - Present

      On-site coordination of fixed medical equipment installations for Sir Robert McAlpine Cleveland Clinic project at 33 Grosvenor Place Belgravia.On-site coordination of fixed and mobile medical equipment for UCLH Trust atRoyal National ENT and Eastman Dental Hospitals LondonTechnical review of services requirement for medical and laboratory equipment at Calgary hospital Canada.On site co-ordination of fixed medical equipment installations and procurement of mobile medical equipment in new AlDara private clinic/hospital in Riyadh Saudi Arabia. Includes liaison on site between client, project management, main construction contractor and technical advisers in USA. On-site location of delivered fixed and mobile medical equipment to new clinic in Dubai.Fixed medical equipment tender evaluation for new clinic/hospital in Dubai UAE.Technical specification development for fixed and mobile hospital equipment.

    • New Zealand
    • Wholesale Building Materials
    • 1 - 100 Employee
    • Setter Operator - Automated Lumber Machinery
      • Nov 2012 - Jan 2014

      ResponsibilitiesOperate and set lumber manufacturing machinery including moulder, sander and vacuum paint machines Measure product and troubleshoot problems Pack for export and import markets. Operate up to 6Tonne forklift trucks, stack, de-stack packs and load trucks ready for despatch. ResponsibilitiesOperate and set lumber manufacturing machinery including moulder, sander and vacuum paint machines Measure product and troubleshoot problems Pack for export and import markets. Operate up to 6Tonne forklift trucks, stack, de-stack packs and load trucks ready for despatch.

    • Project Manager
      • May 2011 - Sep 2012

      ResponsibilitiesDesign, cost and manage installation projects in local electrical reticulation networks.Build business through research, canvassing and meeting with clients.Manage personnel, equipment purchases and programme schedules for projects.Ensure compliance with client standards and specifications.Market and sell stock materials.AchievementsRaised colleagues safety awarenessStreamlined stores including rationalisation and disposal ResponsibilitiesDesign, cost and manage installation projects in local electrical reticulation networks.Build business through research, canvassing and meeting with clients.Manage personnel, equipment purchases and programme schedules for projects.Ensure compliance with client standards and specifications.Market and sell stock materials.AchievementsRaised colleagues safety awarenessStreamlined stores including rationalisation and disposal

    • Team Leader/Depot Supervisor
      • Jan 2008 - Apr 2011

      Responsibilities: Plan, set up and co-ordinate work for up to ten permanent staff on electricity grid substation installations including 11kV, 33kV, 66kV, 120kV, 220kV AC and 375kV DC systemsInspect substations and organise replacement of transformers, circuit breakers, etcCarry out contingency and disaster planning Liaise with Transpower Maintenance Manager to schedule work and system outages in order to carry out line repairs and maintenanceCreate workplan and annual maintenance schedule for Transpower’s authorisation Process paperwork and forward administration work to Christchurch officeCo-ordinate recalibration and recertification of all electronic, lifting and testing equipment and hand tools Track job cards and ensure all tasks are completed by team. Achievements: Organised and moved depot workshop and office from shared premises in Richmond to set up a separate base for Transfield in Stoke. Responded promptly and effectively to a 33kV circuit breaker failure in Stoke and used ingenuity to effect temporary repairs for reinstatement, whilst awaiting arrival of parts from France and Australia.Reorganised O&M data and maintenance histories to reflect current fleet and more ease of use on site for particular sets of equipment outages.Raised colleagues safety awareness

    • China
    • Medical Equipment Manufacturing
    • 1 - 100 Employee
    • Deputy General Manager
      • Jul 2007 - Dec 2007

      Responsibilities:Prepare drawings and schedules for manufacturing medical equipment to enable the transfer of UK technology to the People’s Republic of China Oversee general quality improvement in the manufacture of CE certified medical pendant and gas terminal unitsAchievements: Involved in setting up contract with GE Health Care (Hong Kong) to gain the sole distribution rights of GE Health Care products in China Negotiated with Israeli financiers to gain finance to enable Glory Medical Co to list on the Hong Kong stock exchangeRaised colleagues safety awareness

    • United Kingdom
    • Hospitals and Health Care
    • 1 - 100 Employee
    • Project Manager
      • Sep 2003 - Jun 2007

