MCA
-
Portugal
-
Investment Management
-
200 - 300 Employee
-
Project Manager-Solar PV Medium/Hi Voltage
-
Jul 2021 - Present
Medium/Hi Voltage Substations and Hi Voltage Overhead Lines Transmissions Medium/Hi Voltage Substations and Hi Voltage Overhead Lines Transmissions
-
-
-
-
Diretor de obras
-
Nov 2020 - Apr 2021
Diretor de Obra Especialidades (Inst.Eléctricas, Segurança, Sistemas Controlo de Desenfumagem, CCTV, Telecomunicações), Instalações Iluminação Led, AVAC, Sistema de Som com Gestão Centralizada. Diretor de Obra Especialidades (Inst.Eléctricas, Segurança, Sistemas Controlo de Desenfumagem, CCTV, Telecomunicações), Instalações Iluminação Led, AVAC, Sistema de Som com Gestão Centralizada.
-
-
-
-
Coordenador Geral Fiscalização
-
Apr 2019 - Nov 2020
Coordenador Fiscalização (Topografia, Const,Civil, Alta/Média/Baixa Tensão) Subestação Gabela 220Kv 2.1 Reabilitação E Expansão Da SE Gabela 220/60 kV E Construção Nova SE Gabela 60/30 kVPARQUE 220 kV• Fornecimento e montagem de cinco (5) Posições de Linha de 220 kV.• Fornecimento e montagem de dois (2) Painéis de Transformadores 220/60 kV.• Fornecimento de um (1) e montagem de dois (2) Transformadores Trifásicos 220/60 kV (60 MVA).PARQUE 60 kV• Fornecimento e montagem de dois (2) Posições de Linha de 60 kV.NOVA SE 60/30 kV• Fornecimento e montagem de dois (2) Posições de Transformadores 60/30 kV.• Fornecimento e montagem de dois (2) Transformadores 60/30 kV de 20 MVA cada um.• Construção de novo edifício para a SE 60/30 kV.• Conjunto de celas de 30 kV.
-
-
-
Vitor Hugo - Coordenação e Gestão de Projectos S.A.
-
Portugal
-
Civil Engineering
-
100 - 200 Employee
-
Coordenacao e Gestao de Projectos
-
Dec 2016 - Apr 2019
Fiscalização Especialidades (Inst.Eléctricas, Postos de Transformação, Rede de Telecomunicações, CCTV, Gestão Centralizada, Sistemas de Segurança (SADI, SADIR, Controlo de Acessos) Centros Comerciais Avennida, Lojas Grupo Zahara Xiami, Rede Bancos Caixa Angola, Condomínio Habitacionais de Luxo,Pavilhão Armazenamento Produtos Farmacêuticos, Centralidade Habitacional c/PT's Aéreos e Subestação 60Kv, etc Fiscalização Especialidades (Inst.Eléctricas, Postos de Transformação, Rede de Telecomunicações, CCTV, Gestão Centralizada, Sistemas de Segurança (SADI, SADIR, Controlo de Acessos) Centros Comerciais Avennida, Lojas Grupo Zahara Xiami, Rede Bancos Caixa Angola, Condomínio Habitacionais de Luxo,Pavilhão Armazenamento Produtos Farmacêuticos, Centralidade Habitacional c/PT's Aéreos e Subestação 60Kv, etc
-
-
-
ISOLUX CORSAN
-
Spain
-
Construction
-
700 & Above Employee
-
Dir.Tecnico Centrais Electricas Geracao em Plataforma Flutuante
-
Nov 2015 - Aug 2016
Central Térmica 2 Turbinas 50MW/Cada, Subestação Elevatória com 2 Transformadores 60Kv/20Kv, operação e manutenção Central Térmica 2 Turbinas 50MW/Cada, Subestação Elevatória com 2 Transformadores 60Kv/20Kv, operação e manutenção
-
-
-
Mitrelli
-
Switzerland
-
International Trade and Development
-
200 - 300 Employee
-
Project Manager Hi-Voltage Energy Constructions / Mitrelli Group
-
Sep 2013 - May 2015
Construction and Building Energy Projects Low/Médium/Hi-Voltage/Subestations In Angola with ISRAEL main Enterprise Cover ELCOSubstations 60Kv/30Kv/15Kv and 220Kv/60Kv/30Kv Construction and Building Energy Projects Low/Médium/Hi-Voltage/Subestations In Angola with ISRAEL main Enterprise Cover ELCOSubstations 60Kv/30Kv/15Kv and 220Kv/60Kv/30Kv
-
-
-
-
Project Manager Renewable Energy and Building / Angolaca Group
-
Nov 2011 - May 2013
Partnership with the provincial government and ministry of energy in building renewable energy with solar panels supplying water pumps, around Angola; 120 systems suppling water by solar panels, civil and electrical works, Boreholes of water, water analysis, treatment and energy distribution with government project "water for everyone". Partnership with the provincial government and ministry of energy in building renewable energy with solar panels supplying water pumps, around Angola; 120 systems suppling water by solar panels, civil and electrical works, Boreholes of water, water analysis, treatment and energy distribution with government project "water for everyone".
