Mark Black
Rigger at Fabricom AS- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Fabricom AS
-
Norway
-
Oil and Gas
-
100 - 200 Employee
-
Rigger
-
Apr 2017 - Present
-
-
-
Amec Foster Wheeler
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Off shore rigger
-
Mar 2016 - Present
Working on talisman/Montrose project 2 on 2 off Working on talisman/Montrose project 2 on 2 off
-
-
-
CDS Energy Services
-
United Kingdom
-
Oil and Gas
-
1 - 100 Employee
-
Rigger
-
Apr 2015 - Present
Working on perenco gas plant dimlington . On the freon pipe replacement project witch is on to offshore Working on perenco gas plant dimlington . On the freon pipe replacement project witch is on to offshore
-
-
-
Jacobs
-
United States
-
Business Consulting and Services
-
700 & Above Employee
-
Rigger
-
Feb 2015 - Apr 2015
LINDSEY OIL REFINERY working on a multil million pound petro-chemical plant rigging . Banking cranes slinging loads . Working along side mechanical fitters to remove and replace pipes , spools and valves LINDSEY OIL REFINERY working on a multil million pound petro-chemical plant rigging . Banking cranes slinging loads . Working along side mechanical fitters to remove and replace pipes , spools and valves
-
-
-
Wood
-
United Kingdom
-
Professional Services
-
700 & Above Employee
-
Rigger
-
Jul 2014 - Nov 2014
Shell Shearwater platform Anasuria FPSO During both Aansuria Fpso and Shell Shearwater platforms annual shutdown I worked as part as the rigging team carrying out vital shutdown maintenance works whilst all the time adhering to LOLER regulations, lift plans, permits and all health and safety procedures on board the platforms. Shell Shearwater platform Anasuria FPSO During both Aansuria Fpso and Shell Shearwater platforms annual shutdown I worked as part as the rigging team carrying out vital shutdown maintenance works whilst all the time adhering to LOLER regulations, lift plans, permits and all health and safety procedures on board the platforms.
-
-
-
-
Steel Erector / Rigging
-
Jun 2010 - Jun 2014
During my time with Jem Structures I have also been sub-contracted out to Severfield-Rowen Watson Steel.On the sites mentioned above I have undertaken many different roles that included the installation, snagging, Rigging and erecting of steel frames. I have used a wide variety of equipment that included rigging equipment with chain blocks and pull lifts, grinders and magnetic drills. During my time with Jem Structures I have also been sub-contracted out to Severfield-Rowen Watson Steel.On the sites mentioned above I have undertaken many different roles that included the installation, snagging, Rigging and erecting of steel frames. I have used a wide variety of equipment that included rigging equipment with chain blocks and pull lifts, grinders and magnetic drills.
-
-
Education
-
Wolfreton