Mark Froehlich

Course Developer at CPaT Global LLC.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Houston, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

David DeLeon

Jonathan Reed

If you want an experienced, proficient, self-motivated, goal oriented engineer with excellent analytical and communication skills; then Mark is your guy!!

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Aviation and Aerospace Component Manufacturing
    • 1 - 100 Employee
    • Course Developer
      • Jun 2017 - Present

      Member of the Course Designer group developing computer based courses (CBTs) that pilots use for training. The CBTs are aircraft specific and divided by subsystems. The aircrafts worked on include:- Boeing 737-400 (B737-400)- B747-400- B767-300- B777- Airbus 340-300 (A340-300)The subsystems include (but are not limited to) the following:- Aircraft General- Fire Detection and Suppression System- Fuel System- Doors and Windows System- Air Conditioning System- Communication System- Flight Control System- Power Plant

    • Plumbing Sales Associate
      • Feb 2017 - Jun 2017

      Member of the Plumbing Department as one of four sales associate. Duties included:- Assisting customers- Keeping shelves stocked - Preparing department for yearly inventory Member of the Plumbing Department as one of four sales associate. Duties included:- Assisting customers- Keeping shelves stocked - Preparing department for yearly inventory

    • United Kingdom
    • Civil Engineering
    • 700 & Above Employee
    • Mechanical Engineer
      • Dec 2011 - Jul 2016

      Responsible for engineering, design, and review of gas pipeline and Meter and Regulation (M&R) stations which included, but was not limited to developing the Bill of Material (BOM) , sizing of pipe and valves, developing and review Process Flow Diagrams (PFDs), checking Piping and Instrumentation Diagrams (P&IDs) and mechanical drawings for accuracy, completeness, and adherence to ASME B31.8 specifications. Involved in creating data sheets for Flow Control Valves (FCVs), Pressure Control Valves (PCVs), valve actuators, and hot taps. Performed P&ID walkdown on a newly constructed gas processing facility to verify construction had been done correctly. Also performed safety walk downs at multiple customer sites, producing reports outlining the results of the walk downs. Involved with the engineering to make several M&R stations and one compressor station bidirectional. Developed Requests for Quote (RFQs) and Requests for Material (RFMs) for multiple customers. Supported Contractor Bid meetings and field site visits as required. Helped create project specific contracts for both pipeline and M&R stations.

    • United States
    • Defense and Space Manufacturing
    • 700 & Above Employee
    • Project Integrator, Project/Team Lead
      • Jan 1986 - Aug 2011

      Project Integrator• Integrated payload and vehicle data into mission dependent configurations through the creation of Data Change Requests containing command and telemetry requirements.• Coordinated the integration of payload and vehicle requirements for reconfiguration of flight software.• Defined telemetry downlink configurations for over 30 flights for all manifested payloads' requirements.• Developed payload software requirements for NASA command and telemetry definition and reconfiguration.• Provided real-time mission support by troubleshooting Shuttle in-flight anomalies.• Performed systems engineering analysis during production and flight software build processes.• Analyzed impact of late requirements for mandatory flight software changes.Project/Team Lead• Served as Lead of the Mission Integration team since April 2009.• Served as chairman of the Data Reconfiguration Discrepancy Report Board (DRDRB) since January 2006, responsible for; 1) Coordinating completion of discrepancy report-related forms, 2) Scheduling and chairing the DRDRB, and 3) Coordinating/presenting completed forms to multiple authorizing Boards, as required.• Reduced discrepancy report processing time by 69% in the first 18 months after becoming chairman of Discrepancy Report Board.• Supported the NASA chaired Cargo Integration Review (CIR) as Avionics Team Lead to ensure payload hardware and software compatibility with the Shuttle systems.• Adhered to meeting NASA Program Office schedule dates for a variety of activities including Data Change Request approvals and publication of the Orbiter Command and Data Annex and the Payload Management (PM) Flight Software Requirements (FSR) on a flight by flight basis.• Served as Chairman for the Data Management configuration control and requirements definition and integration teams.• Performed software performance testing as required in support of the software engineering effort.

    • United States
    • Aviation & Aerospace
    • 700 & Above Employee
    • Engineering Staff
      • Feb 1985 - Jan 1986

      Provided support to senior engineers while gaining experience/knowledge of the payload requirements collection database and with the shuttle system requirements.• System engineered on-board crew displays for numerous shuttle flights.• User representative during development phase of payload requirements collection database.• Acquired extensive working knowledge of reconfiguration process for payload requirements collection. Provided support to senior engineers while gaining experience/knowledge of the payload requirements collection database and with the shuttle system requirements.• System engineered on-board crew displays for numerous shuttle flights.• User representative during development phase of payload requirements collection database.• Acquired extensive working knowledge of reconfiguration process for payload requirements collection.

    • Piping Draftsman
      • Jan 1980 - Jan 1982

      Provided drafting support for the engineering group at the Amoco Chemicals, Chocolate Bayou chemical plant.• Was responsible for creating isometric drawings or updating applicable plan and elevation drawings to reflect required changes.• Was required to ensure drawings matched actual conditions in the field prior to updating drawings. Provided drafting support for the engineering group at the Amoco Chemicals, Chocolate Bayou chemical plant.• Was responsible for creating isometric drawings or updating applicable plan and elevation drawings to reflect required changes.• Was required to ensure drawings matched actual conditions in the field prior to updating drawings.

    • Piping Draftsman
      • Mar 1974 - Jan 1980

      Provided drafting and checking support for a piping fabrication plant.• Created orthographic piping drawings from customer supplied isometric or plan and elevation drawings.• Was responsible for contacting the customer when questions arose about their drawings.• Was responsible for checking others’ drawings to ensure completeness and accuracy prior to release to the fabrication shop. Provided drafting and checking support for a piping fabrication plant.• Created orthographic piping drawings from customer supplied isometric or plan and elevation drawings.• Was responsible for contacting the customer when questions arose about their drawings.• Was responsible for checking others’ drawings to ensure completeness and accuracy prior to release to the fabrication shop.

Education

  • University of Houston
    BS, Mechanical Engineer
    1982 - 1984

Community

You need to have a working account to view this content. Click here to join now