Marlen Edith Escobar Orocopey

Head of Energy Storage at Ecoener
  • Claim this Profile
Contact Information
Location
Madrid, Community of Madrid, Spain, ES
Languages
  • Inglés Full professional proficiency

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Spain
    • Electric Power Generation
    • 1 - 100 Employee
    • Head of Energy Storage
      • Jul 2023 - Present
    • China
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Product Manager of Energy Storage, MSS, EMEA
      • Nov 2022 - Jun 2023

      Owner and main responsible for the storage product to EMEA. Responsible to get in form and time the documentation of the products to different markets of EU: Certifications, datasheets, manuals, warranties, PO, updating benchmarking, etc. Coordination and run of Spain alpha test for the first battery + hybrid inverter all in one of Canadian solar. Technical support to sales departments. Manager to discover the possible improvements in the product according with the client’s necessity, the market, and the current and future regulations of Storage in Spain Key Projects: - EP Cube. Launch and Product consolidation to Spanish and Italian markets Spain and Italy - Include the EMS concept in the EP Cube to save money in the residential customers Spain. Show less

    • Spain
    • Renewable Energy Semiconductor Manufacturing
    • 100 - 200 Employee
    • Energy Storage Manager
      • Nov 2020 - Sep 2022

      Development a new line of business with the focus on the ESS and several opportunities to promote the renewables integration, for example: green Hydrogen, hydronations of plants (PV + Wind and Storage). I participated in the whole life- cycle of from the identifications of grant or finance opportunities, permitting ang get the Ready to Build, the contract and Manager of the EPC. Wide knowledge of the regulations about renewables energy (RD of 2019 and 2020) about storage, clean energy and economic reactivations post-covid 19. - Development of storage stand-Alone portfolio projects 2022-2025 - Development and options evaluations of Hybridizations in currently projects on development (PV+BESS). Capacity tender 2022 - Development of the business line for ESS, Energy Storage Systems, utility scale and ESS + PV hybridization - Economic estimates: projection of the costs of the storage systems, based on the selected technology and the main global suppliers at present (direct contact with possible suppliers) - Definition of possible strategies for the application and control of the ESS (loading and unloading instructions) based on the current regulatory framework and future forecast. Show less

    • R&D Fotovoltaic Project Manager
      • Apr 2019 - Nov 2020

      Dirección y coordinación de proyectos de desarrollo en grupos multidisciplinares. Seguimiento e intervención para alcanzar los objetivos del proyecto. Desarrollo y validación de productos maximizadores de Albedo, aumentando la ganancia bifacial de las plantas fotovoltaicos Coordinación y contratación de proyectos outsourcing. Confección de estudios de viabilidad para nuevas líneas de desarrollo. Gestión de relaciones con proveedores y diferentes socios comerciales en consorcios europeos. Definición y desarrollo de propuestas nacionales e internacionales para la financiación de actividades de I+D vinculados con seguidores solares y demás sistemas fotovoltaicos. Show less

    • Colombia
    • Insurance
    • 1 - 100 Employee
    • Battery Project Manager
      • Nov 2017 - Mar 2019

      Secure contracts through utilisation of effective negotiation and communication skills. Track and monitor routine activities as well as ensure delivery of project on time and within budget. Streamline project processes by gaining knowledge of local standards on each project. Direct and manage energy storage projects from inception till completion as well as ensuring compliance with company standards quality. Deliver exceptional services by identifying and meeting client’s needs. Successfully manage National and international logistics through coordination with multidisciplinary work teams. Key Projects:  250kW and 750kWh flow battery based energy storage system. 2018 Naturgy / Spain  Supply of 200 kWh and 50 kW flow battery based energy storage system. 2018. Bharat Heavy Electricals Limited (BHEL)/India  250kW of flow battery (Vanadium Redox flow battery) CE Market Energy Storage Solutions/ Spain. Show less

    • Spain
    • Higher Education
    • 700 & Above Employee
    • R&D Engineer
      • Oct 2012 - Nov 2017

      Improved the wear and high temperature through design and optimization of the manufacturing process of coatings. Identified mechanical properties and conducted microstructural analysis by optical microscopy, hardness, adhesion, porosity and distribution of phase’s studies in the projected coatings. Utilized thermal spray for manufacturing, mechanic, and microstructural characterization of structural materials. Key Projects:  Development of new coatings to tower receivers for solar thermal power plants. Abengoa Solar New Technologies.  Materiales Absorbentes y Selectivos SOLares en receptores centrales (MASSol). +Sol cdti- innpacto  Cold Spray radical solutions for aeronautic improved repairs (corsair) comunidad económica europea, 7th framework programme fp7-aat-2013-rtd-1  Coating of a blade by Atnosferical thermal spraying turbocadiz, s.l. Show less