-
-
-
CJR Renewables
-
Portugal
-
Construction
-
300 - 400 Employee
-
Project Manager
-
Apr 2010 - Apr 2011
CJRWIND is a national company specializing in the construction of windfarms civil and electric works with 80 employees.Main responsibilities:• Reported to General Manager, headquarters in Portugal;• I had a team of 30 people (10 local and 20 expatriate staff), including one Engineer, a General Officer, and a Security Coordinator;• Preparation of Work Plans;• Creation / introduction of procedures for the execution of critical tasks;• Definition and negotiation of purchases of equipment and materials to national and international suppliers;• Management of different people under my responsibility;• Monitoring the activities of Subcontractors, used to cover “peak workloads”;• Redefinition and optimization of the functions performed by individual employees;• Execution and implementation of proposals for extraordinary works;• Throughout the duration of my stay in Jamaica, coordinated the construction of a wind farm consisting of a 26MVA substation, with one Command and Control Building with two floors, Post Guard, Warehouse with about 600m2, 9 Wind Turbine with 2MW each one, one Meteorological Tower and more hits and foundations and concreting.
-
-
-
JdC (Jayme da Costa)
-
Portugal
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Project Manager
-
Jul 2002 - Feb 2009
JAYME DA COSTA is a Portuguese company specializing in the manufacture and installation of electrical medium and high voltage (Power Station, Substations and Renewable Energy; Windfarms, Hydroelectric Plants, Biogas Plants, Cogeneration Plants and Photovoltaic Panels ) with about 180 workers.Main responsibilities:• Reported to the General Manager;• leading about 50 employees, including an Engineer, 2 Officers, 2 Team Leaders, and about 30 Electricians;• Preparation of all works and their work plans, including the purchase and trading of different equipment;• Hiring Subcontractors to perform specific jobs and to cover peak workloads and supervision / control of the work of the same;• Creation / introduction of working procedures for each type of work;• Preparation of financial reporting / planning and monthly billing for work;• General coordination and monitoring of various works in progress, in terms of costs and timings for implementation;• Redefinition and optimization of the functions performed by different employees.Main works:• Medium Voltage Substation and Hydroelectric Plant “Alqueva-Pedrogão”-Pedrógão ( 2 Grupos 5MVA / 6.6 Kv)Electrical Installations, Security, Telephone and Data Center• Windfarm “Cabeço Rainha II” (Oleiros / Sertã) -15 Wind Turbines with 2MW each one, Medium Voltage Switching Station and Substation 31.5 MVA;• Building of new Factory of Pasta “Milaneza” in Maia (Electrical Installation, Data Networking, Fire Detection, CCTV, Fire Fighting, Transformation 15Kv / 3.2 MVA)-Interconnection of Comunications with existing Office;• Subway in Oporto-Electrical Installations, Telecommunications, Energy and Security in Building PMO Guifões and their communications with Main Build, Signaling and Control of Inside and and Exterior Catenary Set the PMO to the Workshops of the PMO
-
-
-
SPIE Oil & Gas Services
-
France
-
Oil and Gas
-
700 & Above Employee
-
Project Manager
-
Oct 2001 - Jun 2002
OELE is a U.S. multinational, specialized in the construction of Electrical Installations, Telecommunications and Security with about 150 employees.Main responsibilities:• Leading about 50 employees: 1Engenheiro, 2 Officers, 2 Team Leaders, and about 45 electricians;• Preparation of all works and Plans;• Definition and preparation of purchase of different equipment and construction materials, and subsequent negotiation and purchase them;• Select, negotiate the contract and monitoring the activities of Subcontractors used to cover "peak workloads;• Redefinition and optimization of the functions performed by different employees.Major works carried out:• Resort-Residences Foz Douro Porto / Sonae Investimentos, 61 Apartments, Commercial Building with Electrical Installations, Telecommunications, Security System and Access Control.• S.Pedro-Vila Real Hospital, Intensive and Intermediate Care expansion, with electrical installations, facilities and Telecommunications Security. • Tunnel 4 (Praça das Flores in Oporto), work with controlling EIB system, lighting and SD-VIEW (management of air conditioning)
-
-
Education
-
Instituto Superior de Engenharia do Porto
Bacharel, EngªElectrotécnica-Sistemas de Energia