mariano decaleng
tunnel/tbm foreman at Al Darwish Engineering- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
-
tunnel/tbm foreman
-
-
Silangan Mindanao Mining Co. Inc.
-
1 - 100 Employee
-
AMV JUMBO DRILL OPERATOR/ TRAINOR
-
Jan 2014 - Apr 2015
Specialised in the operations of the AMV JUMBO DRILL 2GCS-CC SERIAL NO. 11-3252 and AMV GROUT PUMPS. The situation underground in the mines are not stable so we drill probe holes in the face (21 holes x 24 -40meters depth) install packers and inject cement using the AMV grout pump to stabilise the ground. we can then drill and blast for production after the injected grout is dry enough. Specialised in the operations of the AMV JUMBO DRILL 2GCS-CC SERIAL NO. 11-3252 and AMV GROUT PUMPS. The situation underground in the mines are not stable so we drill probe holes in the face (21 holes x 24 -40meters depth) install packers and inject cement using the AMV grout pump to stabilise the ground. we can then drill and blast for production after the injected grout is dry enough.
-
-
-
Leighton Asia
-
South horizons, Hongkong
-
JUMBO DRILL OPERATOR/H.E OPERATOR
-
Aug 2012 - Jul 2013
Specialised in the operations of the Robodrill jumbo drills and Caterpillar 725, 740, and 745 articulated dump trucks. Finished contract with the project at site 904 south horizon. Specialised in the operations of the Robodrill jumbo drills and Caterpillar 725, 740, and 745 articulated dump trucks. Finished contract with the project at site 904 south horizon.
-
-
Education
-
quezon memorial colleges
bscommerce, accounting