Mark Black

Rigger at Fabricom AS
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Norway
    • Oil and Gas
    • 100 - 200 Employee
    • Rigger
      • Apr 2017 - Present

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Off shore rigger
      • Mar 2016 - Present

      Working on talisman/Montrose project 2 on 2 off Working on talisman/Montrose project 2 on 2 off

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Rigger
      • Apr 2015 - Present

      Working on perenco gas plant dimlington . On the freon pipe replacement project witch is on to offshore Working on perenco gas plant dimlington . On the freon pipe replacement project witch is on to offshore

    • United States
    • Business Consulting and Services
    • 700 & Above Employee
    • Rigger
      • Feb 2015 - Apr 2015

      LINDSEY OIL REFINERY working on a multil million pound petro-chemical plant rigging . Banking cranes slinging loads . Working along side mechanical fitters to remove and replace pipes , spools and valves LINDSEY OIL REFINERY working on a multil million pound petro-chemical plant rigging . Banking cranes slinging loads . Working along side mechanical fitters to remove and replace pipes , spools and valves

    • United Kingdom
    • Professional Services
    • 700 & Above Employee
    • Rigger
      • Jul 2014 - Nov 2014

      Shell Shearwater platform Anasuria FPSO During both Aansuria Fpso and Shell Shearwater platforms annual shutdown I worked as part as the rigging team carrying out vital shutdown maintenance works whilst all the time adhering to LOLER regulations, lift plans, permits and all health and safety procedures on board the platforms. Shell Shearwater platform Anasuria FPSO During both Aansuria Fpso and Shell Shearwater platforms annual shutdown I worked as part as the rigging team carrying out vital shutdown maintenance works whilst all the time adhering to LOLER regulations, lift plans, permits and all health and safety procedures on board the platforms.

    • Steel Erector / Rigging
      • Jun 2010 - Jun 2014

      During my time with Jem Structures I have also been sub-contracted out to Severfield-Rowen Watson Steel.On the sites mentioned above I have undertaken many different roles that included the installation, snagging, Rigging and erecting of steel frames. I have used a wide variety of equipment that included rigging equipment with chain blocks and pull lifts, grinders and magnetic drills. During my time with Jem Structures I have also been sub-contracted out to Severfield-Rowen Watson Steel.On the sites mentioned above I have undertaken many different roles that included the installation, snagging, Rigging and erecting of steel frames. I have used a wide variety of equipment that included rigging equipment with chain blocks and pull lifts, grinders and magnetic drills.

Education

  • Wolfreton

Community

You need to have a working account to view this content. Click here to join now