Mariana Fabiola Sanchez La Concha

Production Engineer at Oil And Gas Career
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Venezuela, VE
Languages
  • Spanish Native or bilingual proficiency
  • English Native or bilingual proficiency
  • French Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Production Engineer
      • Oct 2014 - Present

       General knowledge of all the operation about all surface equipment in the field. Analysis of well productivity. Preparation of gas lift valve change proposals, pressure and temperature well records, mechanical cleaning and chemical cleaning. Supervision of field work (daily operations, coiled tubing, well completion) Using Wellflo and / or Pipesim applying nodal analysis (Inflow-outflow curves, performance analysis, gas lift diagnostics, gas lift valve redesign). Interpretation of dynamic pressure record results. Validation of the production history of the wells. Design of gas and crude distribution networks through the ReO DGO tool. Design of the production method suitable for new wells. Load of data in the system taken in the field (testing, measure, general information).

    • Master Degree Student
      • Aug 2017 - Mar 2018

      A petro-physical evaluation of reservoir B8 VLB 0410 was carried out where 4 new locations were proposed.“Proposal of wells with better Oil Production Potential in New Drainage areas of reservoir B-8 VLB0410 of Block II and XII wells in Maracaibo Lake”.

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • THESIS
      • Apr 2012 - Oct 2012

      It was evaluated the most appropriate network system to reduce the separation pressures in the Flow Station; additionally, was calculated an approximation of the daily production rate of the wells of the flow station was determined by having succeeded in eliminating the bottleneck.“Impact of the decrease in separation pressures on the production rate of the wells associated with the flow station of Block II" It was evaluated the most appropriate network system to reduce the separation pressures in the Flow Station; additionally, was calculated an approximation of the daily production rate of the wells of the flow station was determined by having succeeded in eliminating the bottleneck.“Impact of the decrease in separation pressures on the production rate of the wells associated with the flow station of Block II"

    • Inter
      • Dec 2011 - Mar 2012

      Internships realized in West Division, Petroleum Mixed company Bielovenezolana, Management of Operations. Labor exercised in the Blocks the II and X. Internships realized in West Division, Petroleum Mixed company Bielovenezolana, Management of Operations. Labor exercised in the Blocks the II and X.

Education

  • Universidad del Zulia
    Master's degree in Petroleum Geology
    2015 - 2018
  • Universidad Nacional Experimental 'Rafael María Baralt'
    Gas Engineer
    2008 - 2012

Community

You need to have a working account to view this content. Click here to join now