      ResponsibilitiesVarious roles including project site liasion, coordination and management.Member of senior management team during reorganisation of companyAchievementsAssisted and advised head office colleagues on completing a £36M public-private finance initiative project in Gloucester. Then co-ordinated the delivery and installation of £2.6M worth of medical and non-medical equipment including x-ray machines and medical gas pendant systems through to soap dispensers for the Royal Infirmary, GloucesterAdvised on the content and oversaw the development of specifications for the medical and non-medical equipment for a 4,500 room hospital and completed £350M project through to design sign-off by the various clients. Then co-ordinated a project to provide all medical and non-medical equipment to update clinical service provision in remote design office in Stoke in TrentManaged £6.8M project on site to install medical equipment into a new cardiac centre at Royal Victoria Hospital, Blackpool and achieved timely completionTwice co-ordinated and witnessed the 12 month maintenance and revalidation of medical gas and decontamination equipment in a 106 bed trauma centre on the Ministry of Defence Royal Fleet Auxiliary Ship Argus and managed the refit and provision of medical storageAssisted with the high level planning of several hospital developments in England, Northern Ireland and CornwallInvolved in establishing policies to effect the restructuring of the companyDeveloped and instigated a new staff appraisal system and wrote job descriptions for various employeesUpdated existing databases with generic mechanical and electrical engineering informationIdentified and resolved difficulties of installing equipment at various projects on-site.Assisted with equipment speciifcations for Iraqi laboratory rebuildRaised colleagues safety awareness through method statements and risk analysis

    • Engineer
      • Mar 2003 - Sep 2003

      AchievementsCarried out refurbishment of 92 gas pendant systems at Wishaw General Hospital Scotland, including client liaision and occupant agreement for entry, removal of equipment and subsequent reinstallation after removal from medical areas. Units were dis-assembled, machined and reassembled with new pneumatic brake systems. Completed M&E Clerk of Works duties on medical training facility at Treliske District Hospital Cornwall UK AchievementsCarried out refurbishment of 92 gas pendant systems at Wishaw General Hospital Scotland, including client liaision and occupant agreement for entry, removal of equipment and subsequent reinstallation after removal from medical areas. Units were dis-assembled, machined and reassembled with new pneumatic brake systems. Completed M&E Clerk of Works duties on medical training facility at Treliske District Hospital Cornwall UK

    • United Kingdom
    • Construction
    • Small Works Manager
      • Feb 2002 - Feb 2003

      ResponsibilitiesManaged electrical, mechanical and civil engineering contracts. Managed small team of engineers carrying out day to day maintenance and repairs for large supermarket changeOrganised fire alarm and emergency lighting upgrade works in large District Hospital.AchievementsIncreased profit through rationalisation of suppliers and renogotiated fast moving product prices ResponsibilitiesManaged electrical, mechanical and civil engineering contracts. Managed small team of engineers carrying out day to day maintenance and repairs for large supermarket changeOrganised fire alarm and emergency lighting upgrade works in large District Hospital.AchievementsIncreased profit through rationalisation of suppliers and renogotiated fast moving product prices

    • Project Manager/Design Team Leader
      • Jul 1999 - Feb 2002

      ResponsibilitiesManaged site contracts at various hospitals throughout UK including PFI and Private facilities Attained co-ordination between factory output and site requirementsManaged output of four person engineering design team, for constantly changing product listInvestigated and reported on product value engineering issuesAchievementsRedesigned the inverter driven control system for operating theatres ultra clean ventilation canopies, achieving a 50% reduction in production costs while enhancing specifications and reducing life cycle costsIncreased profits due to remogotiated prices for supplies and value engineering productsIncreased colleagues safety awareness

    • Sales Representative
      • Dec 1993 - Jun 1999

      ResponsibilitiesService customers for sales of electro-technical goods included small, medium and large electrical contractors and industrial and commercial companies. AchievementObtained 600% increase in sales revenue with a corresponding increase of gross profit from 16% to nearly 28% during 5 full years. ResponsibilitiesService customers for sales of electro-technical goods included small, medium and large electrical contractors and industrial and commercial companies. AchievementObtained 600% increase in sales revenue with a corresponding increase of gross profit from 16% to nearly 28% during 5 full years.

    • Real Estate
    • 1 - 100 Employee
    • Project Manager/Airfield Maintenance Officer
      • Jul 1986 - Oct 1993

      Project Manager/Airfield Maintenance Officer  ResponsibilitiesAirfield generators, ground lighting, 11kV power distribution, buildings, hangars, office blocks, bulk fuel installations, boiler and air conditioning systems Operated permit-to-work systems including electrical safety in HV, LV and potentially hazardous areas, oil petroleum and lubricant bulk storage, LTHW boiler systems and operation of HV switches and bypassing of generator and ups systems Controlled and participated in emergency callouts including lightning strikes, burst water mains and street light failuresCreated forward maintenance registerCreated design brief and managed tender process, prepared contract documents and letting of contractPrepared projects, completed Clerk of Works duties and signed off for clientManaged budget of over £1M/yearAchievementsReorganised all M&E maintenance system for RNAS Culdrose and RAF Portreath airfieldsRaised colleagues safety awareness through firm application of permit to work proceduresNo LTI of colleagues during employment

Education

  • Burton Upon Trent Technical College
    C&G Mechanical Engineering _ Production, Full Technological Certificate
    1972 - 1978
  • Wilnecote High School, Tamworth UK
    High School, English Language and Literature, Mathematics, Physics, Geography, History
    1967 - 1972

Community

You need to have a working account to view this content. Click here to join now