Maria Carolina Noda Perez

Assistant Project Manager -Planner Scheduler Data Center / Hospital Projects. at Batchelor & Kimball, Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Tulsa Metropolitan Area

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Construction
    • 100 - 200 Employee
    • Assistant Project Manager -Planner Scheduler Data Center / Hospital Projects.
      • Jul 2018 - Present

      I'm a Assistant Project Manager and Project Planner - Scheduler and Control, utilizing scheduling tools to develop baseline schedule, in according with work company procedures, coordinating inputs from all stakeholders: tasks, constrains, variables, time, resources, critical path, and budget. I also collaborate with Project Manager to elaborate documents control, Management progress reports and curves, physical and financial execution profiles, biweekly and monthly reports, project general status, and all related to planning and control of projects executed by this management.In this position was when I enter to take experience in the field of civil works, because for many years I was only working with Oil and Gas, I have acquired lot of knowledge of mechanical design, piping systems, Plumbing, Insulation as well as everything about Sheetmetal, and Cooling Systems through all contract drawings and with the Field Staff, my responsibilities have been:• Create schedules in P6 or MS-PROJETS, when the PM is assigned to the Project in an effective manner through review of project scope, drawings and objectives. • Elaborate the Master Schedule of the civil work in construction, for the subs, of each specialty, sheet metal, plumbing, ductwork, insulation, mechanical, HVAC systems.• Define activities, durations, and relationship logic to implement the project plan and contain milestones to represent key decisions and deliverables that take place during execution.• After the schedule is prepared, take control and advancement of the work, controlling through the software Ms Projects and P6 Primavera.• Developing solutions plans for streamlining processes and mitigating risks so that constructions will be done at time.• Follow progress of jobs from start to finish & take necessary action with production control to maintain schedule periods. Show less

    • Project Planner -Scheduler
      • Jul 2018 - Present

      I'm an Industrial Engineer working in a position Assistant Project Manager/ Planner- Scheduler , Construction Area for HVAC Systems, Sheet Metal (Duct- Work) , Plumbing, Insulation, CX- Commission, using Microsoft Project MS, or P6 Primavera software for planning and scheduling in my 2 last year, before I was working in same position but Oil, and Gas.

    • Project Coordinator
      • Jan 2014 - Jan 2016

      I was assigned as a part of compression plant of gas team from Tia Juana lake Maracaibo Zulia State, The purpose of this was to apply Project Management skills at compression Gas Plant. The main projects where I have where I have participate are Iinstallation of a gas compression module in the Tia Juana compressor plant 4 Maracaibo lake, these projects are too important for developing more capacity in compression gas around 100 MPC GSD, water plant installation served in the compressor plants of Maracaibo lake, main responsibilities: • Define (scope) and implement project plan in accordance with the business plan. • Assure projects legal documents are completed and signed for each project. • Coordinate the interaction with internal departments and external mentors. • Define and manage overall changue control processes and quality assurance aspects of the projects to ensure projects success. Show less

    • PLANNING TEAM LEADER
      • Jan 2008 - Nov 2013

      As a planning leader I have worked within for areas in the Maracaibo Lake Zulia State, called Complex North, Suth, Lake lagunillas and Center Occidente Area, (compression gas plants conventional and modular) main responsibilities : • Managing and reporting.• Recommending and implementing improvements to the planning cycle ( tools, processes, capabilities )• Maintaining in year portfolio assurance processes, including demand and capacity management.• Bring together investment and operational expenditure planning in terms of both prioritization and impact on future operating expenditure.• Accurate timely reporting of our progress to the yearly plan includes defining and implementing the appropriate reporting metrics • Managing the reporting of the monthly operational review and coordinating the appropriate reporting metrics.• Identifying and tracking delivery risks to the portfolio.• Ensure there is sufficient capability and capacity within each function to support the planning processes. Show less

    • BUYER AND PROCUREMENT PLANNER
      • Jun 2007 - May 2008

      This position gave me the opportunity to learn about the procurement process with PDVSA Bariven, which is responsible for supplying all materials for oil and gas productions within PDVSA industries . Here I learned all the procedures to buy material from a wide variety of suppliers. Thereafter, I focused on procurement planning which is other area within the procurement process. The software used was SAP MM Modules: Requisitions, purchase orders, goods receipts, and Inventory managements. Main responsibilities:• Expedite all goods to ensure goods arrive on time.• Highlighting problems to customer if there is a delay.• Liaise with suppliers and in-house departments on delivery information.• Follow up on supplier non- conformance reports from the QA- department.• Dealing with technical queries from customer service department/ suppliers.• Arrange transport for incoming goods and liaise with the goods- In department.• Optimize the corporate inventory levels by using sound materials and demand- management principles.• Maximize cost savings and cost avoidance efforts. Show less

    • Project Scheduler
      • Aug 2003 - Mar 2007

      This position was my initial work like engineer in the world compression natural gas within for areas in the Maracaibo Lake Zulia State, called Complex North, Suth, Lake lagunillas and Center Occidente Area, (compression gas plants conventional and modular) main Responsibilities: • Perform the annual preventive maintenance plan for gas compression plants according to the manufacturer's recommendation. • Carry out the annual purchase plan of spare parts and materials for the execution of the preventive maintenance plan to the gas compressor plants through SAP software. • Elaborate the annual budget of expenses and investment for the execution of preventive maintenance and projects in the gas compressor plants through SAP Software. • Carry out contracts with third parties for the execution of special instrumentation, civil, mechanical coating activities to be performed at gas compression plants. • Planning and Schedule the annual maintenance plan through P6 or MS Project software to be run in gas compressor plants. • Control all investment projects budget progress and hold meetings with the investment project team. • Perform reports on compliance with the annual maintenance plan of the compressor plants to be shown to management Show less