mark sowerby
Site Supervisor at Cavendish Northern Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Cavendish Northern Limited
-
United Kingdom
-
Mechanical Or Industrial Engineering
-
1 - 100 Employee
-
Site Supervisor
-
Oct 2017 - Present
-
-
Pipefitter
-
Jul 2014 - Present
-
-
Piping Supervisor
-
Oct 2016 - Oct 2017
-
-
-
Petrofac
-
United Kingdom
-
Engineering Services
-
700 & Above Employee
-
Pipefitter
-
Jun 2014 - Jul 2014
Fabricate and fit pipe spools on the sullom voe gas terminal part of the Laggan-tormore project Fabricate and fit pipe spools on the sullom voe gas terminal part of the Laggan-tormore project
-
-
-
Hertel
-
Oil and Gas
-
700 & Above Employee
-
Pipefitter
-
May 2014 - Jun 2014
Producing, fitting and testing pipe spools from isometric drawings in carbon steel, P11, stainless steel and super duplex, with a full range of pipe schedules from SCH10-XXS. Producing, fitting and testing pipe spools from isometric drawings in carbon steel, P11, stainless steel and super duplex, with a full range of pipe schedules from SCH10-XXS.
-
-
-
Cavendish Northern Limited
-
United Kingdom
-
Mechanical Or Industrial Engineering
-
1 - 100 Employee
-
Pipefitter
-
Oct 2013 - May 2014
Project work on fine organics seal sands, site measuring creating installing and testing pipe runs in carbon steel, stainless steel, galvanised steel and ptfe lined carbon steel. Carrying out break-ins on chemical lines in acid and air suits. Module work on lotte lc1 project on a category 1 chemicals site Installing, punching and testing carbon and stainless steel pipe work from isometric drawings. Project work on fine organics seal sands, site measuring creating installing and testing pipe runs in carbon steel, stainless steel, galvanised steel and ptfe lined carbon steel. Carrying out break-ins on chemical lines in acid and air suits. Module work on lotte lc1 project on a category 1 chemicals site Installing, punching and testing carbon and stainless steel pipe work from isometric drawings.
-
-
-
-
pipefitter
-
Jun 2004 - Oct 2013
Fit steam boilers/boilers, heat exchangers, chp units, chiller units, valves, pumps, wide range of pipe work from 8mm to 24" in various materials using multiple pipe jointing techniques eg. Flanges, welded, grooved, express crimped, soft solder, and end brazing. All final connection break-ins, repair work and a lot of projects are carried out under shutdown conditions. Fit steam boilers/boilers, heat exchangers, chp units, chiller units, valves, pumps, wide range of pipe work from 8mm to 24" in various materials using multiple pipe jointing techniques eg. Flanges, welded, grooved, express crimped, soft solder, and end brazing. All final connection break-ins, repair work and a lot of projects are carried out under shutdown conditions.
-
-
-
-
toolmaker
-
Sep 1998 - Apr 2004
-
-
Education
-
Billingham Campus School
-
hartlepool college