    • R&D Engineer
      • Oct 2009 - Sep 2012

      Demonstrated expertise in mechanical design, optimization of power consumption, mechanical vibration analysis and measurement techniques of mechanical properties. Directed projects, including Magdrive, Euraxles and Pasibot, while serving as researcher of the MAQLAB Research Group. Carried out analysis of mechanical behavior (static and dynamic conditions) and FDS through development of computational studies and using CAD, FEM (finite element methods). Proposed and devised self-protection plan as well as executed fire prevention/protection facilities, such as Passive fire protection systems, active fire protection systems, detection systems, manual and alarm communication systems, systems of emergency lighting and signal. Key Projects: - Simulation and study of fire behavior in a building of 16 heights (FDS y Smokeview) UC3M- Hidrinco - PIC systems in a maintenance base Integral of towed material UC3M-Marioff Hi Fog. - Design of the fire protection installation for a wholesale module for charcuterie, cheeses and eggs in general, located in Mercatenerife Instituto Pedro Juan de LastanosaChacón e Hijo. - Standardization EN45545: “Fire Safety in Railway Vehicles”. European Committee for Standardization CEN/TC 256. - Characterization of reaction to fire in materials using laser techniques Instituto Pedro Juan de Lastanosa-UC3M. - EURAXLES: Minimizing the risk of fatigue failure of railway Ministerio de Ciencia e Innovación axles. - Optimal design methodology for service robots. Comunidad de Madrid. Show less

    • Spain
    • Education Management
    • 700 & Above Employee
    • Professor of Machine Theory
      • 2012 - 2012
    • Resident Engineer
      • Jan 2008 - Jan 2009

      Managed and implemented technical as well as administrative projects, controlling budget and purchasing supplies/equipment according to specifications. Ensured to properly install ducts, air conditioning, auxiliary systems, and mechanical equipment (ducts, pipes, compressors, evaporators and condensers). Delivered guidance to personnel during the realization of the work. Steered the construction process of the tank and base slab as well as assembled pipe system and of the fire protection system. Key Projects: - Adaptation of the fire system of the PDVSA-GAS filling plant. PDVSA- GAS. - The civil protection headquarters Remodeling Alcaldía del Municipio de Caroní. - Construction of the Raúl Leoni Municipal School. Alcaldía del Municipio de Caroní. - Construction of an Australian tank and assembly of a pumping system for municipal nursery. Ministerio de agricultura y Cría. Show less

    • Venezuela
    • Oil and Gas
    • 700 & Above Employee
    • Engineer of oil & gas exploration and Production
      • Oct 2007 - Jan 2008

      Engineer of oil & gas exploration and Production, specialized in fluids flow and transport, aimed to the development of research projects. - Development of CFD model (Computational Fluid Dynamics) applicable to cyclone separators. - Development of computer simulations using like tools the software, ANSYS and CFX. - Selection and improvement of turbulence models applicable to cyclone separators. - Experimental validation of cyclone separators models, installation of pilot tests and preparation of final design tool. Projects Developed: Technological Intelligence for simulation, validation and modeling of cyclone separators. Show less

    • Project Engineer
      • Jun 2005 - Oct 2007

      Development of turnkey projects Project management in the areas of infrastructure, gases and fluids, interpretation of the plant needs, development of basic engineering, detailed engineering review, procurement of equipment , management of contract personal, supervising and commissioning of work in the industrials plants. Technical advisor on biddings. Development of technical specifications, making data sheets functional, descriptions, process and piping flow charts.Projects Developed:- Preparation of technical specifications and tender for boilers of steam. Dimensioning, strengthcharacteristics and definition of functional parameters (pressure, temperature).- Evaluation of the operating conditions of cooling tower and mechanical equipment of the steam plant.- Design and development of basic and detail engineering of storage containers (tanks, sludge and oil).- Design and development of basic and detailed engineering for sludge and oil tanks.- Redesign of pumping systems for water recycling plant.- Selection and installation of mechanical and pumping equipment for irrigation systems- Coordination, supervision and assembly of piping for water and air oxygen plants. Show less

    • Junior Process Engineer
      • Jun 2005 - Nov 2005

      Development of process flow diagrams, process calculation reports- Preparation of technical specifications, data sheets and functional descriptions.- Control, observation and identification of key process variables for process and equipment operation. - Characterization and functional description 100% of equipment and machinery existing pellet plant (pumps, compressors, dryers, heat exchangers, furnaces, transfer and storage tanks, material distribution systems, etc.).

    • Venezuela
    • Utilities
    • 200 - 300 Employee
    • Internship
      • Jan 2005 - Jun 2005

      Knowledge of hydroelectric production process. Development of technology applied to real situations providing technological support at Hydroelectric CVG EDELCA. Projects Developed: - To detail knowledge of the cooling system of generators (heat exchangers, piping systems, valves and associated pressure group). - Measurement of mechanical vibrations in the turbine shaft for recognition of unbalance problems. - Generating in MATLAB software tool for system monitoring of water temperatures, air and dirty level, in the heat exchanger units of the stators of generators. - ANSYS CFX computational simulation of the behavior of the air flow through the generator stator. Determination of hot spots. Show less

Education

  • Universidad Carlos III de Madrid
    Master of Engineering, Ingeniería
    2010 - 2011
  • Universidad Rey Juan Carlos
    Ph.D, Mechanical Engineering and Materials Sciences
    2012 - 2016
  • Universidad Carlos III de Madrid
    Master of Engineering
    2008 - 2010
  • Universidad Nacional Experimental Politécnica 'Antonio José de Sucre'
    Mechanical Engineer, Ingeniero Mecánico
    2001 - 2006

Community

You need to have a working account to view this content. Click here to join now