Marlena Chiriac
Project Coordinator at Eekels Romania- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Professional working proficiency
-
Italian Limited working proficiency
-
Spanish Limited working proficiency
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
Eekels Romania
-
Romania
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Project Coordinator
-
Oct 2012 - Present
I am responsible in: - making the execution graphic of the project and following to be implemented as indicated; - planning, managing and coordinating the human and the materials resources involved in the project, as the project graphic indicates; - synthesizing, clarifying and communicating the information between the project team members; - preparing the reports necessary for the project (financial, extrawork, delays etc); - establishing a connection with the beneficiary, taking over the observations from him and applying them to the project; - taking over the beneficiary’s requests for the additional works, transmits him the financial implications and the execution terms; - getting involved in solving the problems that appears in the Panel Building Department, evaluating the risks, developing strategies for streamlining the activity, increasing productivity; - taking measures to remedy the deficiencies found by all those who check. Show less
-
-
-
STX OSV Tulcea SA
-
Shipbuilding
-
1 - 100 Employee
-
Electronic Engineer
-
Oct 2011 - Oct 2012
Modeled, in Foran and Aveva, the electrical cable routes, penetrations, electrical equipments only for PSVs (Power Supply Vessel); Made the Steel Outfitting drawings in Autocad, of the electrical equipments, cable routes and penetrations for each block, deck, section; Prepared the Steel Outfitting “As built” drawings for a PSV vessel in Norway. Modeled, in Foran and Aveva, the electrical cable routes, penetrations, electrical equipments only for PSVs (Power Supply Vessel); Made the Steel Outfitting drawings in Autocad, of the electrical equipments, cable routes and penetrations for each block, deck, section; Prepared the Steel Outfitting “As built” drawings for a PSV vessel in Norway.
-
-
-
-
Assistant Manager
-
Sep 2010 - Oct 2011
Organised meetings, prepared the agenda together with the support of materials and presentations necessary for their good development; Prepared the folders and reports with all the justifying documents used in the project’s implementation and transmitted them to POS DRU (Programul Operational Sectorial Dezvoltarea Resurselor Umane - Sectoral Operational Program of the Human Resources Development); Periodically checked the new instructions that appeared in POS DRU (SOP HRD) and applied them to the project. Show less
-
-
-
Alewijnse Industrie B.V.
-
Netherlands
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Engineer In Training
-
Dec 2009 - Feb 2010
Mounted and connected the electrical equipments (Frequency converters, PLCs, engines etc) in accordance with the manufacturer’s requirements; Equipped an electrical panel and connected the components according to a given drawing (star-delta connection of an engine, lighting etc); Performed a simple electrical installation projects using E-plan or Autocad; Commissioning of a simple electrical panels and other equipments, under the supervision of a qualified personnel; Motors control using PLCs, solving the exercises with PLCs proposed on the website leerstoffnet.nl Show less
-
-
Education
-
Facultatea de inginerie electrica si electronica, Galati
Engineer's degree, Electrical and Electronics Engineering -
Alewijnse Training Center Romania
VCA diploma, Safety and Security at work -
TÜV Rheinland-Schulen Gera
“Project management - Advanced” diploma, Project Management -
TÜV Rheinland-Schulen Gera
Project Management - Basic, Project Management -
Alewijnse Training Center Romania
Engineer Trainee, Engineering